11.5.6 Projecting signs. Any sign with an element that would project more than five feet outside the main body of the sign area, in any direction, requires an administrative variance from the Zoning Administrator. A sign that is attached at an angle to the wall may extend outward no more than five feet, and requires an administrative variance from the Zoning Administrator.
(Ord. of 7-21-2021(4)) Sec. 11.6. Safety and construction standards.
11.6.1 Official confusion. Signs which contain or are in imitation of an official traffic sign or signal, or can be confused with an official traffic sign, are prohibited.
11.6.2 Fire safety. No sign or sign structure may be erected or maintained which obstructs any fire escape, ventilation, or door; nor shall any sign or sign structure be attached to a fire escape.
11.6.3 Corner visibility. No sign or sign structure above a height of three feet shall be maintained within 15 feet of the intersection of the right-of-way lines of two streets, or of a street intersection with a railroad right-of-way.
11.6.4 Traffic visibility and safety. No sign shall obstruct the traffic sight line, or the view of vehicles entering the roadway (i.e., the view of oncoming traffic by vehicles attempting to enter the road, or vice versa). No sign shall be erected on any traffic island. No sign shall create a traffic hazard. Sign locations shall be approved by the Road Department if a safety question is raised by the Zoning Administrator.
11.6.5 Good repair. All signs, together with all their supports, braces, guys, and anchors shall be kept in good repair.
11.6.6 Temporary sign standards. All temporary signs shall be made of waterproof material, and must be attached to an independent mounting device no more than forty (40) inches above ground level. The mounting must be secure to prevent the sign from blowing off the device. The mounting device shall bear the name and phone number of the party responsible for the device.
11.6.7 Removal of unsafe signs and safety hazards. The County may remove a sign in violation of this Ordinance, without giving notice to any party, if said sign is upon the public right-of-way or upon other public property; or said sign poses an immediate safety threat to the life or health of any members of the public.
(Ord. of 7-21-2021(4)) Sec. 11.7. Prohibited signs.
The following types of signs are prohibited, as stated:
11.7.1 Roof Signs (which means signs mounted above a roof or projecting above the roof-line of a structure).
11.7.2 Rotating signs.
CDA:131 Supp. No. 14
11.7.3 Portable signs (which means signs which are attached to vehicles, trailers, movable structures, or attached to sign structures which are not permanently anchored into the ground, or any sign which may be transported or is designed to be transported). Such signs include, but are not limited to, printed banners or billboards attached to vehicles and trailers. Inflatable figures and objects (e.g., creatures, beer cans) fall into this category.
11.7.4 Swinging or projecting signs, unless an administrative variance is granted by the Zoning Administrator. No such sign can project more than five feet, and in no case shall this type of sign exceed ten square feet in sign area. See Sec. 11.5.6.
11.7.5 Mechanical signs, or signs with moving parts. This includes signs with mechanized or moving elements; "trivision"-type signs; signs with waiving elements, whether motorized or wind-powered; "multiple message signs" as defined in O.C.G.A. § 32-6-71; or similar moving signs. However, signs that do not move or change more than six times per day are permitted.
11.7.6 Signs with flashing or blinking lights. This includes, but is not limited to, signs of varying light intensity, and signs containing exposed neon tubing. Signs with reflective elements that sparkle in the sunlight or that contain luminous paint that glows in the dark are not allowed.
11.7.7 LED and electronic signs. This includes, but is not limited to, signs displaying moving pictures, images or animation; LED (light emitting diode) signs; LCD (liquid crystal display) signs; digital signs; "TV" type signs; EVMC (electronic variable message center) signs; signs that spell words or create images with numerous small lights or other internal illumination; and similar electronic or digital signs. A limited exception to this prohibition is permitted under section 11.5.4 above. Externally illuminated, electronically controlled, segmented sign display elements are not prohibited. Digital billboards (also known as LED billboards) shall not be permitted. Existing Digital billboards existing as of the date of this amendment (July 10, 2019) shall become nonconforming uses.
11.7.8 Courtesy benches, trash cans, and similar devices displaying signs.
11.7.9 Trailer signs (which means signs mounted on trailers, exceeding two square feet).
11.7.10 Sidewalk, A-type, sandwich or curb-type signs placed on sidewalks.
(Ord. of 7-21-2021(4)) Sec. 11.8. Purposes; intent; studies considered; cases considered.
11.8.1 Purposes. It is the purpose of Bartow County in enacting Article XI to provide standards to safeguard life, public health, property and welfare by regulating the location, size, illumination, erection, maintenance and quality of materials of all signs. More specifically, signs have a powerful impact on the aesthetic environment of the community, and it is the purpose of this Ordinance to encourage an aesthetically attractive environment, allowing sufficient opportunities for communications to serve business, interest groups and the public, while complying with the Federal and State Constitutions and laws. Signs create visual clutter and therefore should be regulated in their size, location, construction and illumination. Signs can detract from the beauty of the neighborhood and lower property values. In seeking to comply with federal and state law, the County has determined the following: large signs are, as the U.S. Supreme Court has recognized, an aesthetic harm; the Georgia Supreme Court has upheld sign regulations on the basis of aesthetics and preserving the beauty of environment; and, the Eleventh Circuit has recognized portable signs are visual clutter and a potential traffic hazard. These holdings show that the County's ordinance is within the law and constitutional, which is a goal of the County. The goal of this Article is to avoid being an impermissible content-based regulation, and instead to be a permissible time, place and manner restriction.
Many signs can also be a hazard and negatively impact traffic safety, by distracting drivers and blocking views of other vehicles and dangers, by making intersections more treacherous, and by making it difficult to see oncoming traffic when entering a roadway. The County finds that especially distracting to drivers are moving signs, digital signs and electronic signs that resemble televisions or computer screens. Therefore, it is also the purpose of this Ordinance to prevent those harms by regulating signs to safe locations, safe sizes, with proper and safe illumination and construction, or to prohibit signs that are too distracting.
Finally, it is the belief of the County that more communication is desirable during the election cycle, so that all citizens may freely express their viewpoints during the election campaigns, and therefore the ordinance allows increased opportunities to erect signs during these periods, without limiting content or favoring content in any fashion. At all times, any sign permitted under this regulation can carry any message, political or non-political, commercial or non-commercial.
11.8.2 Intent. In adopting Article XI, it is the intent of Bartow County to:
(A) balance the right of individuals to convey their messages through signs and the right of the public to be protected against the unrestricted proliferation of signs; and
(B) further the objectives of the County's Future Land Use Map and sound planning principles and objectives; and
(C) protect the public health, safety and welfare; and
(D) reduce traffic and pedestrian hazards; and
(E) maintain the historical and cultural heritage and image of the County; and
(F) protect property values by minimizing the possible adverse effects and visual blight caused by signs; and
(G) avoid the harmful aspects of the unrestricted proliferation of signs; and
(H) promote economic development and tourism; and
(I) protect private property values; and
(J) ensure the fair and consistent enforcement of sign regulations.
CDA:133 Supp. No. 14
11.8.3 Studies Considered. Having considered the following studies, which the Bartow County Commissioner finds to be relevant, useful and applicable to Bartow County, Georgia, the County finds that the size, location and quantity of sign structures within the County must be regulated in order to achieve the above-stated intents and purposes:
University of Georgia Land Use Clinic (2003, June 26). Sign Control on Rural Corridors: Model Provisions and Guidance.
Wisconsin Department of Transportation (1994, December). Milwaukee County Stadium Variable Message Sign Study: Impacts of an Advertising Variable Message Sign on Freeway Traffic.
Scenic America (2007). Billboards in the Digital Age: Unsafe (and Unsightly) at Any Speed. Scenic America Issue Alert.
Nasar, Jack L. and Hong, Xiaodong (1999, September). Visual Preferences in Urban Signscapes. Journal of Environment and Behavior, 31(5), 671-691.
Office of Safety Research and Development, Federal Highway Administration (2001, September 11). Research Review of Potential Safety Effects of Electronic Billboards on Driver Attention and Distraction.
U.S. Department of Transportation.; New York State Department of State, Division of Local Government Services (2006, January). Municipal Control of Signs. James A. Coon Local Government Technical Series.
Weinstein, Alan C. A Study of Local Regulation of Outdoor Advertising in 268 U.S.
Jurisdictions. Outdoor Advertising Association of America, Inc.
City Club of Portland (1996, September 6). Billboard Regulation in Portland. City Club of Portland Bulletin, 78(13), 1-40.
Smily, Alison and Persaud, Bhagwant, et al (2005). Traffic Safety Evaluations of Video Advertising Signs. Transportation Research Record: Journal of the Transportation Research Board, No. 1937, 105-112.
Such studies, which were considered by the Commissioner prior to adoption of this provision, are part of the official record of the adoption of this Ordinance.
11.8.4 Cases Considered. In adopting these sign regulations, the Bartow County Commissioner especially recognizes the vast number of court decisions, coming from Georgia courts, the federal courts, and courts throughout the United States, which recognize that the regulation of the size, location and quantity of sign structures is a valid and lawful means of achieving the above-stated intents and purposes, and that such intents and purposes are valid and lawful governmental interests, which include the following:
Granite State Outdoor Advertising, Inc. v. Cobb County, Ga., 193 Fed.Appx. 900 (C.A.11th 2006)(finding that the stated goals within a sign ordinance of protecting against traffic hazards and the adverse impact on the county's aesthetic qualities are substantial government interests); Gregory v. Clive, 2007 WL 2914515 (Ga. S.Ct. 2007)(recognizing as within a local government's police power to enact legislation governing billboards and signs, as such legislation clearly addresses the public health, safety, or general welfare of the community); H & H Operations, Inc. v. City of Peachtree City, Ga., 248 Ga. 500 (1981)(holding that, under its police power, a municipality can enact and enforce reasonable regulations governing the erection and maintenance of signs within its jurisdiction); Harnish v. Manatee County, Florida, 783 F.2d 1535 (C.A. 11th 1986)(finding that aesthetics is a substantial governmental goal which is entitled to and should be accorded weighty respect, and that the governmental entity charged with the responsibility of protecting the environment must be given discretion in determining how much protection is necessary and the best method of achieving that protection); Lamar Advertising Company v. City of Douglasville, Ga., 254 F.Supp.2d 1321 (N.D.Ga. 2003)(finding that where a sign ordinance asserts the goals of public safety, traffic safety, health, welfare and aesthetics, a municipality has shown an important or substantial governmental interest unrelated to the suppression of free speech); Metromedia, Inc. v. City of San Diego, 453 U.S. 490 (1981)(holding that the goals of traffic safety and aesthetics advanced by a municipality as justification for regulating signs is a substantial governmental interest); St. Louis Poster Advertising Co. v. City of St. Louis, 249 U.S. 269 (1919)(finding that billboards may be prohibited in the residential districts of a city in the interest of the safety, morality, health and decency of the community); Members of the City Council of the City of Los Angeles v. Taxpayers for Vincent, 466 U.S. 789 (1984)(finding that a government entity can regulate signs and billboards when necessary to advance a significant and legitimate state interest, such as the protection of the aesthetics and quality of life within its jurisdiction); City of Doraville v. Turner Communications, Corp., 236 Ga. 385 (1976)(finding that under its police power authority, a municipality can regulate the location and maintenance of outdoor advertising signs within their territorial jurisdiction); Spratlin Outdoor Media, Inc. v. City of Douglasville, 2006 WL 826077 (N.D.Ga. 2006)(upholding sign ordinance where the ordinance's height and setback restrictions were rationally related to its stated goals of promoting the health, safety, morality and general welfare of the community, promoting the orderly and beneficial development of the city, promoting adequate access to natural light and air, improving the aesthetic appearance of the city, and encouraging the most appropriate use of land and buildings in accordance with the city's comprehensive plan).
Such cases, which were considered by the Commissioner prior to adoption of this provision, are part of the official record of the adoption of this Ordinance.
(Ord. of 7-21-2021(4))
ARTICLE XII. TELECOMMUNICATIONS TOWERS AND ANTENNAS
Sec. 12.1. Purposes.
The purpose of this Article is to provide zoning classification requirements for the siting of all wireless, cellular, television and radio telecommunications towers and antennas; to encourage the location of towers in non-residential areas; to minimize the total number of towers within the community necessary to provide adequate personal wireless services to CDA:135 Supp. No. 14
residents of Bartow County; to encourage the joint use of new and existing tower sites among service providers; to locate telecommunications towers and antennas in areas where adverse impacts on the community are minimized; to encourage the design and construction of towers and antennas to minimize adverse visual impacts; and to enhance the ability of the providers of telecommunications services to deliver such services to the community effectively and efficiently.
(Ord. of 7-21-2021(4)) Sec. 12.2. Definitions.
For the purpose of this Article, certain terms used herein shall be defined as follows. The general definitions and interpretative rules of the zoning ordinance shall also be used. To the extent those general rules or definitions conflict with these specific definitions, these definitions shall control.
Alternative tower structure: Clock towers, bell towers, church steeples, light/power poles, electric transmission towers, on premises signs, outdoor advertising signs, water storage tanks, and similar natural or man-made alternative-design mounting structures that camouflage or conceal the presence of antennas or towers.
Antenna: Any exterior apparatus designed for wireless telecommunication, radio, or television communications through the sending and/or receiving of electromagnetic waves.
Co-location: The placement of the antennas of two or more service providers upon a single tower or alternative tower structure.
Department: The Bartow County Planning, Zoning and Development Department.
FAA: The Federal Aviation Administration.
FCC: The Federal Communications Commission.
Geographic antenna placement area: The general vicinity within which the placement of an antenna is necessary to meet the engineering requirements of an applicant's cellular network or other broadcasting need.
Height: When referring to a tower or other structure, "height" means the distance measured from ground level to the highest point on the tower structure or appurtenance.
Preexisting tower and antennas: Structures as set forth in Section 12.3.4 of this Article.
Scenic views: Those geographic areas containing visually significant or unique natural features, as identified in the Bartow County Comprehensive Plan.
Tower: Any structure that is designed and constructed primarily for the purpose of supporting one or more antennas, including self-supporting lattice towers, guy towers, or monopole towers. The term includes radio and television transmission towers, microwave towers, common-carrier towers, cellular telecommunication towers, man-made trees (with accessory buildings/structures) and other similar structures.
Visual quality: The appropriate design, arrangement and location of tower structures in relation to the built or natural environment to avoid abrupt or severe differences.
(Ord. of 7-21-2021(4)) Sec. 12.3. Applicability.
12.3.1 General application. Except as otherwise provided herein, the provisions, requirements and limitations of this Article shall govern the location of all wireless telecommunication, cellular telecommunication, television, microwave or radio transmission tower or antenna installed within unincorporated Bartow County. In the event of any conflict between any other provision of the Zoning Ordinance and this Article, this Article shall control.
12.3.2 Governmental exemption. Except as otherwise specifically provided for in this Article, the provisions of this Article shall not apply to Bartow County's properties, facilities or structures. Private facilities and structures placed upon County property shall be governed by a lease agreement between the County and the provider.
12.3.3 Amateur radio; receive-only antennas. This Article shall not govern any tower, or the installation of any antenna, that is 75 feet or less in height and is owned and operated by a federally-licensed amateur radio station operator from the operator's residence, or is used exclusively as a receive-only antenna; provided, however, only one such tower or antenna per residence shall be excluded from this Article.
