Sec. 21-6.8.3. Resiliency measures.
About this text
- As published by Municode, current through 2024-04-17
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
A. Tree canopy category measures.
1. Full-site preservation. Preserve all existing trees over six (6) inches DBH on the development site.
2. Surplus tree planting. Addition of ten (10) percent improvement over the tree canopy requirements above any city regulations, provided the additional tree canopy is advisable and will not impact overall survivability or health of existing or added trees. Tree varieties shall be large deciduous shade trees from parks and greenspace trees from official tree species list provided in section 17-46.
3. Specimen tree preservation. Preservation of a minimum of two (2) specimen trees on the property,
4. Specimen stand preservation. Preservation of a contiguous grouping of specimen trees and other high-value trees. Determination is based upon the following criteria:
a. A relatively mature, even-aged stand.
b. A stand with purity of species composition or of a rare or unusual nature.
c. A stand of historical significance.
d. A stand with exceptional aesthetic quality.
B. Energy category measures.
1. Energy efficiency. Newly constructed buildings demonstrate an average ten (10) percent improvement over the energy code currently in effect in the city.
2. Renewable energy. Incorporate renewable energy generation on-site with production capacity of at least five (5) percent of the building's annual electric or thermal energy, established through an accepted building energy performance simulation tool. The following renewable energy generation sources are applicable: solar thermal or photovoltaics, ground-sourced heating or cooling. Fuel cells or microturbines using non-fossil fuel, wind energy conversion. Other means of generating electricity without using a fuel, such as kinetic, heat exchange, approved by the city manager.
3. Green roof Install a vegetated roof for at least fifty (50) percent of any building roof area or roof deck. Green roofs used to satisfy this resiliency measure shall not count toward any other open space requirement. A minimum of two thousand five hundred (2,500) square feet is required to receive credit.
4. Heat island reduction. Use of any combination of the following strategies for thirty-five (35) percent of all on-site, non-roof hardscape areas, including sidewalks, plazas, courtyards, parking lots, parking structure, and driveway: coverage of the surface canopy tree maturity in fifteen (15) years, and/or solar reflective paving and roofing with a solar reflectance of greater than 0.25.
5. Energy efficient fixtures. Installation of ENERGY STAR appliances and LED light bulbs for a minimum of eighty (80) percent of the fixtures and equipment. If there is not an ENERGY STAR option available in the market, those fixtures do not need to be included in the calculation.
C. Water category measures.
l. Building water efficiency. Installation of WaterSense plumbing fixtures with the following minimum efficient rates:
a. Toilets: 1.1. gpf
b. Urinal: 0.125 gpf 3
c. Faucets/aerator: 1.0 gpm, unless a higher flow rate is dictated by sink use (e.g., kitchen prep sink).
2. Water-efficient landscaping. Reduce potable water used for landscape irrigation by fifty (50) percent from a calculated midsummer baseline case by using either one (1) of the following methods: utilizing all xeriscape plant materials and providing no permanent irrigation system or using only captured rainwater with an irrigation system.
3. Green infrastructure. Install bioswales or other green infrastructure in lieu of a minimum of ten
(10) percent traditional stormwater facilities. Easements shall be recorded at DeKalb Superior Court with a minimum radius extending five (5) feet out from the bioswale boundaries to ensure installments are maintained in perpetuity.
4. Peruious pavement. Install an open grid or pervious pavement system on sixty-five (65) percent of all hardscape surface areas, including sidewalks, plazas, courtyards, parking lots, and driveways. The water shall be directed into the groundwater or other acceptable storm accommodation per the city manager. To receive credit for this measure, the installation shall be accompanied by a maintenance schedule to ensure the pavement maintains its designed performance.
5. Water reclamation. Install a water collection device to be used in lieu of potable water for irrigation, water features, etc.
D. Transportation category measures.
l. Bicycle repair center. Provide a designated bicycle repair center open to the public and consisting of, at least one (1) air pump, water, and basic tools for minor repairs.
