Skip to content
Georgia Commons
Menu

Avondale Estates · Zoning Ordinance

Appendix A / Chapter 21 - ZONING ORDINANCE / Article 6 - SITE DEVELOPMENT FEATURES / Division 6.8 - RESILIENCY REQUIREMENTS

Sec. 21-6.8.2. Calculation and evaluation.

About this text

  • As published by Municode, current through 2024-04-17
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. Minimum points required.

1. Commercial, mixed-use, and MF-zoned projects.

a. Projects shall achieve a minimum of six (6) points from any combination of the resiliency measures as valued in table 21-6.8.3 - resiliency measures and values.

b. Points shall be obtained by implementing measures from a minimum of two (2) different parent "categories" identified in table 21-6.8.3 - resiliency measures and values. Categories include: tree canopy, energy, water, transportation, public health, arts, and alternate. For PUDs enabled in division 3.3 - planned unit development (PUD) district, a minimum of three (3) categories shall be utilized. Implementation of only one (1) measure from the arts category may count toward the minimum points required.

c. Projects with parking lots of twenty (20) spaces or greater are required to provide EV charging spaces in accordance with section 21-6.2.7.A - electric vehicle charging stations.

2. Each lot for single-family development shall achieve a minimum of three (3) points from any combination of measures as valued in table 21-6.8.3 - resiliency measures and values (i.e.: each lot in a project).

B. Minimum requirements. All points shall be awarded based on meeting the minimum requirements of each resiliency measure, as indicated in this division.

C. Newly constructed measures. Measures count only if they are part of the new development application; measures already in place at the time of application do not count, unless otherwise approved by the city manager.

D. Required documentation. The following documentation is required:

1. Documentation of which measures and total number of points the applicant will achieve shall be indicated on the development or building permit application submitted to the city.

2. Documentation is required to clearly illustrate the extent to which the minimum requirements of each of the selected measures is to be met through permanent construction or policies.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:avondale-estates/zoning/21-6.8.2@2024-04-17-4394c0eb1c

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Avondale Estates Zoning Ordinance, Sec. 21-6.8.2. Calculation and evaluation | Georgia Commons