12.3.4 Pre-existing towers and antennas. Towers and antennas permitted and erected as of September 7, 2001 shall be deemed pre-existing, and shall not be subject to the requirements of this Article. The placement of additional antennas on any nonconforming structure shall not create a vested right for the continued use of the structures should the nonconforming use cease. If an additional antenna is co-located on a preexisting tower after September 7, 2001, the requirement of this Ordinance shall be met.
(Ord. of 7-21-2021(4)) Sec. 12.4. General provisions.
12.4.1 Conditional use required. A conditional use permit shall be required for the placement of any tower or alternative tower structure, except as otherwise permitted herein.
Procedures for conditional use permits sought under this Article are contained in Section 12.5.
12.4.2 Principal or accessory use. A tower and/or antenna is considered a principal use if located on any lot or parcel of land as the sole or primary structure, and is considered an accessory use if located on a lot or parcel shared with a different existing primary use or existing structures. An existing use or structure on the same lot or parcel shall not preclude the installation of an antenna or tower. For purposes of determining whether the installation of a tower or antenna complies with zoning district requirements, including but not limited to set-back, buffer and other requirements, the dimensions of the entire lot or parcel shall control, even though the antenna or tower may be located on a leased area within such lot or CDA:137 Supp. No. 14
parcel. Towers that are constructed, and antennas that are installed, in accordance with the provisions of this Article shall not be deemed to constitute the expansion of a nonconforming use of structure.
12.4.3 Co-location of antennas required. Applicants for the erection of a tower or antenna, except amateur radio operators, shall be required to co-locate upon an existing tower structure, if possible. An exception to co-location shall only be made if the applicant submits a report from an engineer demonstrating that an existing tower suitable for co-location does not exist in the geographic antenna placement area, and that no suitable alternative tower structure is available, or if the applicant submits an affidavit from an employee that while a suitable tower may exist, no space is available thereon. Co-location is permissible provided the new antenna will add no more than ten (10) feet to the height of the tower and related equipment or appurtenances. Increasing the antenna height more than 10 feet requires a conditional use permit. Co-location requires only a building permit, and the information described in Sec. 12.7.2.
12.4.4 Variances. The County may grant variances from the strict enforcement of this ordinance where it finds that a substantial justification exists, where the goals of this ordinance can be met without strict compliance with the terms of this ordinance, and where such variance will not unduly prejudice any other property.
12.4.5 Time limits. Except where delay is caused by the applicant, the County shall make a final decision on applications for a conditional use permit for a new tower within 150 days of the filing of a complete application; the County shall make a final decision on co-location requests within 90 days of the filing of a complete application.
(Ord. of 7-21-2021(4)) Sec. 12.5 Conditional use permit required.
12.5.1 General.
(A) A Conditional Use Permit shall be required for the construction of a tower in any zoning district. All such uses shall comply with requirements set forth in this Article and all other applicable codes and ordinances, unless the applicant can show that the denial of a permit in such a location will cause a significantly harmful and permanent degradation of service which cannot be overcome by any other means including planned or potential locations which would provide the same or similar coverage or capacity.
(B) In granting a Conditional Use Permit, the County may impose conditions to the extent that it concludes such conditions are necessary to minimize adverse effects from the proposed tower on adjoining or nearby properties as set out in Section 12.5.6.
12.5.2 Application; contents; fee. All applications for Conditional Use Permits shall be submitted to the Bartow County Planning, Zoning and Development Department. Each application shall contain as a part thereof detailed plans and specifications as set forth in Section 12.7. An application for a Conditional Use Permit shall not be accepted for processing without the information required in Section 12.7. An application fee shall be charged by the Department in the amount stated in Section 12.8.
12.5.3 Independent expert review. The County may engage a licensed professional engineer as an independent expert to review any of the materials submitted by an applicant for a Conditional Use Permit and render an opinion regarding any concerns about the proposal, including but not limited to, structural integrity and the feasibility of alternative sites or co-location. Following the review of an independent expert, the County shall convey its concerns to the applicant in writing and shall allow the applicant a reasonable opportunity to address those concerns. If the applicant is unable to satisfactorily address those concerns, the applicant shall be allowed a reasonable amount of time, not to exceed thirty (30) days, following the receipt of the letter, in which to modify the application to alleviate the County's concerns or withdraw the application altogether. The expert's opinion shall be considered determinative, unless the applicant agrees to pay the expenses of submitting both opinions for a peer review, which review shall then be considered final. If the independent third-party expert supports the applicant's expert, then the Department shall pay the expenses of said third-party expert. If the independent third-party expert supports the position of the Department, then the applicant shall pay the expenses of said third-party expert.
12.5.4 Public hearing. Before taking action upon the proposed Conditional Use Permit, the County shall hold a public hearing on the matter. At least 15 days prior to the date of the public hearing, the County shall cause the following notice requirements to be instituted by the Department:
(A) A sign shall be erected, in a conspicuous location, on or adjacent to the property under consideration. The sign shall state the time, place, location, and purpose of the public hearing.
(B) A letter shall be sent by first class mail, with proof of mailing obtained from the post office, to all property owners of record of abutting parcels, and to all property owners of residentially-used parcels lying in whole or in part within a distance of two (2) times the height of the proposed tower as measured from its base, giving notice of the public hearing. The letter shall state the same information as required for the sign.
Proof of mailing means either a "Certification of Mailing" or a "Certified Mail" receipt; a "Return Receipt" showing delivery is not required. Only owners reflected on the records of the tax assessors as of the date of the application shall be entitled to notice. The letter shall be mailed at least fifteen (15) days before the hearing.
Proof of mailing shall be filed with the Zoning Administrator prior to any hearing.
(C) A public notice shall be published in the newspaper in which the sheriff's advertisements appear once a week for two (2) consecutive weeks prior to the date of the hearing.
(D) Subsections (B) and (C) above shall be the responsibility of, and at the expense of, the applicant. Failing to comply with the requirements shall render the application CDA:139 Supp. No. 14
out-of-order, and it shall be tabled for one month. If the application is still out-of-order at the next meeting, it shall be considered withdrawn, and the applicant shall have to wait six (6) months to reapply.
12.5.5 Considerations in approval or denial of conditional use permits. Any denial of a request to place, construct or modify a telecommunications facility shall be in writing and supported by substantial evidence contained in a written record. The following factors may be taken into consideration in acting upon a Conditional Use Permit application under the provisions of this Article:
(A) The height and setbacks of the proposed tower or antenna(s);
(B) The proximity of the tower or antenna(s) to residential structures and residential district boundaries;
(C) The nature of uses on adjacent and nearby properties;
(D) The surrounding topography;
(E) The surrounding tree coverage and foliage;
(F) The design of the tower or antenna(s), with particular reference to design characteristics that have the effect of reducing or eliminating visual obtrusiveness;
(G) The proposed ingress and egress;
(H) The availability of suitable existing towers or other structures for antenna colocation;
(I) The impact of the proposed tower or antenna(s) upon scenic views and visual quality of the surrounding area;
(J) The needs of the applicant as balanced against the detrimental effects on surrounding properties; and
(K) The impact of the proposed tower or antenna(s) on adjacent and nearby properties.
12.5.6 Requirements for Issuance of Conditional Use Permit. The Conditional Use Permit may be issued by the County only upon satisfaction of the following requirements:
(A) A proper application filed in accordance with the requirements of Section 12.7;
(B) The application is otherwise in compliance with or otherwise is satisfactory in considering the standards contained in Section 12.5.5;
(C) The applicant complies with the conditions proposed by the County for the purpose of reducing the harmful effects of the use on surrounding uses and ensuring compatibility with surrounding uses;
(D) The County determines that the benefits and need for the proposed conditional use are greater than any possible depreciating effects or damages to neighboring or nearby properties; and
(E) All fees, including expert fees, have been paid in full.
12.5.7 Resubmittal of conditional use application. An application for a Conditional Use Permit which has been denied shall not be resubmitted for a period of twelve (12) months and then only if the applicant can document a substantial change in need for a tower or antenna at the same location.
(Ord. of 7-21-2021(4)) Sec. 12.6. General requirements for towers.
12.6.1 Setbacks and separation. The following setbacks and separation requirements shall apply to all towers.
(A) Towers shall be setback a distance equal to the height of the tower from its base to any public right-of-way or occupied structure, or property line of the lot or parcel containing the tower, except when a property owner or adjoining property owner consents in writing to waive the setback and the applicant clearly demonstrates that the tower will collapse within the parent parcel.
(B) Guy-wires and accessory buildings and facilities shall meet the minimum accessory use location and setback requirements.
(C) In zoning districts other than I-2 and M-1, towers shall not be located closer than five hundred (500) feet from any existing tower. This requirement shall not apply to amateur radio towers.
(D) Notwithstanding any other provision of this Article, no tower or antenna shall be permitted in a residential neighborhood or within the distance of the height of the tower from any residential dwelling (example would be a 300 ft tall tower that could not be closer than 300 ft from any existing residence) unless the applicant can show that the denial of a permit in such a location will cause a significantly harmful and permanent degradation of service which cannot be overcome by any other means including planned or potential locations which would provide the same or similar coverage or capacity.
(E) The requirement of Section 12.6.1(D) (above) may be waived by the adjacent property owner(s). In such cases, the applicant shall submit a notarized affidavit from the adjacent owner(s), identifying the property owned, and affirming that he or she agrees that the tower can be erected at the proposed location, which shall be specifically described, including its distance from that owner's residential dwelling.
The affidavit shall further specifically state that the affiant understands that he or she is waiving his or her rights under Section 12.6.1 of the Bartow County Zoning Ordinance.
12.6.2 Aesthetics. The guidelines set forth in this section shall govern the design and construction of all towers, and the installation of all antennas, governed by this Article and shall be approved by the Administrator.
(A) Towers and/or antennas shall either maintain a galvanized steel or concrete finish or, subject to any applicable standards of the FAA, be painted a neutral color so as to reduce visual obtrusiveness.
CDA:141 Supp. No. 16
(B) At all tower sites, the design of all buildings and related structures shall use materials, colors, textures, screening, and landscaping that will blend the tower facilities to the natural setting and building environment. Any equipment or cabinet that supports telecommunication facilities must be concealed from public view and made compatible with the architecture of the surrounding structures or placed underground. Equipment shelters or cabinets shall be screened from public view by using landscaping or materials and colors consistent with the surrounding backdrop.
The shelter or cabinet must be regularly maintained.
(C) For antennas installed on a structure other than a tower, the antenna and supporting electrical and mechanical ground equipment shall be of a neutral color so as to make the antenna and related equipment visually unobtrusive.
(D) Towers shall not be artificially lighted, unless required by the FAA or other applicable authority. If lighting is required, the County may review the available lighting alternatives and approve the design that would cause the least disturbance to the surrounding views. The lighting shall be dimmed or changed to red lights from the sunset to sunrise.
(E) No signage or other identifying markings of a commercial nature shall be permitted upon any tower or alternative tower structure within Bartow County.
(F) To the extent practical, telecommunication facilities shall not be placed in a direct line of sight with historic or scenic view corridors as designated by the governing body or by any state or federal law or agency.
(G) Access to the tower site shall be restricted so as to minimize visibility of the access.
Where possible, existing roads shall be used. Where no roads exist, access shall follow the existing contours of the land.
(H) Such other additional requirements as the Administrator shall reasonably require to minimize the visual impact of the site on the surrounding area.
12.6.3 Security Fencing/Anti-Climbing Devices. All towers and supporting equipment shall be enclosed by fencing not less than six (6) feet in height and shall also be equipped with appropriate anti-climbing devices. Fencing shall be of chain link, wood or other approved alternative.
12.6.4 Landscaping. The following requirements shall govern landscaping surrounding all towers.
(A) Where adequate vegetation is not present, tower facilities shall be landscaped with a landscaped strip of plant materials which effectively screens the view of the tower compound. Landscaped strips shall be a minimum of ten (10) feet in width and located outside the fenced perimeter of the compound.
(B) Existing mature tree growth and natural landforms on the site shall be preserved to the maximum extent possible. Where natural vegetation around the perimeter of the site would provide an adequate visual screen, an undisturbed buffer may be utilized.
The applicant shall provide a site plan showing existing significant vegetation to be removed, and vegetation to be replanted to replace that lost.
(C) Landscaping shall be maintained by the provider and shall be subject to periodic review by the Administrator to assure proper maintenance. Failure to maintain landscaping shall be deemed a violation of this Article.
(D) Amateur radio towers and antennas, or receive-only antennas shall not be subject to the provision of this section unless required by the County through the Conditional use Permit process.
12.6.5 Maintenance impacts. Equipment at a transmission facility shall be automated to the greatest extent possible to reduce traffic and congestion. Where the site abuts or has access to a collector or local street, access for maintenance vehicles shall be exclusively by means of the collector or local street, utilizing existing access to the property on which such facility is to be located, where possible.
12.6.6 Review of tower and antenna erection by the airport authority. If, upon receipt of an application for the erection of any tower or alternative tower structure governed by this Article, the Department deems that the proposed structure may interfere with or affect the use of the airways of the County by the public or interfere with or affect the operation of existing or proposed airport facilities, a copy of the application shall be submitted by the Department to the Cartersville-Bartow County Airport Authority for review and recommendation.
12.6.7 Federal requirements; removal of towers. All towers must meet or exceed current standards and regulations of the FAA, the FCC, and any other agency of the federal government with the authority to regulate towers and antennas. If such standards and regulations are changed, the permittee or the lessee of the tower and antenna governed by this Article shall bring such tower and/or antenna into compliance with such revised standards and regulations within six (6) months of the effective date of such standards and regulations unless a more or less stringent compliance schedule is mandated by the controlling federal agency. Failure to bring such tower and/or antenna into compliance with such revised standards and regulations shall be deemed to be a declaration of abandonment of the tower and constitute grounds for the removal of the tower or antenna at the owner's, permittee's, or lessee's expense. Any such removal by the County shall be in the manner provided in the Bartow County Unfit Property Ordinance then in effect.
12.6.8 Building codes; safety standards; removal of towers. To ensure the structural integrity of towers, the owner, permittee or subsequent lessee of a tower or alternative tower structure shall ensure that it is maintained in compliance with standards contained in applicable Standard Building Codes and the applicable standards for towers that are published by the Electronic Industries Association, as amended from time to time. If, upon inspection, the Department concludes that a tower fails to comply with all applicable codes and standards, or constitutes a danger to persons or property, then upon receipt of written CDA:143 Supp. No. 16
notice by the owner, permittee or lessee of the tower, said party shall have fifteen (15) days to bring the tower into compliance with such standards. Failure to bring such tower into compliance within fifteen (15) days shall be deemed a declaration of abandonment of the tower and constitute grounds for removal of the tower as provided in the Bartow County Unfit Property Ordinance. Prior to the removal of any tower, the Department may consider detailed plans submitted by the owner, permittee or subsequent lessee for repair of substandard towers, and may grant a reasonable extension of the above-referenced compliance period. Abandoned towers or towers deemed unsafe may also be removed under the Bartow County Unfit Property Ordinance procedures.