2. Electric vehicle parking with charging. Provide a minimum offive (5) percent of parking spaces dedicated to electric vehicle charging, with not less than two (2) spaces provided. Spaces shall be equipped with at least level 2 chargers and shall be signed accordingly. Spaces used to satisfy this resiliency measure shall not count toward any other EV parking requirement.
3. Rideshare drop-off Construct a turnout on development property and dedicate curb space for a minimum of two (2) rideshare drop-off locations adjacent to street right-of way. Spaces shall be signed accordingly.
E. Public heath category measures.
1. Health impact assessment. Commission a health impact assessment and address a minimum of ten (10) percent of the design-related recommendations.
2. Walkability. Increase the width of any required sidewalk so the dimension of the unimpeded sidewalk is a minimum of either nine (9) feet (small) or eleven (11) feet (large) wide. If the minimum sidewalk width is greater than this walkability standard, it shall not be counted toward minimum resiliency requirements.
3. Physical activity. Provide graded and grassed lawns to support running and active play.
Physical activity measures will receive credit for providing lawns that are a minimum of either one hundred (100) feet wide by fifty (50) feet deep (small) or one hundred fifty (150) feet wide by seventy-five (75) feet deep (large). Credit will only be given if the space allocated for physical activity is above and beyond the minimum requirements of section 21-6.3.5 - open space.
F. Arts measures.
1. Visual public art. Incorporate public art into the design of the project. The city manager shall maintain a list of public art installations that are approved for purposes of this section. By incorporating approved public art into the design of the project, credit will be given per this section. However, a single art installation may not be used for credit under this section and be used concurrently to satisfy the amenity requirements of section 21-6.3.5 - open space.
2. Outdoor performing arts facility. Provide a stage or other surface for the use or rental of the community to perform outdoor concerts and performances. The venue shall allow for space for an audience of at least thirty (30) people standing to experience the performances.
3. Open air market. Provide facilities for a minimum of five (5) booths at least one hundred (100) square feet in size a piece in an open-air market. Facilities shall be equipped with access to power, loading areas, and shall provide visibility and pedestrian access for patrons when the space is activated.
4. Arts space or venue. Allocate and program a minimum of two thousand (2,000) square feet or ten (10) percent of the building area, whichever is less, to an arts use. Examples of art uses include museums, galleries, classroom and/or production space, and performing arts venues. To receive credit for this measure, the space shall be deed restricted until such a time that redevelopment occurs or an alternate resiliency measure is fulfilled.
G. Sustainable certification. Certification through EarthCraft, LEED, Green Globes (three (3) globes minimum to receive credit for this measure), National Green Building Standard (NGBS) (silver minimum to receive credit for this measure), or another comparable third-party certification program approved by the city manager.
H . Alternative measures. The applicant may submit an alternative resiliency development measure for approval by the city manager_ The measure shall further a resiliency goal and shall not be considered standard practice for current developments. The measure shall be unrelated to any of the other measures defined in this section. Based upon their review, the city manager shall approve for the number of points to be awarded. Required documentation shall clearly illustrate that the measure furthers a resiliency goal.
Table 21-6.8.3 - Resiliency Measures and Values Category Measure Value TREE CANOPY Full-Site Preservation 3 points Surplus Tree Planting 2 points Specimen Tree Preservation 1 point Specimen Stand Preservation 2 points ENERGY Energy Efficiency 3 points Renewable Energy 4 points Green Roof 3 points Heat Island Reduction 2 points Energy Efficient Fixtures 1 point WATER Building Wa ter Efficiency 2 points Water Efficient Landscaping 1 point Green Infrastructure 2 points Pervious Pavement 3 points Wa ter Reclamation 1 point TRANSPORTATION Bicycle Repair Center 1 point Electric Vehicle Parking with Charging 2 points Rideshare Drop-off 1 point PUBLIC HEALTH Health Impact Assessment 4 points Walkability - Small 2 points Walkability - Large 3 points Physical Activity - Small 3 points Physical Activity - Large 4 points ARTS Visual Public Art 1 point Outdoor Performing Arts Venue 1 point Open Air Market 2 points Arts Space or Venue 4 points ALTERNATIVE Sustainable Certification 5 points Alternative Measures 1 to 3 points