Ir al contenido
Georgia Commons
Menú

Avondale Estates · Ordenanza de zonificación

Appendix A / Chapter 21 - ZONING ORDINANCE / Article 6 - SITE DEVELOPMENT FEATURES / Division 6.8 - RESILIENCY REQUIREMENTS

Sec. 21-6.8.2. Calculation and evaluation.

Sobre este texto

  • As published by Municode, current through 2024-04-17
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A. Minimum points required.

1. Commercial, mixed-use, and MF-zoned projects.

a. Projects shall achieve a minimum of six (6) points from any combination of the resiliency measures as valued in table 21-6.8.3 - resiliency measures and values.

b. Points shall be obtained by implementing measures from a minimum of two (2) different parent "categories" identified in table 21-6.8.3 - resiliency measures and values. Categories include: tree canopy, energy, water, transportation, public health, arts, and alternate. For PUDs enabled in division 3.3 - planned unit development (PUD) district, a minimum of three (3) categories shall be utilized. Implementation of only one (1) measure from the arts category may count toward the minimum points required.

c. Projects with parking lots of twenty (20) spaces or greater are required to provide EV charging spaces in accordance with section 21-6.2.7.A - electric vehicle charging stations.

2. Each lot for single-family development shall achieve a minimum of three (3) points from any combination of measures as valued in table 21-6.8.3 - resiliency measures and values (i.e.: each lot in a project).

B. Minimum requirements. All points shall be awarded based on meeting the minimum requirements of each resiliency measure, as indicated in this division.

C. Newly constructed measures. Measures count only if they are part of the new development application; measures already in place at the time of application do not count, unless otherwise approved by the city manager.

D. Required documentation. The following documentation is required:

1. Documentation of which measures and total number of points the applicant will achieve shall be indicated on the development or building permit application submitted to the city.

2. Documentation is required to clearly illustrate the extent to which the minimum requirements of each of the selected measures is to be met through permanent construction or policies.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:avondale-estates/zoning/21-6.8.2@2024-04-17-4394c0eb1c

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Avondale Estates Zoning Ordinance, Sec. 21-6.8.2. Calculation and evaluation | Georgia Commons