12.6.9 Change of ownership notification. Upon the transfer of ownership of an interest in any tower, alternative tower structure, or lot upon which such a structure has been erected, the tower permittee shall notify the Department of the transaction in writing within 30 days.
(Ord. of 7-21-2021(4); Ord. of 8-9-2023, § XXVIII) Sec. 12.7. Application procedures.
12.7.1 General application requirement. Application for a permit for any telecommunication facility shall be made to the Department by the person, company or organization that will own and operate the telecommunications facility. An application will not be considered until it is complete. The Administrator is authorized to develop application forms to assist in providing the required information and facilitate the application process. Except for a co-location information submittal under Section 12.7.2 of this Article, the following information shall be submitted when applying for any permit required by this Article and must be submitted for an application to be considered complete:
(A) Site plan or plans to scale specifying the location of telecommunications facilities, transmission building and/or other accessory uses, access, parking, fences, landscaped areas, and adjacent land uses. Applicants shall submit both a paper location map and a digitized location map in a format compatible with the GIS software currently utilized by the County Information Services Department.
(B) Landscaped plan to scale indicating size, spacing and type of plantings required in Section 12.6.4.
(C) A full description of the environment surrounding the proposed telecommunications facility, including any adjacent residential structures and districts, structures and sites of historic significance, streetscapes or scenic view corridors.
(D) A description of anticipated maintenance needs for the telecommunications facility, including frequency of service, personnel needs, equipment needs, and traffic or safety impacts of such maintenance.
(E) Report from a professional qualified engineer licensed in the State of Georgia, or other appropriate qualified industry expert, documenting the following:
i. Tower or antenna type, height, and design;
ii. Engineering, economic, and other pertinent factors governing selection of the proposed design;
iii. Total anticipated capacity of the telecommunications facility, including numbers and types of antennas which can be accommodated;
iv. Evidence of structural integrity of the tower or alternative tower structure;
v. Structural failure characteristics of the telecommunications facility and demonstration that site and setbacks are of adequate size to contain debris;
vi. Certification that the antenna(s) and related equipment or appurtenances comply with all current regulations of the FCC, with specific reference to FCC regulations governing non-ionizing electromagnetic radiation (NIER), and that the radio frequency levels meet the American National Standards Institute (ANSI) guidelines for public safety;
vii. Certification that the proposed height of the tower is the minimum height necessary for coverage; and
viii. A propagation study which documents the proposed location is the only location for the tower that reduces alleged gaps in coverage.
(F) Identification of the geographic service area for the subject installation, including a map showing the proposed site and the nearest or associated telecommunications facility sites within the network. Describe the distance between the telecommunications facility sites. Describe how this service area fits into and is necessary for the service network (i.e., whether such antenna or tower is needed for coverage or capacity.)
(G) If the proposed site is zoned C-1, C-N, I-1, R-1 through R-6, RE-1, RE-2, or O/I, applicants must describe why an alternate site zoned A-1, I-2, or M-1 was not proposed by identifying;
i. what good faith efforts and measures were taken to secure such an alternate site;
ii. why such an alternate site was not technologically, legally or economically feasible and why such efforts were unsuccessful; and
iii. how and why the proposed site is essential to meet service demands for the geographic service area.
(H) The Department will review with special care justifications that appeal only to undue expense and/or to undue difficulties in entering into a lease agreement. The Department shall carefully weigh such claims, and the evidence presented in favor of them, against a project's negative impacts at the proposed site.
(I) The applicant must provide a utilities inventory showing the locations of all water, sewage, drainage and power line easements impacting the proposed tower site.
CDA:145 Supp. No. 16
(J) The applicant must provide any other information which may be requested by the Department to fully evaluate and review the application and the potential impact of a proposed telecommunications facility.
12.7.2 Tower co-location information submittals. Any person or entity co-locating an antenna or antennas on a tower for which a permit has already been issued shall submit the following information only:
(A) The name of the person or entity co-locating the antenna.
(B) The name of the owner of the tower.
(C) The tower's permit number.
(D) The location of the tower.
(E) The remaining structural capacity of the tower.
(F) Certification that the antenna(s) and related equipment or appurtenances comply with all current regulations of the FCC, with specific reference to FCC regulations governing non-ionizing electromagnetic radiation (NIER), and that the radio frequency levels meet the American National Standards Institute (ANSI) guidelines for public safety.
(Ord. of 7-21-2021(4)) Sec. 12.8. Application and permit fees.
12.8.1 Conditional use permit. The fee for an application seeking a conditional use permit to erect a new tower on an alternative tower structure shall be $3,000.00.
12.8.2 Co-location. There shall be no fee for an application seeking a conditional use permit for co-location on an existing tower or alternative tower structure other than the building permit fee.
12.8.3 Building permit fees. In addition to the application fees set forth herein, the applicable construction and utility inspection permit fees in effect at the time of the application for the permit shall apply.
(Ord. of 7-21-2021(4))
ARTICLE XIII. ENFORCEMENT
Sec. 13.1. Zoning enforcement officer; appeals.
The provisions of this Ordinance shall be administered and enforced by the Zoning Administrator. Requests for an administrative variance from the requirements of this Ordinance shall be heard and decided by the Zoning Administrator in accordance with the guidelines set forth in Section 14.1. Decisions of the Zoning Administrator may be appealed in accordance with the provisions of Article XIV. Requests for a variance other than an administrative variance shall be heard and decided by the Board of Appeals in accordance with the guidelines set forth in Section 14.4.
(Ord. of 7-21-2021(4)) Sec. 13.2. Enforcement actions.
13.2.1 Enforcement options. Enforcement of this ordinance may be through criminal prosecution, civil fines, or other civil proceedings. Any person, firm, partnership, corporation or other legal entity who shall do anything prohibited by this Ordinance as the same exists or as it may hereafter be amended or which shall fail to do anything required by this Ordinance as the same exists or as it may hereafter be amended shall be subject to an enforcement action. The County shall also be authorized to bring actions in rem against the property itself.
(A) Representatives of the County shall have the power to conduct such investigations as may reasonably be deemed necessary to assure or compel compliance with the requirements and provisions of this Ordinance, and for this purpose to enter at reasonable times upon any property for the purpose of investigation and inspection, as permitted by law. Officers and officials may seek inspection warrants or search warrants on probable cause of a violation occurring inside a structure. No warrant shall be required to investigate visible and open violations or uses.
(B) No person shall obstruct, hamper or interfere with any County representative while in the process of carrying out his official duties in the enforcement of this Ordinance.
13.2.2 Persons who may be cited. Owners are ultimately responsible for the condition of their property and ensuring that their property and all activity occurring on such property are in compliance with this Ordinance. For any violation, both the owner of the property and/or the individual agent, tenant or invitee of the owner responsible for the violation may be cited, where appropriate. Agents of the owner would include, but not be limited to, developers, builders, contractors, and sub-contractors. Tenants and invitees would include, but not be limited to, any renter, leaseholder, owner of any vehicle or structure on the property, or other person conducting an activity on the property who is not a trespasser.
Corporations and companies responsible for the work may be cited in lieu of or in addition to citations issued to the actual individuals on-site committing violations. In addition, the County shall also be authorized to bring actions in rem against the property itself.
13.2.3 Daily violations. Each day during which the violation or failure or refusal to comply continues shall constitute a separate violation, subjecting the offender to a new citation, or other civil or criminal proceeding.
13.2.4 Multiple violations. Each separate action, omission, or occurrence relating to any specific provision of this Ordinance shall be a separate violation, subjecting the offender to a separate citation. Multiple junk cars count as one violation, but the fee increases as shown in Section 13.3 below.
CDA:147 Supp. No. 16
13.2.5 Criminal prosecution. The Zoning Administrator, or designated code enforcement personnel, or other authorized personnel, may issue criminal citations for violations of this ordinance, or violation of any stop-work order.
(A) Criminal prosecutions for violation of this Ordinance shall be commenced by the completion, signing, and service of a citation by an authorized county official or zoning enforcement officer. No warning need be issued prior to a citation being issued. The original of the citation shall be personally served upon the accused, his or her authorized representative or, if a corporation, an officer of the corporation or its on-site representative or the person or persons in charge of the activity on the property; a copy shall be promptly filed with the magistrate court. A stop-work order may be issued in conjunction with a citation.
(B) Each citation shall state the time and place at which the accused is to appear for trial in magistrate court, shall identify the offense with which the accused is charged, shall have an identifying number by which it shall be filed with the Court, shall indicate the identity of the accused and the date of service, and shall be signed by the deputy sheriff or other authorized officer who completes and serves it.
(C) Any Defendant who fails to appear for trial shall thereafter be arrested on the warrant of the Magistrate and required to post a bond for his or her future appearance.
(D) The District Attorney, County Attorney, or another attorney designated by Bartow County may act as prosecuting attorney for violations of this Ordinance.
(E) Fines shall be assessed in accordance with Sec. 13.3.
13.2.6 Civil fines and proceedings. In addition to or in lieu of any other remedy, the County may seek injunctive, mandamus or other appropriate relief in superior court to enjoin or prevent a violation of any provision of this Ordinance. Such action may also seek civil fines at the mandatory rates specified in Section 13.3 for violation of this Ordinance, and may additionally seek the costs of restitution, and any other costs associated with the action to enjoin or prevent any violation of any provision of this Ordinance. The County shall be entitled to its reasonable attorney's fees and costs for bringing an action in superior court wherein any relief is granted or fine assessed.
13.2.7 Stop work orders. Upon notice from the Zoning Administrator, designated code enforcement officers, or other authorized personnel, work on any project that is being done contrary to the provisions of this Ordinance shall be immediately stopped.
(A) Stop work orders shall affect all work being done on a project or development (including work done on other lots in the subdivision owned by the same violator).
Stop work orders stop not only the work in violation, but all other work by contractors or sub-contractors on the same property. Only work to remedy the deficiency shall be allowed until the stop work order is lifted.
(B) A stop work order shall be in writing and shall be given to the owner of the property, his authorized agent or the person or persons in charge of the activity on the property, and shall state the conditions under which work may be resumed. Where an emergency or other exigent circumstances exist, no written notice shall be required, and a verbal stop work order may be issued, with a written order to be provided within three working days.
(C) Stop work orders may be issued on their own, or in conjunction with criminal citations, or civil proceedings in superior court.
(D) Issuance of a stop work order may be appealed to the Board of Appeals.
13.2.8 Additional criminal penalties. Persons cited criminally are also subject to the other penalties within the jurisdiction of the magistrate court, including incarceration up to 60 days, community service, and probation.
(Ord. of 7-21-2021(4)) Sec. 13.3. Fines.
13.3.1 Fine Schedule. Fines assessed under this Ordinance shall be assessed according to the following mandatory schedule, whether assessed as a civil fine in superior court, or assessed as a criminal penalty upon conviction in magistrate court. The maximum permissible fine shall be $1,000 per offense. In no event shall a fine be reduced below the mandatory minimum, as set forth below. Fines may be increased by mandatory add-ons under State law. As a deterrent to violation, second and subsequent violations by the same offender of any provision of this Ordinance, whether violations of the same or different provisions of this Ordinance as the initial violation, and whether involving the same or different property, shall increase the fine owing. However, repeated citations for the same violation on a second and subsequent days shall not count as a subsequent violation, but shall rather be assessed at the same rate as the initial violation. Note: "Per vehicle" additions relate to violations such as junk vehicles, parking violations, and similar violations, where each vehicle is in violation of the Ordinance.
(A) First Violation: For the first violation of any provision of this Ordinance by any violator (whether an individual or corporation), the fine shall be as follows, unless otherwise noted:
Violation of Article VI: $350 (plus $75 per vehicle, if applicable) Violation of any other Article: $300
(B) Second Violation: For the second violation of any provision of this Ordinance (whether the same or different as the first violation) by the same violator (whether an individual or corporation), the fine shall be as follows, unless otherwise noted:
Violation of Article VI: $750 (plus $100 per vehicle, if applicable) Violation of any other Article: $500
CDA:149 Supp. No. 16
(C) Third and Subsequent Violations: For the third and subsequent violation of any provision of this Ordinance (whether the same or different as the prior two violations) by the same violator (whether an individual or corporation), the fine shall be as follows, unless otherwise noted.
Violation of Article VI: $1,000 (plus $150 per vehicle, if applicable) Violation of any other Article: $800
(Ord. of 7-21-2021(4); Ord. of 8-9-2023, § XXIX) Sec. 13.4. Records.
The Zoning Department shall keep records of violators, whether corporate or individual, in order to determine when second or subsequent violations occur.
(Ord. of 7-21-2021(4))
ARTICLE XIV. VARIANCES; BOARD OF APPEALS
Sec. 14.1. Administrative adjustment.
If in the judgment of the Zoning Administrator, the application of any particular numeric criteria, standard or requirement of this Ordinance causes undue hardship on the applicant, the Zoning Administrator shall be empowered to grant an administrative adjustment to adjust said requirement by up to twenty (20) percent, if in doing so, the purposes of the ordinance are not impaired, and there is not a negative impact on the surrounding uses, properties, or neighbors. In granting an administrative adjustment, the Zoning Administrator may attach such conditions as the Zoning Administrator may deem advisable so that the purpose of this Ordinance will be served, public safety and welfare secured and substantial justice done. The Zoning Administrator shall not be authorized to grant a use in a district in which the use is prohibited. An administrative adjustment shall be granted or denied in writing. Notice of the grant of an administrative adjustment shall be sent to all adjoining property owners via first class mail by the applicant. The notice shall describe the adjustment granted and state that interested parties have 15 days in which to file an appeal of the decision. Only owners reflected on the records of the tax assessors as of the date of the application shall be entitled to notice. Proof of mailing, as described in Sec. 14.5.3, shall be submitted to the Zoning Department within 10 days of grant of the adjustment. The 15 days shall be counted from the date of mailing of the notice. The purpose of the administrative adjustment is to address particular hardship situations of individual lots and parcels. The purpose is not to grant a wholesale adjustment for an entire subdivision. For any residential subdivision or development, no more than ten percent (10%) of the units can receive the same administrative adjustment. Any greater request must seek a variance under Sec. 14.4.
For example, for a 150 lot R-8 subdivision, the front yard setback of no more than 15 lots can be reduced below 20 feet by administrative adjustment. Similarly in non-residential development, the administrative adjustment should be applied only when necessary for a hardship situation such as topography concerns.
(Ord. of 7-21-2021(4); Ord. of 8-9-2023, § XXX) Sec. 14.2. Establishment of board of appeals.
14.2.1 The Board of Zoning Appeals, also referred to as the Board of Appeals, was established by previous version of this Ordinance, and remains authorized under this Ordinance. Existing Board members shall continue in their current terms unaffected by the adoption of this Ordinance. The Board consists of five (5) members and two (2) alternate members appointed by the County Commissioner for staggered terms of three (3) years.
Each successive appointment shall be for three (3) years.
14.2.2 Members shall be paid per meeting at a rate established by the Commissioner and may be reimbursed for any expenses incurred while representing the board. Any vacancy in the membership of the board of appeals shall be filled for the unexpired term in the same manner as the initial appointment. Members shall be removable for cause by the county commissioner upon written charges and after public hearing. The board of appeals previously appointed under the authority of the prior zoning ordinance shall continue without change as if appointed under this ordinance.
14.2.3 Alternate members can only vote when there is a lack of a quorum from other members.
(Ord. of 7-21-2021(4)) Sec. 14.3. Proceedings of the board of appeals.
14.3.1 The Board of Appeals shall elect a chair-person and a vice chair-person from its members who shall serve for three years or until re-elected or until their successors are elected. The Board shall appoint a secretary, who may be a county officer, an employee of the county, or a member of the Board. The Board shall adopt such rules and bylaws as they deem appropriate. The Board shall meet every other month or on such schedule as it chooses to adopt, but no less than four times per year, providing there are matters to consider. If there are no agenda items, the regularly scheduled meeting shall be cancelled.
14.3.2 Meetings of the Board shall be held at the call of the chair-person and at such other times as the Board may determine. The chair-person, or in his absence, the vice chair-person, may administer oaths to witnesses.
14.3.3 The Board shall keep minutes of its proceedings, showing the vote of each member upon each question, or if absent or failing to vote, indicating such fact, and shall keep records of its examinations and other official actions, all of which shall be immediately filed in the office of the Board and may be a public record.
14.3.4 All meetings of the Board of Appeals shall be open to the public.
(Ord. of 7-21-2021(4)) Sec. 14.4. Powers and duties of the board of appeals.
The Board of Appeals shall have the following powers and duties:
14.4.1 Appeals. To hear and decide appeals where it is alleged there is error in any order, requirement, decision, or determination made by the Zoning Administrator in the enforceAPPENDIX A—ZONING § 14.4 CDA:151 Supp. No. 16
ment of this Ordinance. Appeals to the Board of Appeals may be taken by any person aggrieved or by any officer, department, board, or bureau of Bartow County affected by any decision of the Zoning Administrator. Such appeal shall be taken within thirty (30) days of said decision by filing with the Zoning Administrator a written notice of appeal specifying the grounds thereof. Decisions on appeals shall be issued in writing within ten days of the appeal.
14.4.2 Variances. The Board of Appeals has the power to hear requests for variances from the provisions of this Ordinance. Variance may be granted only if the Board finds all of the following to exist:
(A) That one of the following is true, through no action or fault of the property owner or predecessor:
(i) the property is exceptionally narrow, shallow or unusually shaped, (ii) the property contains exceptional topographic conditions,
(iii) the property contains other extraordinary or exceptional conditions, or (iv) there are existing other extraordinary or exceptional circumstances; and
(B) That the strict application of the requirements of this Ordinance would result in practical difficulties to, or undue hardship upon, the owner of this property; and
(C) That the requested variance relief may be granted without substantially impairing the intent and purpose of this Ordinance.
Variance decisions shall be issued in writing within ten days of the hearing.
14.4.3 Conditions. In granting a variance, the Board of Appeals may attach such conditions regarding the location, character and other features of the proposed building, structure or use as it may deem advisable so that the purpose of this Ordinance will be served, public safety and welfare secured and substantial justice done.
14.4.4 Limitations on variances; improper variance requests. Variances cannot be given to totally remove a requirement or to exempt a property or applicant entirely from a requirement. If a variance is being sought that is, in the judgment of the Zoning Administrator, a request that would constitute a text amendment, then the application shall not be accepted. For example, a request to be exempted from the Etowah Valley Historic District requirements would not be the subject of a variance. The applicant shall instead be directed to file for a text amendment. Variances can only be given to alter a numeric value, such as a setback, height limit, area limit, and so forth. Furthermore, the Board of Appeals shall not be authorized to grant a density variance or a use variance to permit a use in a district in which the use is prohibited. A variance application shall not be accepted if the variance seeks something that cannot be varied, or to eliminate rather than modify a requirement or regulation. A variance application shall not be accepted if the variance is contradictory to the ordinance (such as reducing a requirement to zero or totally eliminating a requirement). A variance shall not be granted to increase the maximum area of signs as permitted in a zoning district, nor the maximum number of signs. A variance shall not be granted to approve a billboard nor to convert an existing sign to electronic signage. A variance shall not be granted to reduce the C-1 zoning district design standards for new construction.
14.4.5 Self-inflicted hardship. The Board shall not grant variances when the hardship was created by the property owner or his predecessor, and shall not grant hardship variances based on shape or topography for lots of record not existing prior to February 21, 1996.
Configuring a subdivision to create lots that are difficult to build is an example of a hardship created by the property owner or processor, that do not justify a variance.
14.4.6 Place of worship. In compliance with Federal law, if the variance is requested by a place of worship or church, in connection with the exercise of religion, the Board shall additionally consider whether the regulation imposes a substantial burden on the exercise of religion, whether the regulation serves a compelling governmental interest, whether the denial is the least restrictive means to serve that interest, or whether the variance can be granted without harming that interest.
14.4.7 Group homes. If the variance is related to a Group Home for Persons with a Disability, the Board shall additionally consider what reasonable accommodations in this Ordinance can be made to provide persons with a disability equal opportunities to use and enjoy dwellings, while not abrogating the purposes of this Ordinance. Any reasonable accommodation should only relate to the disability.
(Ord. of 7-21-2021(4)) Sec. 14.5. Applications, hearing and notice.
14.5.1 Applications. Applications for appeals or variances must be filed in accordance with the schedule set out by the Zoning Administrator. The contents of the application shall be determined by the Zoning Administrator. The Zoning Administrator shall forthwith transmit to the Board all documents constituting the record upon which the action appealed from was taken. Variances may be sought by filing an application on forms provided by the Zoning Administrator. Written notice of the date, time and location of the Board's hearing shall be mailed to the owner of the property that is the subject of the application at least 30 days prior to the hearing.
14.5.2 Published notice. Due notice of the public hearings pursuant to this Article shall be published in the newspaper of general circulation within the county. Notice advertising the hearing on the appeal or variance and indicating date, time, place and purpose of the public hearing shall be published at least thirty (30) days but not more than forty-five (45) days prior to the date of the hearing. The cost of the advertisement shall be borne by the applicant. The Zoning Administrator shall post, at least thirty (30) days prior to the Board of Appeals' public hearing, in a conspicuous place in the public right-of-way fronting the property or on the property for which an application has been submitted, a sign or signs containing information as to the application number, date, time and place of the public hearing.
CDA:153 Supp. No. 16
14.5.3 Letters to adjacent property owners. The applicant for said appeal or variance shall also give notice of the appeal or variance and the public hearing thereon to all property owners adjoining the property for which said appeal or variance is made or sought. Said notice shall be given to each adjoining property owner by first class mail, with proof of mailing obtained from the Post Office. Proof of mailing means either a First Class "Certificate of Mailing" or a First Class "Certified Mail" receipt; a proof of delivery is not required. Only owners reflected on the records of the tax assessors as of the date of the application shall be entitled to notice. In determining the adjoining property owners, road, street or railroad rights-of-way shall be disregarded. Proof of mailing for each recipient shall be provided to the Zoning Administrator before the public hearing. Said notice must be mailed at least fifteen (15) days prior to the date of said scheduled public hearing.
14.5.4 Information in notice. The notice required herein to be published and to be served upon adjacent property owners shall contain the following information: (A) name and address of the applicant; (B) address and location of the property for which the appeal or variance is sought; (C) current zoning of the property for which the appeal or variance is sought; (D) the variance requested or the subject matter of the appeal and the reason for the requested variance or the appeal; and (E) the date, time and place of the public hearing on said requested appeal or variance.
14.5.5 Recording hearing. The Applicant may arrange for and provide a certified court reporter to transcribe the hearing before the Board of Appeals, at the expense of the Applicant. Upon appeal of the decision of the Board of Appeals, said transcript shall be made part of the record for review. Board hearings shall also be recorded by video or audio tape.
(Ord. of 7-21-2021(4); Ord. of 8-10-2022(2), § I) Sec. 14.6. Stay of proceedings.
An appeal stays all legal proceedings in furtherance of the action appealed from, unless the Zoning Administrator certifies to the Board of Appeals after the Notice of Appeal shall have been filed with him, that by reason of facts stated in the Certificate, a stay would in his opinion cause imminent peril to life and property. In such case, proceedings shall not be stayed otherwise than by a stay granted by the Board of Appeals or by a restraining order issued by a court of record on application, on notice to the Zoning Administrator, and for due cause shown.
(Ord. of 7-21-2021(4)) Sec. 14.7. Action by the board of appeals.
14.7.1 In exercising its powers, the Board of Appeals may, in conformity with the provisions of this Ordinance, reverse or affirm, wholly or partly, or may modify the order, requirements, decision, or determination, and to that end shall have all the powers of the Zoning Administrator.
14.7.2 The concurring vote of a majority of the members present of the Board shall be necessary to reverse any order, requirement, decision or determination of the Zoning Administrator, or to decide in favor of the applicant on any matter upon which it is required to pass under this Ordinance or to affect any variation of this Ordinance.
14.7.3 On all appeals, applications and other matters brought before the Board of Appeals, said Board shall inform, in writing, all the parties involved of its decisions and the reasons therefore. Such written decision shall be prepared by the zoning staff or county attorney and signed by the secretary.
(Ord. of 7-21-2021(4)) Sec. 14.8. Conduct of the board of appeals' hearing.
14.8.1 Sign up. All persons who wish to address the Board of Appeals at a hearing concerning an appeal or variance under consideration by the Board of Appeals shall first sign up on a form to be provided by the County prior to the commencement of the hearing. At least one person representing the application must be present at the hearing in order to explain the request and/or respond to questions regarding the application. if no one is present, the Board of Appeals shall be empowered to table or deny the application.
14.8.2 Matter presented; out of order applications. The Secretary of the Board of Appeals will read the proposed appeal or variance under consideration in the order determined by the Zoning Administrator. The Zoning Administrator, or his designee, shall then present the basis of the appeal or variance, along with the pertinent departmental reviews, if any, prior to receiving public input on the proposed appeal or variance. Any appeal or variance that has not complied with all notice and other requirements of this Ordinance shall be deemed out of order and shall not be considered at that hearing. It shall be postponed until the next meeting, and if it is still out of order at the next meeting, the application shall be deemed denied.
14.8.3 Speakers. The Secretary of the Board of Appeals shall call each person who has signed up to speak on the appeal or variance then before the Board of Appeals in the order in which the persons have signed up to speak, except the applicant who will always speak first. Prior to speaking, the speaker will identify himself or herself and state his/her current address. Only those persons who signed up to speak prior to the commencement of the hearing shall be entitled to speak, unless a majority of the members of the Board of Appeals present at the hearing allow the person to speak to the appeal or variance, notwithstanding the failure of the person to sign up prior to the hearing.
14.8.4 Time limits. The applicant or appellant and those in favor of the variance or appeal shall have fifteen (15) minutes to speak, total. Those opposed to the application or appeal shall have fifteen (15) minutes to speak, total. The Board may extend these times upon majority vote. Each individual speaker shall have no more than three minutes to speak, except the applicant, who can take as much of the fifteen minutes as is desired. The CDA:155 Supp. No. 16
applicant may reserve time for rebuttal. Upon vote of a majority of the Board, either side may be granted additional time in any amount the Board desires, but in such event, the other side shall be granted the same additional time.
14.8.5 Evidence, cross-examination. Each side shall have the opportunity to present evidence and witnesses which shall be entered into the record. Cross-examination of opposing witnesses shall be allowed by the Chair, but decorum shall be maintained. The Board may require the applicant and opponents to designate one person to conduct any desired cross-examination.
14.8.6 Decorum and order. Each speaker shall speak only to the merits of the proposed appeal or variance under consideration and shall address his/her remarks only to the members of the Board of Appeals. Each speaker shall refrain from personal attacks on any other speaker or the discussion of facts or opinions irrelevant to the proposed appeal under consideration. The chair may limit or refuse a speaker the right to continue, if the speaker, after first being cautioned, continues to violate this subsection. Nothing contained herein shall be construed as prohibiting the chair from conducting the hearing in an orderly and decorous manner to assure that the public hearing on the appeal or variance is conducted in a fair and orderly manner.
(Ord. of 7-21-2021(4)) Sec. 14.9. Appeals to the commissioner and to superior court.
14.9.1 Appeal to commissioner. Recourse from a decision by the Board of Appeals shall be to the Commissioner of Bartow County, by filing a written notice of appeal within thirty days of the Board of Appeal's decision. The Commissioner shall have a hearing on said appeal within 60 days of completion of preparation of the record and transcript, which shall be certified to the Commissioner by the County Attorney or other designee. The Commissioner's hearing shall be noticed according to the requirements of Section 14.5, including published notice, sign, and letters to property owner and adjacent property owners. The hearing shall be open to the public, but public comment shall not be taken. At the hearing, the Commissioner shall review the evidence presented below, which shall automatically include the Zoning Ordinance, Official Zoning Map, the County's file on the application, and any other County Ordinance relevant to the dispute. No new evidence not presented to the Board of Appeals may be presented on an appeal to the Commissioner; only argument of counsel (or unrepresented parties) is permitted. The Commissioner may issue a decision at the hearing or may issue a written decision within ten days. Appeals can be taken by the applicant, any opponent, or the County staff.
14.9.2 Appeals to superior court. Parties seeking an appeal from a final decision of the Commissioner reviewing the Board of Zoning Appeals' decision shall file an appeal with the Superior Court of Bartow County in the manner provided by law.
(Ord. of 7-21-2021(4); Ord. of 8-10-2022(2), § II)
ARTICLE XV. AMENDMENTS
Sec. 15.1. Initiation of amendments.
15.1.1 Text amendment. An application to amend the text of this Ordinance may be initiated by the Planning Commission or be submitted to the Planning Commission by the Commissioner, zoning staff, or by any person having an interest in the county.
15.1.2 Map amendment. An application to amend the Future Land Use Map or the official zoning maps may be initiated by the Planning Commission or be submitted to the Planning Commission by the Commissioner or zoning staff, property owner or agent of the owner.
Unless initiated by the Commissioner, the Planning Commission or zoning staff, all applications to amend the Future Land Use Map or official zoning maps must be submitted by an owner of the affected property or an authorized agent of an owner, following procedures set forth in Sections 15.2 and 15.3. If submitted by an agent of the owner, such authorization shall be notarized and attached to the application. If a property has multiple owners, only one owner need file the application, and it will be assumed that the other owners consent;
however, if any owner does not consent to the application (or otherwise objects), the rezoning application will not go forward. If owned by a corporation or other entity, the application must be filed by a person with proper corporate or entity authority, and the zoning administrator may require documentation to support a claim of authority. In the event there are separate owners of the surface rights and the mineral rights, both will be treated as an independent owner and be allowed to file for rezoning, regardless if the other party objects.
15.1.3 Resubmission after Denial. In the event an application for an amendment to the zoning map or Future Land Use Map has been denied, another rezoning application affecting the same property shall not be submitted nor accepted until twelve (12) months have passed from the date of the final decision by the Commissioner, or decision by a Court to uphold the County's decision, or the date an appeal was dismissed. The Commissioner may reduce said twelve-month time interval by resolution to a minimum of six (6) months.
15.1.4 Alter conditions. An application to alter conditions of rezoning may be submitted at any time after the final decision of the Commissioner. The Applicant must show a change in circumstances or additional information not available to the Applicant at the time of the original decision by the Commissioner to impose the condition. Another application to alter the same condition shall not be submitted more than once every twelve (12) months, such interval to begin on the date of the final decision by the Commissioner on said application to amend the condition.
15.1.5 Withdrawal. An application may be withdrawn without prejudice at any time prior to 6:00 p.m. on the day of the Planning Commission hearing. The Planning Commission may give permission for a withdrawal without prejudice at its hearing. Withdrawal after the Planning Commission's hearing shall mean such application may not be resubmitted for consideration for a period of six (6) months, counting from the date of withdrawal to the date of renewed application. Unless withdrawn at the hearing, the withdrawal must be in writing, signed and dated by the applicant.
CDA:157 Supp. No. 17
15.1.6 Reduced requirements for county applications. The requirements of Section 15.2 (including limitation as to number accepted) do not apply to any application for amendment initiated by the zoning department staff, the Planning Commission or the Commissioner, and such applications shall only contain such information as is required by the Zoning Administrator. County initiated map changes do not require that the County send letters to property owners or post signs on properties affected. Such notice is not required under the Zoning Procedures Law and is not practical when the County changes large numbers of parcels at one time.
15.1.7 Simultaneous applications. If multiple amendments are submitted on one parcel, they are considered in the following order: 1) text amendments; 2) Future Land Use Map amendment; 3) zoning map amendment; 4) conditional use permit; 5) zoning condition amendment. Each application shall be voted on separately, in the above-stated order. If a rezoning change is denied and the proposed conditional use is not permitted in the original zoning district, that application shall be denied.
15.1.8 Campaign contribution disclosures. Applicants and opponents to rezoning actions that change the zoning district on a parcel are requested to consult the Conflict of Interest in Zoning Act, O.C.G.A. § 36-67A-1, which requires disclosure of campaign contributions, made within two years of the rezoning application, and aggregating $250.00 or more, to any Planning Commission member or the Commissioner. Such disclosures should be filed at least five calendar days prior to the Planning Commission's hearing on forms available at the Zoning office. Violation of this Act shall not affect the validity of the rezoning, but such action may be a misdemeanor under O.C.G.A. § 36-67A-4.
(Ord. of 7-21-2021(4); Ord. of 11-13-2024(2), § III) Sec. 15.2. Applications for amendments.
15.2.1 Applications. Each application required by this Ordinance, including without limitation, to amend this Ordinance, the Future Land Use Map, or the official zoning maps shall be filed with the Zoning Administrator. The following requirements for information are mandatory, unless the requirement is deleted by the Zoning Administrator. The Zoning Administrator may require additional information to evaluate the application, the suitability of the proposed use, and other aspects of any proposed development, and any such information shall be provided. Such information is not required for County-initiated applications.
15.2.2 Maximum Number. A maximum of five (5) applications shall be accepted by the Zoning Administrator for consideration at any public hearing before the Planning Commission and/or the Commissioner. Of the maximum of five (5) total zoning applications per month, a maximum of two (2) residential development zoning applications that include 25 residential units or more (whether residential use only or mixed use) shall be accepted.
Exception: if an application is initiated by the Bartow County staff, Planning Commission, or the Commissioner, it shall not count toward the maximum of five (5) applications.
15.2.3 Procedure. Zoning numbers will be issued to applicants, in order of request, starting on the first day applications are accepted. A schedule may be obtained from the Zoning Office. All applications must be complete and submitted by the end of the business day on the date the zoning number is issued. Incomplete applications will not be accepted, except with permission of the Zoning Administrator. Furthermore, applicants not filing a complete application on the date the zoning number is issued will forfeit their assigned number, and will have to request a new number no sooner than the next available date to accept applications, once their application is complete and ready for submission.
15.2.4 Text amendment applications. Text amendment applications shall include the following minimum information, unless the requirement(s) listed below are waived by the Zoning Administrator. Additional information may also be requested by the Zoning Administrator:
(A) Name and current address of the applicant;
(B) Current provisions of the text to be affected by the amendment;
(C) Proposed wording of text change; and
(D) Reason for the amendment request.
15.2.5 Future land use map amendment. Future Land Use Map amendment applications shall include the following minimum information, unless the requirement(s) listed below are waived by the Zoning Administrator. Additional information may also be requested by the Zoning Administrator:
(A) An identification of the geographic area in the county that is to have a revised land use under the applicant's proposal;
(B) All permitted land uses for the identified area under the existing Future Land Use Map;
(C) All changes to existing land use designations that are proposed by the application;
(D) All land uses immediately adjacent to the subject property under the existing Future Land Use Map;
(E) All reasons for the amendment application;
(F) Names and addresses of the applicant owners and their agents, if any, authorized to apply for an amendment; and
(G) An initiating party shall also file any other information or supporting materials that are required by the Commissioner, Planning Commission, or Zoning Administrator.
15.2.6 Zoning map amendment. Official zoning map amendment applications shall include the following minimum information, unless the requirement(s) listed below are waived by the zoning administrator. Additional information may also be requested by the zoning administrator:
A. A tax parcel card from the county tax assessor identifying the parcel to be rezoned, or the parent parcel of the parcel to be rezoned, if a split or subdivision is occurring;
CDA:159 Supp. No. 17
B. One copy of a new survey or the existing recorded plat, drawn to scale, showing north arrow, land lot and district, the dimensions, acreage and location of the tract prepared by a land surveyor whose state registration is current and valid.
C. The present and proposed zoning district for the tract;
D. Existing and intermediate regional floodplain and structures, as shown on the Federal Emergency Management Agency FIRM rate maps for the county, if any, and the county regulatory flood maps;
E. The names and addresses of the owners of the land and their agents, if any;
F. The names and addresses of all adjoining property owners. In determining the adjoining property owners, streams and road, street or railroad rights-of-way shall be disregarded;
G. A utility availability and capacity letter from the water and sewer provider(s) must be filed with the application for rezoning. Sewer should be available immediately or estimated to be available within two (2) years of the date of the utility letter. In accordance with the Standards for Governing the Exercise of Zoning Power, the Planning Commission and Commissioner may consider whether the zoning proposal will result in a use which will or could cause an excessive or burdensome use of existing utilities.
H. Applicants submitting an application to rezone property for residential developments, whether single-family or multi-family, are required to include example renderings of residences to be built on the property.
I. A conceptual site plan depicting the proposed use of the property including:
1. A drawing of the subject district and immediate surrounding area, drawn to scale.
2. A correct scale and north arrow.
3. The proposed land use and zoning as it would appear should the zoning map amendment application be approved.
4. The present zoning classification of all adjacent parcels.
5. The proposed location of streets and entry/exit points for vehicular traffic.
6. Required yard setbacks noted on the plan.
7. The location and extent of required buffer areas, depicting extent of natural vegetation and type and location of additional vegetation if required.
8. A location map showing all arterial and collector streets of the adjacent area.
9. Location and elevation of the 100-year floodplain and the county regulatory floodplain on the property subject of the proposed zoning.
10. Acreage of property and proposed number of residential lots or dwelling units, if applicable.
J. Conceptual site plans shall be required with any rezoning application in which the application is for a residential, commercial, institutional, industrial, or mining development. A rezoning application from the A-1 to the R-1 district for a proposed lot split, for example, would not require submittal of a conceptual site plan.
K. Such other and additional information as may be requested by the zoning administrator.
15.2.7 Application schedule. Applications shall be submitted according to the schedule set by the Zoning Administrator and adopted by the Planning Commission. Application fees for an application to amend this Ordinance, the official zoning maps, or the Future Land Use Map shall be established by the Commissioner and made available by the Zoning Administrator. A fee shall not be charged for applications initiated by the zoning staff, Commissioner or Planning Commission.
15.2.8 Proposed conditions. With respect to amendments to the official zoning maps, an applicant may file site plans, renderings, construction specifications, written development restrictions and other conditions which the applicant proposes as binding conditions upon the development and use of the property involved in the application.
(Ord. of 7-21-2021(4); Ord. of 11-3-2021(3), § XII; Ord. of 12-6-2023(4), §§ IX, X) Sec. 15.3. Public notification.
15.3.1 Legal notice. Due notice of the public hearings pursuant to this Article shall be published in the newspaper of general circulation within the county. Notice advertising the application and indicating date, time, place and purpose of the public hearings shall be published at least fifteen (15) days prior to the date of the scheduled hearing of the Bartow County Commissioner but not more than forty-five (45) days prior to the date of the first scheduled hearing conducted by the Commissioner. If the application is to amend the Future Land Use Map, the notice shall include location, current land use category and proposed land use category. If the application is for amendment to the official zoning maps, then the notice shall also include the location of the property, the present zoning district of the property, and the proposed zoning district of the property. The cost of the advertisement shall be borne by the applicant. The notice shall also state, "Notice is hereby given that the Commissioner has the power to impose a different zoning classification from the classification requested, and impose or delete zoning conditions that may change the application considerably." If the notice does not run in the newspaper in conformance with these requirements, the application is void and cannot be considered as scheduled. The applicant shall coordinate with the zoning office and re-advertise for a future hearing, as assigned by the staff.
15.3.2 Signs posted. The Zoning Administrator shall post, at least fifteen (15) days prior to the Planning Commission's public hearing, in a conspicuous place in the public right-of-way fronting the property or on the property for which an application has been submitted, a sign or signs containing information as to the application and date, time and place of the public hearing.
CDA:161 Supp. No. 17
15.3.3 Letters to Property Owners. The applicant shall notify each owner of property adjacent to or adjoining the property for which the amendment (other than a text amendment) is sought by mailing to each property owner a letter by first class mail, with proof of mailing obtained from the Post Office. Proof of mailing means either a First Class "Certificate of Mailing" or a First Class "Certified Mail" receipt; a proof of delivery is not required. Only owners reflected on the records of the tax assessors as of the date of the application shall be entitled to notice. In determining the adjoining property owners, road, street or railroad rights-of-way shall be disregarded. Notice shall also be provided by letter to such other impacted property owners or interest holders as the Zoning Administrator directs. The form letter provided by the County shall be used, or a letter conveying substantially the same information. Proof of mailing for each recipient shall be provided to the Zoning Administrator before the public hearing. Said notice must be mailed at least thirty (30) days prior to the date of the Planning Commission's public hearing.
15.3.4 County Exemptions. The provisions of Sections 15.3.2 and 15.3.3 shall not apply if the application is initiated by the zoning department staff, the Planning Commission or the Commissioner.
(Ord. of 7-21-2021(4); Ord. of 11-13-2024(2), § IV) Sec. 15.4. Action by the planning commission.
15.4.1 A Planning Commission was established by previous version of this Ordinance, and remains authorized under this Ordinance. Existing Commission members shall continue in their current terms unaffected by the adoption of this Ordinance. The Planning Commission of Bartow County consists of seven (7) members appointed by the Commissioner for staggered terms of three (3) years. The Commission shall meet every other month or on such other schedule as it chooses to adopt, but in no event less than four times per year. If there are no agenda items, the regularly scheduled meeting shall be cancelled.
15.4.2 Members. Members shall be paid per meeting at a rate established by the Commissioner and may be reimbursed for actual expenses incurred while representing the commission. Appointments shall be made by resolution of the commissioner. Any vacancy in the membership of the commission shall be filled for the unexpired term in the same manner as the initial appointment. Members shall be removable for cause by the county commissioner upon written charges and after a public hearing; provided, however, that any member who fails to attend three consecutive meetings, without cause, may be removed without a public hearing. The commission may adopt such by-laws as it deems necessary to provide for the orderly conduct of its business. The commission previously appointed by the commissioner shall continue to serve without change as if appointed under this ordinance.
15.4.3 Public hearing. The Planning Commission shall hold a public hearing on each application for an amendment pursuant to this Article in accordance with a schedule adopted by the Commission. As to each application, the Planning Commission shall make a recommendation for approval, approval with conditions, or denial. A tie vote on any motion shall equate to denial. The Planning Commission may grant the applicant's request to withdraw without prejudice at its hearing.
15.4.4 Tabling or remand. The Planning Commission may table an application if new information has been submitted, or to provide the applicant time to revise an application. At the hearing in which the tabling is granted, the Planning Commission shall specify the date of the next hearing and this action shall constitute public notice of such hearing, and no additional notices shall be required prior to the hearings.
15.4.5 Report. A written report or summary of the Planning Commission's recommendation shall be prepared by the zoning staff, and shall be a public record. The Planning Commission's action may recommend amendments or conditions to the applicant's request which would reduce the land area for which the application is made, change the district requested and recommend conditions of rezoning which may be deemed advisable so that the purpose of this Ordinance will, if applicable, be served, and health, public safety and general welfare secured.
(Ord. of 7-21-2021(4)) Sec. 15.5. Conduct of the planning commission's hearing.
15.5.1 Sign up. All persons who wish to address the Planning Commission at a hearing on the proposed amendment under consideration by the Planning Commission shall first sign up on a form to be provided by the County prior to the commencement of the hearing. At least one person representing the application must be present at the hearing in order to explain the request and/or respond to questions regarding the application. if no one is present, the Planning Commission shall be empowered to table or recommend denial of the application.
15.5.2 Matter presented; out of order applications. The Secretary of the Planning Commission will read the proposed amendments under consideration in the order determined by the Zoning Administrator. The Zoning Administrator, or his designee, shall then present the amendment, along with the pertinent departmental reviews, if any, prior to receiving public input on the proposed amendment. If an application is not complete, or all requirements of this Ordinance have not been complied with, the application is out of order and may be taken off the agenda. It shall be postponed until the next meeting of the Planning Commission. If the application has already been advertised and persons wishing to speak have appeared for the hearing, the Commission may choose to hear from them, but an additional hearing shall be required. If the application is still incomplete or out of order at the next meeting, it shall be deemed withdrawn. The applicant shall have to wait six (6) months to reapply.
15.5.3 Speakers. The Secretary of the Planning Commission will then call each person who has signed up to speak on the amendment in the order in which the persons have signed up to speak, except the applicant who will always speak first. Prior to speaking, the speaker will identify himself or herself and state his or her current address. Only those persons who CDA:163 Supp. No. 17
signed up to speak prior to the commencement of the hearing shall be entitled to speak, unless a majority of the Commission, in its discretion, allows the person to speak to the amendment, notwithstanding the failure of the person to sign up prior to the hearing.
15.5.4 Time limits. Each side shall be given a maximum of 30 minutes to address the Planning Commission concerning the amendment then under consideration unless the Planning Commission, by majority vote of the members present, votes to allow additional time for a particular speaker to address the Commission on said proposed amendment. Each speaker, excluding the applicant, shall be allowed three (3) minutes to address the Planning Commission concerning the amendment then under consideration, unless the Planning Commission, by majority vote of the members present, votes to allow additional time for a particular speaker to address the Commission on said proposed amendment. Any groups which are present are encouraged to choose a spokesperson to present their views. The applicant shall have a minimum of 10 minutes for his presentation (including all related witnesses or experts). The applicant may initially use all of the time allotted to him to speak, or he may speak and reserve a portion of his allotted time for rebuttal. Opponents are not allowed rebuttal or a second opportunity to speak, unless specifically granted by majority vote of the Commission. In all circumstances, in order to comply with state law, the proponent(s) and opponent(s) of each amendment shall have no less than 10 minutes per side for presentation of data, evidence, and opinion thereon; if there is only one applicant or opponent, such person shall have the full 10 minutes if desired. In the event the opponents collectively take more than 30 minutes, the applicant's time shall be extended similarly if desired. One member of the Planning Commission or staff shall be designated as the time keeper to record the time expended by each speaker.
15.5.5 Decorum and order. Each speaker shall speak only to the merits of the proposed amendment under consideration and shall address his remarks only to the members of the Planning Commission. Each speaker shall refrain from personal attacks on any other speaker or the discussion of facts or opinions irrelevant to the proposed amendment under consideration. The chair may limit or refuse a speaker the right to continue, if the speaker, after first being cautioned, continues to violate this subsection. Nothing contained herein shall be construed as prohibiting the chair from conducting the hearing in an orderly and decorous manner to assure that the public hearing on a proposed amendment is conducted in a fair and orderly manner.
15.5.6 These procedures shall be available in writing at each hearing.
(Ord. of 7-21-2021(4)) Sec. 15.6. Action by the commissioner.
15.6.1 Public hearing. Before taking action on a proposed amendment and after receipt of the Planning Commission recommendations, the Commissioner shall hold a public hearing on the proposed amendment made pursuant to this Article, which shall be advertised as stated in Sec. 15.3 and conducted pursuant to Sec. 15.7.
15.6.2 Powers of the commissioner. At the public hearing, the Commissioner shall review the analysis submitted by the initiating party and the recommendation prepared by the Planning Commission. So that the purpose of this Ordinance will be served, health, public safety and general welfare secured, the Commissioner may approve or deny the application, reduce the land area for which the application is made, change the district or land use category requested, or add or delete conditions of the application. The Commissioner shall have the power to impose a different zoning classification from the classification requested, and impose any zoning conditions which ameliorate the impact of the zoning, or serve other lawful purposes of this Ordinance. The submission of an application for a rezoning shall be deemed notice of this power and consent to any such action. The Commissioner may also remand the application, if it has been changed or for any reason, to the Planning Commission for further review and recommendation.
15.6.3 Tabling application. The Commissioner shall have the power to table incomplete applications, or to seek more time for further information to be submitted. The action by the Commissioner to table the application shall include a statement of the date and time of the next meeting at which the application will be considered, which statement shall constitute public notice of the hearing on the application; and no further notice, such as that required by Section 15.3, is required. The application can be tabled for up to three months at a time to obtain necessary information or for other reasons of the Commissioner. The application can be tabled more than once if necessary, extending the duration the application remains on the table.
(Ord. of 7-21-2021(4)) Sec. 15.7. Conduct of the commissioner's hearing.
15.7.1 Sign up. All persons who wish to address the Commissioner at a hearing concerning a proposed zoning decision under consideration by the Commissioner shall first sign up on a form to be provided by the County prior to the commencement of the Hearing.
15.7.2 Matter presented. Proposed zoning decisions shall be called in the order determined by the Zoning Administrator. The Zoning Administrator or his designee will read the proposed zoning decision under consideration and summarize the departmental reviews pertaining thereto prior to receiving public input on said proposed zoning decision. If an application is not complete, or all requirements of this Ordinance have not been complied with, the application is out of order and will not be called at that meeting. It shall be tabled for one month. If the application is still incomplete or out of order at the next meeting, it shall be deemed withdrawn. The applicant shall have to wait six months to reapply.
15.7.3 Speakers. The Zoning Administrator or his designee shall call each person who has signed up to speak on the zoning decision in the order in which the persons have signed up to speak, except the applicant who will always speak first. Prior to speaking, the speaker will identify himself or herself and state his or her current address. Only those persons who CDA:165 Supp. No. 17
signed up to speak prior to the commencement of the hearing shall be entitled to speak, unless the Commissioner, in his discretion, allows the person to speak to the zoning decision, notwithstanding the failure of the person to sign up prior to the hearing.
15.7.4 Time limits. Each side shall be given a maximum of 30 minutes to address the Commissioner concerning the zoning decision then under consideration, unless the Commissioner allows additional time for a particular speaker to address the Commissioner on said proposed zoning decision. Each speaker, excluding the applicant, shall be allowed three (3) minutes to address the Commissioner concerning the zoning decision then under consideration, unless the Commissioner allows additional time for a particular speaker to address the Commissioner on said proposed zoning decision. Any groups which are present are encouraged to choose a spokesperson to present their views. The applicant shall have a minimum of 10 minutes for his presentation (including all related witnesses or experts). The applicant may initially use all of the time allotted to him to speak, or he may speak and reserve a portion of his allotted time for rebuttal. Opponents are not allowed rebuttal or a second opportunity to speak, unless specifically granted by the Commissioner. In all circumstances, in order to comply with state law, the proponent(s) and opponent(s) of each amendment shall have no less than 10 minutes per side for presentation of data, evidence, and opinion thereon; if there is only one applicant or opponent, such person shall have the full 10 minutes if desired. In the event the opponents collectively take more than 30 minutes, the applicant's time shall be extended similarly if desired. A member of the Commissioner's staff shall be designated as the time keeper to record the time expended by each speaker.
15.7.5 Decorum and order. Each speaker shall speak only to the merits of the proposed zoning decision under consideration and shall address his remarks only to the Commissioner. Each speaker shall refrain from personal attacks on any other speaker or the discussion of facts or opinions irrelevant to the proposed zoning decision under consideration.
The Commissioner may limit or refuse a speaker the right to continue, if the speaker, after first being cautioned, continues to violate this subsection. Nothing contained herein shall be construed as prohibiting the Commissioner from conducting the hearing in an orderly and decorous manner to assure that the public hearing on a proposed zoning decision is conducted in a fair and orderly manner.
15.7.6 These procedures shall be available in writing at all hearings.
(Ord. of 7-21-2021(4)) Sec. 15.8. Appeals to superior court.
Appeals of a decision to deny or grant a rezoning shall be taken within thirty (30) days of the decision by filing an appeal in superior court, pursuant to law.
(Ord. of 7-21-2021(4)) Sec. 15.9. Standards for governing the exercise of zoning power.
The following standards governing the exercise of the zoning power are adopted in accordance with O.C.G.A. 36-66-5(b):
(A) The existing land uses and zoning classification of nearby property;
(B) The suitability of the subject property for the zoned purposes;
(C) The extent to which the property values of the subject property are diminished by the particular zoning restrictions;
(D) The extent to which the diminution of property values of the subject property promotes the health, safety, morals or general welfare of the public;
(E) The relative gain to the public, as compared to the hardship imposed upon the individual property owner;
(F) Whether the subject property has a reasonable economic use as currently zoned;
(G) The length of time the property has been vacant as zoned considered in the context of land development in the area in the vicinity of the property;
(H) Whether the proposed zoning will be a use that is suitable in view of the use and development of adjacent and nearby property;
(I) Whether the proposed zoning will adversely affect the existing use or usability of adjacent or nearby property;
(J) Whether the zoning proposal is in conformity with the policies and intent of the land use plan;
(K) Whether the zoning proposal will result in a use which will or could cause an excessive or burdensome use of existing streets, transportation facilities, utilities, or schools; and
(L) Whether there are other existing or changing conditions affecting the use and development of the property which give supporting grounds for either approval or disapproval of the zoning proposal.
(Ord. of 7-21-2021(4)) Sec. 15.10. Conditional approval.
In adopting an Amendment to the Official Zoning Map, or approving a Conditional Use, the Commissioner may impose conditions of approval which it deems necessary in order to make the requested action acceptable and consistent with the purposes of this Zoning Ordinance and of the zoning district(s) involved, to ameliorate negative issues identified through evaluation of the standards governing consideration of a zoning change under Section 15, or to further the goals and objectives of any County adopted plans.
A. Types of conditions. Such conditions may consist of any or all of the following:
1. Dedication of required rights-of-way to the County where insufficient amounts or none exist;
2. Setback requirements from any lot line;
3. Specified or prohibited locations for buildings, parking, loading, or storage areas or other land uses;
4. Driveway curb cut restrictions;
CDA:167 Supp. No. 17
5. Restrictions as to what land uses or activities shall be permitted;
6. Maximum building heights or other dimensions;
7. Special drainage or erosion provisions;
8. Landscaping or planted area which may include the location, type and maintenance of plant materials;
9. Fences, walls, berms, or other landscaping or buffering provisions or protective measures;
10. Preservation of existing trees or planting of new trees or other vegetation;
11. Special measures to alleviate undesirable views, light, glare, noise, dust or odor;
12. Permitted hours of operation;
13. Architectural style;
14. A requirement that developers must build according to the concept plan as adopted;
15. A limitation on exterior modifications of existing buildings; or
16. Any other requirement that the Commissioner may deem appropriate and necessary as a condition of rezoning or approval of a Conditional Use.
B. Such conditions:
1. Shall only be valid if they are included in the Commissioner's Resolution;
2. Shall be in effect as long as the zoning change is in effect, or for the period of time specified in the motion for approval of the zoning change;
3. Shall be required of the property owner and all subsequent owners as a condition of their use of the property; and shall be interpreted and continuously enforced by the Zoning Administrator in the same manner as any other provision of this Zoning Ordinance.
4. Failure to meet a condition of rezoning could result in penalties including the County not issuing a building permit, business license or Land Disturbance Permit for a property, or other enforcement detailed in Section 13 of the Zoning Ordinance.
(Ord. of 11-13-2024(2), § V)
ARTICLE XVI. CONDITIONAL USE PERMITS
Sec. 16.1. Procedures.
16.1.1 An applicant for a conditional use permit shall file an application on forms provided by the Zoning Administrator. The grant or denial of a conditional use permit shall follow the procedures for a rezoning, as specified in Sections 15.3 through 15.7, unless modified by the provisions of this Article, provided that notice of the public hearing shall be provided to the owner of the property that is the subject of the application by mail at least 30 days prior to the public hearing, and the sign and published notice shall be posted at least 30 days prior to public hearing.
16.1.2 Any use which may be authorized by a Conditional Use Permit may be approved by the Bartow County Commissioner only if, in the exercise of the Commissioner's legislative discretion, he finds that:
(A) A proper application has been filed in accordance with the requirements of the Ordinance;
(B) A recommendation has been received from the Planning Commission in accordance with the provisions of Article XV;
(C) The applicant is in compliance with the particular conditions for the proposed conditional use that are required by this Ordinance;
(D) The use is consistent with the purposes and intent of this Ordinance; and
(E) After considering the application and the facts, and the Standards for making a zoning decision contained in Section 15.9 of this Ordinance, the Commissioner determines that the Standards are satisfied such that the benefits of and need for the proposed conditional use outweigh any possible harmful effects, negative impacts, or damages to the neighboring properties or the County in general.
16.1.3 In compliance with Federal law, if the conditional use is requested by a place of worship or church, in connection with the exercise of religion, the Planning Commission and Commissioner shall additionally consider whether the regulation imposes a substantial burden on the exercise of religion, whether the regulation serves a compelling governmental interest, whether the denial is the least restrictive means to serve that interest, or whether the conditional use can be granted without harming that interest.
16.1.4 If the conditional use is related to a Group Home for Persons with a Disability, the Board shall additionally consider what reasonable accommodations in this Ordinance can be made to provide persons with a disability equal opportunities to use and enjoy dwellings, while not abrogating the purposes of this Ordinance. Any reasonable accommodation should only relate to the disability.
(Ord. of 7-21-2021(4); Ord. of 8-10-2022(2), § III) Sec. 16.2. Action by the commissioner.
The Commissioner shall consider all evidence in the record in making his decision. This Ordinance is automatically a part of the record in each case, as is the entire application file.
The Commissioner shall have the power to table the application for further information to be presented, or to remand the application to the Planning Commission if new information has been presented that they have not considered. The Commissioner shall have the power to grant, deny, or grant with further specific conditions imposed.
(Ord. of 7-21-2021(4)) CDA:169 Supp. No. 18 Sec. 16.3. Conduct of the hearing.
Hearings on conditional use permits shall follow the procedures of hearings on rezoning amendments, except as modified below:
16.3.1 The applicant shall have up to 15 minutes to present his case, and submit all evidence and witnesses for the record, and opponents shall have equal opportunity to present their case. The applicant can request additional time if voluminous evidence is to be submitted, and may be granted at the discretion of the Commissioner. Equal time shall be allowed to the opponent. The County, as represented by the Zoning Administrator or his designee, or the County Attorney or his designee, shall have the right and equal time to present any witnesses and evidence into the record it chooses.
16.3.2 The applicant or his attorney shall have a right to cross-examine any witnesses in opposition to the application, and one representative or attorney of the opponents shall have a similar opportunity to cross-examine the witnesses. The County shall also have a similar opportunity to cross-examine all witnesses.
16.3.3 The Commissioner may question any witness, or request further information and table a decision for one month to await additional information or evidence. The Commissioner may also request expert reports or studies relating to the request, and shall similarly table the application in such cases. An application may only be tabled one time without the consent of the applicant.
16.3.4 The hearing shall be recorded in some fashion and that recording preserved for sixty (60) days after the decision, or during the pendency of any appeal that is filed in superior court.
(Ord. of 7-21-2021(4)) Sec. 16.4. Appeals to superior court.
Appeals of a decision to deny or grant a conditional use permit shall be taken within thirty
(30) days of the decision by filing an appeal in superior court, pursuant to law.
(Ord. of 7-21-2021(4)) Sec. 16.5. Reapplication.
An application for a conditional use which was denied shall not be resubmitted for a period of 12 months, counting from the date of denial to the date of renewed application. If an application is withdrawn after the Planning Commission's hearing, a new application may not be resubmitted for consideration for a period of six months, counting from the date of renewed application. Unless withdrawn at the hearing, the withdrawal must be in writing, signed and dated by the applicant.
(Ord. of 7-21-2021(4); Ord. of 9-3-2025, § XI)
ARTICLE XVII. LEGAL STATUS PROVISIONS
Sec. 17.1. Conflict with other regulations.
Whenever the regulations of this Ordinance require a greater width or size of yards, courts, or other open spaces, or require a lower height of buildings or smaller number of stories, or require a greater percentage of lot to be left unoccupied, or impose other more restrictive standards than are required in or under any other ordinance or statute, the regulations and requirements of this Ordinance shall govern. Whenever the provisions of any other statute or ordinance require more restrictive standards than are required by this Ordinance, the provisions of such statute or ordinance shall govern.
(Ord. of 7-21-2021(4)) Sec. 17.2. Separability/severability.
Should any section or provision of this Ordinance be declared by the courts to be unconstitutional or invalid, such declaration shall not affect the validity of the Ordinance as a whole or any part thereof other than the part so declared to be unconstitutional or invalid.
It is the intent that any provision declared unconstitutional shall be severed from the Ordinance, and the remainder of the Ordinance remain in effect.
(Ord. of 7-21-2021(4)) Sec. 17.3. Repealer.
This Ordinance replaces the prior Zoning Ordinance, adopted November 4, 2020, which in turn replaced the ordinance adopted September 16, 2020, which in turn replaced the ordinance adopted August 5, 2020, which in turn replaced the ordinance adopted July 8, 2020, which in turn replaced the ordinance adopted June 5, 2020, which in turn replaced the ordinance adopted December 4, 2019, which in turn replaced the ordinance adopted November 6, 2019, which in turn replaced the ordinance adopted September 11, 2019. In the event this Ordinance is struck down as void, unconstitutional or invalid, including therefore this provision, the prior ordinances shall be considered to not have been repealed, and shall therefore still be in effect. In the event the prior ordinance is declared void, unconstitutional or invalid, the next prior ordinance shall be considered to not have been repealed, and shall therefore still be in effect; and so on.
(Ord. of 7-21-2021(4)) Sec. 17.4. Effective date.
This Ordinance shall take effect and be in force as of the date of its adoption, the public welfare of Bartow County demanding.
(Ord. of 7-21-2021(4)) CDA:171 Supp. No. 18
APPENDIX A. ADULT ENTERTAINMENT REGULATIONS
Sec. A.1. Purpose.
It is the purpose of this appendix to regulate adult establishments in order to promote the health, safety, and general welfare of the citizens of the County, and to establish reasonable and uniform regulations to prevent the deleterious secondary effects of adult establishments within the county. The provisions of this appendix have neither the purpose nor effect of imposing a limitation or restriction on the content or reasonable access to any communicative materials, including sexually oriented materials. Similarly, it is neither the intent nor effect of this appendix to restrict or deny access by adults to sexually oriented materials protected by the First Amendment, or to deny access by the distributors and exhibitors of sexually oriented entertainment to their intended market. Neither is it the intent nor effect of this appendix to condone or legitimize the distribution of obscene material.
(Ord. of 7-21-2021(4)) Sec. A.2. Findings and rationale.
Based on evidence of the adverse secondary effects of adult uses presented in hearings and in reports made available to the commissioner, and on findings, interpretations, and narrowing constructions incorporated in the cases of City of Littleton v. Z.J. Gifts D-4, L.L.C., 541 U.S. 774 (2004); City of Los Angeles v. Alameda Books, Inc., 535 U.S. 425 (2002);
City of Erie v. Pap's A.M., 529 U.S. 277 (2000); City of Renton v. Playtime Theatres, Inc., 475 U.S. 41 (1986); Young v. American Mini Theatres, 427 U.S. 50 (1976); Barnes v. Glen Theatre, Inc., 501 U.S. 560 (1991); California v. LaRue, 409 U.S. 109 (1972); N.Y. State Liquor Authority v. Bellanca, 452 U.S. 714 (1981); Sewell v. Georgia, 435 U.S. 982 (1978); FW/PBS, Inc. v. City of Dallas, 493 U.S. 215 (1990); City of Dallas v. Stanglin, 490 U.S. 19 (1989); and Trop, Inc. v. City of Brookhaven, 296 Ga. 85 (2014); Oasis Goodtime Emporium I, Inc. v. City of Doraville, 297 Ga. 513 (2015); Flanigan's Enters., Inc. v. Fulton County, 596 F.3d 1265 (11th Cir. 2010); Peek-a-Boo Lounge v. Manatee County, 630 F.3d 1346 (11th Cir. 2011);
Daytona Grand, Inc. v. City of Daytona Beach, 490 F.3d 860 (11th Cir. 2007); Jacksonville Property Rights Ass'n, Inc. v. City of Jacksonville, 635 F.3d 1266 (11th Cir. 2011); Artistic Entertainment, Inc. v. City of Warner Robins, 331 F.3d 1196 (11th Cir. 2003); Artistic Entertainment, Inc. v. City of Warner Robins, 223 F.3d 1306 (11th Cir. 2000); Williams v.
Pryor, 240 F.3d 944 (11th Cir. 2001); Williams v. A.G. of Alabama, 378 F.3d 1232 (11th Cir.
2004); Williams v. Morgan, 478 F.3d 1316 (11th Cir. 2007); Gary v. City of Warner Robins, 311 F.3d 1334 (11th Cir. 2002); Ward v. County of Orange, 217 F.3d 1350 (11th Cir. 2002);
Boss Capital, Inc. v. City of Casselberry, 187 F3d 1251 (11th Cir. 1999); David Vincent, Inc.
v. Broward County, 200 F.3d 1325 (11th Cir. 2000); Sammy's of Mobile, Ltd. v. City of Mobile, 140 F.3d 993 (11th Cir. 1998); Lady J. Lingerie, Inc. v. City of Jacksonville, 176 F.3d 1358 (11th Cir. 1999); This That And The Other Gift and Tobacco, Inc. v. Cobb County, 285 F.3d 1319 (11th Cir. 2002); DLS, Inc. v. City of Chattanooga, 107 F.3d 403 (6th Cir. 1997); Grand Faloon Tavern, Inc. v. Wicker, 670 F.2d 943 (11th Cir. 1982); International Food & Beverage Systems v. Ft. Lauderdale, 794 F.2d 1520 (11th Cir. 1986); 5634 E. Hillsborough Ave., Inc. v.
Hillsborough County, 2007 WL 2936211 (M.D. Fla. Oct. 4, 2007), aff'd, 2008 WL 4276370 (11th Cir. Sept. 18, 2008) (per curiam); Fairfax MK, Inc. v. City of Clarkston, 274 Ga. 520 (2001); Morrison v. State, 272 Ga. 129 (2000); Goldrush II v. City of Marietta, 267 Ga. 683 (1997); Flippen Alliance for Community Empowerment, Inc. v. Brannan, 601 S.E.2d 106 (Ga.
Ct. App. 2004); Oasis Goodtime Emporium I, Inc. v. DeKalb County, 272 Ga. 887 (2000);
Chamblee Visuals, LLC v. City of Chamblee, 270 Ga. 33 (1998); World Famous Dudley's Food & Spirits, Inc. v. City of College Park, 265 Ga. 618 (1995); Airport Bookstore, Inc. v. Jackson, 242 Ga. 214 (1978); Entm't Prods., Inc. v. Shelby County, 721 F.3d 729 (6th Cir. 2013); Lund
v. City of Fall River, 714 F.3d 65 (1st Cir. 2013); Imaginary Images, Inc. v. Evans, 612 F.3d 736 (4th Cir. 2010); LLEH, Inc. v. Wichita County, 289 F.3d 358 (5th Cir. 2002); Ocello v.
Koster, 354 S.W.3d 187 (Mo. 2011); 84 Video/Newsstand, Inc. v. Sartini, 2011 WL 3904097 (6th Cir. Sept. 7, 2011); Plaza Group Properties, LLC v. Spencer County Plan Commission, 877 N.E.2d 877 (Ind. Ct. App. 2007); East Brooks Books, Inc. v. Shelby County, 588 F.3d 360 (6th Cir. 2009); Entm't Prods., Inc. v. Shelby County, 588 F.3d 372 (6th Cir. 2009);
Sensations, Inc. v. City of Grand Rapids, 526 F.3d 291 (6th Cir. 2008); World Wide Video of Washington, Inc. v. City of Spokane, 368 F.3d 1186 (9th Cir. 2004); Ben's Bar, Inc. v. Village of Somerset, 316 F.3d 702 (7th Cir. 2003); H&A Land Corp. v. City of Kennedale, 480 F.3d 336 (5th Cir. 2007); Hang On, Inc. v. City of Arlington, 65 F.3d 1248 (5th Cir. 1995); Fantasy Ranch, Inc. v. City of Arlington, 459 F.3d 546 (5th Cir. 2006); Illinois One News, Inc. v. City of Marshall, 477 F.3d 461 (7th Cir. 2007); G.M. Enterprises, Inc. v. Town of St. Joseph, 350 F.3d 631 (7th Cir. 2003); Richland Bookmart, Inc. v. Knox County, 555 F.3d 512 (6th Cir.
2009); Bigg Wolf Discount Video Movie Sales, Inc. v. Montgomery County, 256 F. Supp. 2d 385 (D. Md. 2003); Richland Bookmart, Inc. v. Nichols, 137 F.3d 435 (6th Cir. 1998); Spokane Arcade, Inc. v. City of Spokane, 75 F.3d 663 (9th Cir. 1996); DCR, Inc. v. Pierce County, 964 P.2d 380 (Wash. Ct. App. 1998); City of New York v. Hommes, 724 N.E.2d 368 (N.Y. 1999);
Taylor v. State, No. 01-01-00505-CR, 2002 WL 1722154 (Tex. App. July 25, 2002);
Fantasyland Video, Inc. v. County of San Diego, 505 F.3d 996 (9th Cir. 2007); Gammoh v.
City of La Habra, 395 F.3d 1114 (9th Cir. 2005); Starship Enters. of Atlanta, Inc. v. Coweta County, No. 3:09-CV-123, R. 41 (N.D. Ga. Feb. 28, 2011); High Five Investments, LLC v.
Floyd County, No. 4:06-CV-190, R. 128 (N.D. Ga. Mar. 14, 2008); 10950 Retail, LLC v. Fulton County, No. 1:06-CV-1923, R. 62 Order (N.D. Ga. Dec. 21, 2006); 10950 Retail, LLC v. Fulton County, No. 1:06-CV-1923, R. 84 Contempt Order (N.D. Ga. Jan. 4, 2007); Z.J. Gifts D-4, L.L.C. v. City of Littleton, Civil Action No. 99-N-1696, Memorandum Decision and Order (D.
Colo. March 31, 2001); People ex rel. Deters v. The Lion's Den, Inc., Case No. 04-CH-26, Modified Permanent Injunction Order (Ill. Fourth Judicial Circuit, Effingham County, July 13, 2005); Reliable Consultants, Inc. v. City of Kennedale, No. 4:05-CV-166-A, Findings of Fact and Conclusions of Law (N.D. Tex. May 26, 2005);
And based upon reports concerning secondary effects occurring in and around adult establishments, including, but not limited to, "Correlates of Current Transactional Sex among a Sample of Female Exotic Dancers in Baltimore, MD," Journal of Urban Health (2011); "Does the Presence of Sexually Oriented Businesses Relate to Increased Levels of Crime?" Crime & Delinquency (2012) (Louisville, KY); Metropolis, Illinois - 2011-12;
CDA:173 Supp. No. 17 Manatee County, Florida - 2007; Hillsborough County, Florida - 2006; Clarksville, Indiana - 2009; El Paso, Texas - 2008; Memphis, Tennessee - 2006; New Albany, Indiana - 2009;
Louisville, Kentucky - 2004; Fulton County, GA - 2001; Chattanooga, Tennessee - 1999-2003;
Jackson County, Missouri - 2008; Ft. Worth, Texas - 2004; Kennedale, Texas - 2005;
Greensboro, North Carolina - 2003; Dallas, Texas - 1997; Houston, Texas - 1997, 1983;
Phoenix, Arizona - 1995-98, 1979; Tucson, Arizona - 1990; Spokane, Washington - 2001; St.
Cloud, Minnesota - 1994; Austin, Texas - 1986; Indianapolis, Indiana - 1984; Garden Grove, California - 1991; Los Angeles, California - 1977; Whittier, California - 1978; Oklahoma City, Oklahoma - 1986; New York, New York Times Square - 1994; the Report of the Attorney General's Working Group On The Regulation Of Sexually Oriented Businesses, (June 6, 1989, State of Minnesota); Dallas, Texas - 2007; "Rural Hotspots: The Case of Adult Businesses," 19 Criminal Justice Policy Review 153 (2008); "Stripclubs According to Strippers: Exposing Workplace Sexual Violence," by Kelly Holsopple, Program Director, Freedom and Justice Center for Prostitution Resources, Minneapolis, Minnesota; "Sexually Oriented Businesses: An Insider's View," by David Sherman, presented to the Michigan House Committee on Ethics and Constitutional Law, Jan. 12, 2000; Sex Store Statistics and Articles; Law Enforcement and Private Investigator Affidavits (Adult Cabarets in Forest Park, GA and Sandy Springs, GA); and Strip-Club Trafficking Documents, The Commissioner finds:
(1) Adult establishments, as a category of commercial uses, are associated with a wide variety of adverse secondary effects including, but not limited to, personal and property crimes, human trafficking, prostitution, potential spread of disease, lewdness, public indecency, obscenity, illicit drug use and drug trafficking, negative impacts on surrounding properties, urban blight, litter, and sexual assault and exploitation. Alcohol consumption impairs judgment and lowers inhibitions, thereby increasing the risk of adverse secondary effects.
(2) Adult establishments should be separated from sensitive land uses to minimize the impact of their secondary effects upon such uses, and should be separated from other adult establishments, to minimize the secondary effects associated with such uses and to prevent an unnecessary concentration of adult establishments in one area.
(3) Each of the foregoing negative secondary effects constitutes a harm which the county has a substantial government interest in preventing and/or abating. This substantial government interest in preventing secondary effects, which is the county's rationale for this appendix, exists independent of any comparative analysis between adult establishments and other businesses. Additionally, the county's interest in regulating adult establishments extends to preventing future secondary effects of either current or future adult establishments that may locate in the county. The county finds that the cases and documentation relied on in this appendix are reasonably believed to be relevant to said secondary effects.
The county hereby adopts and incorporates herein its stated findings and legislative record related to the adverse secondary effects of adult establishments, including the judicial opinions and reports related to such secondary effects.
(Ord. of 7-21-2021(4)) Sec. A.3. Adult entertainment establishments.
A.3.3 Definitions.
Adult establishment: An "adult arcade," an "adult bookstore," an "adult motion picture theater," a "semi-nude lounge," or a "sex paraphernalia store" as those terms are defined in Chapter 4 (Adult Establishments) of the Bartow County Code.
Licensed child day care center: A facility licensed by the State of Georgia, whether situated within the county or not, that is a "child day care" use as set forth in Article IX, section 9.1.1 of the Zoning Ordinance.
(Ord. of 7-21-2021(4)) CDA:175 Supp. No. 17 Appendix B
DEVELOPMENT REGULATIONS
CDB:1 Supp. No. 14 Secs. 5.26, 5.27. Reserved.
APPENDIX B—DEVELOPMENT REGULATIONS
CDB:3 Supp. No. 13
ARTICLE I. IN GENERAL
Sec. 1.1. Introduction.
This document illustrates the continued commitment on behalf of the Bartow County Commissioner to encourage quality growth and development in Bartow County. All operating departments in the development plan review process work together to produce this document. This document has been created, revised and otherwise set forth as a tool for communication between the county and professional contractors, engineers, architects, developers, planners, builders, and other agents for development. To that end, these regulations are a compilation of the accepted procedures, plan requirements, and approval criteria in the area of land use and site development.
(Ord. of 4-15-2015, § I) Sec. 1.2. Title.
These regulations shall be known and may be cited as "The Development Regulations of Bartow County, Georgia," and may be referred to generally as "the development regulations" or, as used herein, "these regulations."
(Ord. of 4-15-2015, § I) Sec. 1.3. Purposes.
It is the purpose of these development regulations to promote the public health, safety and welfare of the citizens of Bartow County and visitors thereto. To these ends, these regulations are intended to achieve, and is enacted for, the following purposes:
(1) To guide and regulate developments and subdivisions in Bartow County, in order to promote the general welfare of the county and residents and users of such developments and subdivisions;
(2) To provide standards for road and street construction, and subdivision design, to create orderly traffic flow and serve the public health, safety and welfare, and to prevent congestion;
(3) To provide for the control of stormwater and other negative impacts resulting from developments, and to protect from flooding and flood hazards;
(4) To promote, in the public interest, the wise utilization of land;
(5) To provide for adequate light, air, convenience of access, and safety;
(6) To facilitate the creation of a convenient, attractive and harmonious community;
(7) To expedite the provision of adequate police and fire protection and other public services;
(8) To provide for protection of the constitutional rights and obligations of all citizens within the county;
CDB:5 Supp. No. 18
(9) To streamline the construction plan review process by providing clear lines of communication and direction to staff;
(10) Provide a system for the subdividing of lands and the accurate recording of land titles;
(11) Provide assurance that those lots shown on recorded subdivision plats are usable by the purchasers for their intended and permitted functions;
(12) Assure equitable, efficient and detailed review of all residential and non-residential construction plans by providing uniform development regulations for the development and subsequent construction of structures, buildings, or other improvements of any land within unincorporated Bartow County.
(Ord. of 4-15-2015, § I) Sec. 1.4. Authority.
These development regulations are adopted and certified by the Bartow County Commissioner under the authority of the Constitution of the State of Georgia (1983) and the Official Code of Georgia enacted pursuant to such authority.
(1) These regulations shall govern the subdivision and development of land in unincorporated Bartow County, Georgia, pursuant to Georgia law and the authority of the Bartow County Commissioner.
(2) Any development or subdivision of land must comply with any and all provisions of these regulations, the Bartow County Zoning Ordinance, and any other adopted rules and regulations of Bartow County.
(3) For the purposes of these regulations, any division of a tract or parcel of land into three or more lots, building sites, or other divisions, and any development of land involving a new street or a change in existing streets must comply with all applicable provisions contained herein.
(4) These development regulations incorporate by reference the Bartow County Development Checklist, which may be amended from time to time by the authority of the engineering department director.
(Ord. of 4-15-2015, § I; Ord. of 10-1-2025) Sec. 1.5. Interpretation and intent.
For the interpretation and application of the development regulations, all provisions shall be:
(1) Considered as minimum requirements for the promotion of public health, safety, and general welfare.
(2) Deemed neither to limit nor repeal any other powers granted under federal and state statutes.
(3) The intent of these regulations is that they apply to and provide guidance for the development of any lands within the unincorporated areas of Bartow County, or any other areas over which the Bartow County Commissioner has authority pertaining to land development.
(4) These regulations apply to all land disturbing activity and development activity, whether the development involves the subdivision of land for sale to individual users or pertains only to the construction of buildings or other improvements on a single parcel.
(5) These regulations are intended to address these important needs:
(A) Increased demand for development criteria in response to an ever-increasing environmental awareness.
(B) Improved communication and coordination among county agencies and departments.
(C) Improved efficiency and better service to the development community.
(Ord. of 4-15-2015, § I) Sec. 1.6. Conflict with other regulations.
Whenever these development regulations impose other more restrictive standards than are required in or under any other ordinance or statute, the regulations and requirements of these development regulations shall govern. Whenever the provisions of any other statute or ordinance require more restrictive standards than are required by these development regulations, the provisions of such statute or ordinance shall govern.
(Ord. of 4-15-2015, § I) Sec. 1.7. Separability.
The provisions of these regulations are separable. If a sentence, section, subsection or provision of these regulations, or the application of a provision of these regulations, be declared unconstitutional or invalid, such declaration shall not affect or impair the validity of the remaining portions of these regulations or the regulations as a whole, other than the part so declared unconstitutional or invalid.
(Ord. of 4-15-2015, § I) Sec. 1.8. These regulations not zoning.
These development regulations are not a zoning ordinance, but any proposed developer or sub-divider is advised to ensure that the proposed development or subdivision is in compliance with the requirements of the Bartow County Zoning Ordinance (Appendix A).
(Ord. of 4-15-2015, § I) CDB:7 Supp. No. 18 Sec. 1.9. Exemptions.
The following types of developments are required to submit only a final plat for approval by the development review committee:
(1) Any combination or recombination of previously platted lots where the total number of lots is not increased and the resultant lots all meet the development standards of Bartow County.
(2) Any division of land for the purposes of legacy, which is defined as a transaction between immediate family members (parents, children, grandparents, grandchildren, great grandparents, great grandchildren), as approved by the county engineer.
(3) Certain developments may be exempt from these requirements if the project area being developed is comprised of less than one acre and/or is not located within 200 feet of any state waters. The county engineer may require site plans or construction plans if it is determined that the proposed facility will have a negative site impact, or are electrical substations, telecommunication towers, water and sewer pumping stations, and/or other similar facilities.
(4) Clearly agricultural uses, limited to the cultivation of the land, dairying or animal husbandry, are not intended to be governed by these regulations, provided that land proposed to be converted to a new agricultural use must be zoned A-1 to be exempt from the provisions herein.
(5) Recognizing that not all subdivision requirements are logical or affordable for large lot subdivisions, subdivision of land in the A-1 agriculture district into large lots (meaning where all lots are ten acres or greater in size) may be granted, upon approval of the county engineer, without requiring a preliminary plat before approval of a final plat. The county engineer is authorized to determine that the following development regulations either shall not apply or may be reduced from the stated requirement for large lot residential subdivisions: road right-of-way dedication (section 5.31(10)), connection to public water (section 3.1(6)), and/or stormwater management requirements (Code chapter 34, section 34-555). In order to eliminate or reduce such regulations, the county engineer must make a determination in writing that the proposed reduction or elimination is consistent with the spirit and intent of the code, will not harm the public interest or adjacent property, and is in the best interests of the county. Any such approved modification shall be noted on the final plat to provide public record of the fact that existing regulations have been varied or reduced for the particular large lot residential development.
(Ord. of 4-15-2015, § I; Ord. of 8-5-2020(1), § I) Sec. 1.10. Amendments and revisions.
These regulations may be amended from time-to-time by resolution of the Bartow County Commissioner. Such amendments shall be effective as of their date of adoption unless otherwise stated in the adopting resolution. Any subdivision or other development project for which a valid and complete application for a development permit shall have been received prior to the adoption of an amendment to these regulations may, at the developer's option, proceed to completion and building permits may be issued as though no amendment had been approved, provided that the development permit is or can be issued within 90 calendar days of said amendment and all time frames associated with said permit are observed.
(Ord. of 4-15-2015, § I) Sec. 1.11. Existing permits.
Any project for which an active development permit application exists prior to the adoption of an amendment to these regulations may, at the developer's option, proceed to completion and building permits may be issued as though no amendment had been approved.
Variances and modifications in accordance with these regulations shall be granted as necessary and appropriate where full compliance is not feasible or cannot reasonably be achieved because of the stage of development, limitations imposed by the site, or design parameters. No amendment to these regulations shall be construed to affect the validity of any development permit or building permit lawfully issued prior to the adoption of said amendment.
(Ord. of 4-15-2015, § I) Sec. 1.12. Subdivision and development of property.
(1) Subdivision of three or more lots. These regulations shall govern all subdivision of land into three or more individual parcels or lots, within the unincorporated limits of Bartow County, Georgia, or any other areas over which the Bartow County Commissioner has authority pertaining to land development.
(2) Development. These regulations shall also govern all new residential and nonresidential development and shall include redevelopment of existing development. It shall include the construction of any commercial, industrial, multi-family or office building or structure, even if on a single lot, and shall include the construction of a manufactured home park.
(3) Pre-application review. Whenever a subdivision or development is proposed, the owner/developer will consult with the Bartow County Development Review Committee. The owner/developer will submit concept plans and data showing existing conditions within the site and its vicinity and the proposed development layout of the subdivision.
(4) Approvals. The development review committee shall approve all preliminary plats and construction plans in accordance with these regulations.
(5) Time limits on preliminary plat and construction plan approval. Preliminary plats shall be good for a period of one year after development review committee approval. Within that year construction plans must be submitted and approved. Construction of the project must begin within one year of construction plan approval. If these time limits are exceeded, the project shall be void and subject to re-application.
CDB:9 Supp. No. 18
(6) Construction of phased developments. Developers shall be responsible for damages and maintenance of previously accepted streets. When construction traffic of new phases/ developments impact severely on existing county streets, as determined by the Bartow County Engineering Department, and the developer fails to take necessary corrective action, the developer's maintenance bond may be used for these off site repairs and maintenance.
(7) Status of platted streets and other public spaces and utilities. After final approval by the development review committee and the completion of all improvements required by these regulations and the expiration of the required maintenance bond period, the owner/ developer may request the county to accept platted streets and other public spaces and utilities by preparing deeds to be reviewed by the engineering department fully describing the streets and infrastructure to be accepted by resolution of the Bartow County Commissioner.
(8) Priority of health department. Nothing contained in these regulations shall be construed as preventing the health department, after study of the conditions existing in a proposed subdivision, from requiring that all or any portion of the area of such subdivision shall not be built upon or that the minimum lot sizes set forth in these regulations are inadequate and must be increased to insure the protection of public health.
(Ord. of 4-15-2015, § I; Ord. of 10-1-2025) Sec. 1.13. Subdivision lot criteria.
(1) Jurisdictional boundary lines. Lots shall not be divided by corporate or county boundary lines.
(2) Corner lots. Corner lots for residential development shall have driveways on only one street.
(3) Double frontage. For double frontage lots (i.e., lots having street frontage both in front and rear) in residential subdivisions along major thoroughfares, a no-access easement of at least ten feet in width, across which there shall be no right of access, shall be provided along the line of lots abutting said major thoroughfare. The no-access easement shall be planted with a single line of shrubs or trees, or contain a solid or decorative fence, or contain other such screening treatment as may be proposed by the developer and approved by the development review committee. For double frontage lots in subdivisions along minor collectors or local streets, there shall also be a no-access easement as described above, except that any planting or screening of the no-access easement shall be at the sole option of the developer.
(4) Lot lines. Insofar as practical, side lot lines shall be at right angles to straight street lines and radial to curved street line.
(5) Minimum lot dimensions and area. The minimum lot width at the front building line and minimum lot area shall be in accordance with the Bartow County Zoning Ordinance.
(6) Street access. Every lot hereafter established shall front or abut on a street which is to be dedicated to the public and conforms to the requirements of these regulations, unless on an approved driveway easement or as otherwise approved by the development review committee. Generally, lots shall not derive access exclusively from any street designated as an arterial or collector street on the roadway classification map. If access must be obtained from an arterial or collector street, single family residential driveways shall be designed and arranged to avoid requiring vehicles to back into traffic. Multiple family residential driveways and drives serving all nonresidential land uses shall be designed and arranged to avoid requiring vehicles to back into traffic on all streets. A maximum of 150 residential dwelling units shall be allowed to be constructed with only one street outlet on an existing public street. If a second access to an existing public street is not available or, in the opinion of the development review committee, could induce non-residential traffic through the development, a single entrance may be allowed if designed to accommodate a traffic signal and/or sufficient right-of-way and improvements to provide a protected left-turn lane, subject to the approval of the Bartow County Engineering Department.
(Ord. of 4-15-2015, § I; Ord. of 10-1-2025) Sec. 1.14. Effective date.
These development regulations shall take effect and be in force immediately upon approval by resolution of the Bartow County Commissioner during a public hearing.
Revisions to these development regulations shall be effective immediately and apply to all development activities received for review by the Bartow County Development Review Committee on or after this date. Projects received for review prior to such revisions shall satisfy the development regulation criteria in place at the time the documents were initially submitted and/or approved. This ordinance replaces those sections herein revised in their entirety the previous Bartow County Development Regulations as amended, except to the extent the provision of those regulations remain in effect for existing construction and projects under review prior to the effective date of these regulations. The provisions of those regulations shall remain in effect and be incorporated herein for such existing construction, subdivisions, structures and developments not subject to this ordinance.
(Ord. of 4-15-2015, § I)
ARTICLE II. DEFINITIONS
Sec. 2.1. Interpretation of certain words and phrases.
Except as specifically described herein, all words shall have the customary dictionary meaning. Engineering terms of art and concepts, if not specifically defined herein, shall carry their customary meaning within the engineering profession. For the purpose of interpreting these regulations, certain words or terms used herein shall be defined as follows: Words used in the present tense include the future tense. Words used in the singular number include the plural, and words used in the plural include the singular. The word "person" includes a firm, association, organization, partnership, corporation, trust, and CDB:11 Supp. No. 18
company as well as an individual. The word "used" or "occupied" as applied to any land or building shall be construed to include the words "intended, arranged, or designated to be used or occupied. "The word "lot" includes the word "plot" or "parcel." The word "shall" is always mandatory. The word "used" or "occupied" as applied to any land or building shall be construed to include the words "intended, arranged or designed to be used or occupied."
Doubt as to the precise meaning of any word used in these regulations shall be clarified by the engineering department director or his designee.
(Ord. of 4-15-2015, § II; Ord. of 10-1-2025) Sec. 2.2. Definitions of words and phrases.
[The following words, terms and phrases, when used in this appendix, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:]
Alley or service drive: A minor, permanent way, public or private, used primarily for vehicular service access to the back or side for properties otherwise abutting a street and which affords only a secondary means of access to abutting property, and is not intended for general traffic.
AASHTO Standards: Standards set forth by the American Association of State Highway Transportation Officials.
Average daily trips (ADT): The total number of vehicle movements both entering and exiting the designated study site on an average weekday. ADT for various land uses will be determined using the most current edition of the Institute of Transportation Engineers' (ITE) Trip Generation Manual.
Applicant: A person, either the owner or the bona fide representative of the owner of land or structures governed by these regulations, who seeks authority to use, develop, construct upon or otherwise enjoy the use of property through any of these procedures established under these regulations.
Arterial: A principal arterial or minor arterial street as defined and designated in the comprehensive plan of Bartow County and in the functional roadway classification map of Bartow County.
As-built survey: See Record drawings.
Bartow County Development Checklist: A separate publication available from the engineering department director that is incorporated herein by reference, and contains additional detailed development standards and procedures.
Bartow County Site and Utility Details for Development: A separate publication available from the community development department that is incorporated herein by reference, and contains additional detailed standards relating to site and utility design.
Best management practice (BMP): A collection of structural measures and protective vegetative practices properly designed, installed and maintained in accordance with the hydraulic design specifications contained in the Manual for Erosion and Sediment Control in Georgia, latest edition, incorporated herein by reference.
Board of appeals: The board established by the Bartow County Zoning Ordinance to hear appeals of interpretations of the engineering department director and to hear applications for variances from the requirements of these regulations.
Breakaway wall: A wall that is not part of the structural support of the building and is intended through its design and construction to collapse under specific lateral loading forces without causing damage to the elevated portion of the building or the supporting foundation system.
Buffer (for erosion/sedimentation control purposes): An area along the course of any state waters to be maintained in an undisturbed and natural condition.
Buffer (general): A barrier that is created by the use of trees or other acceptable plant or vegetative material alone or in combination with berms, fencing or walls used to physically separate or screen one use or property from another so as to visually shield or block noise, lights and/or dissimilar uses.
Buildable lot of record: A lot or parcel of land that existed as a single parcel of ownership, recorded as such in its entirety and present boundaries with the clerk to superior court prior to September 31, 1993, or which is shown in its entirety and present boundaries on a final plat or exemption plat duly approved under in accordance with Zoning Ordinance, providing for the subdivision of land in Bartow County and recorded with the clerk to superior court of Bartow County.
Building: Any structure intended for shelter, housing, or enclosure of persons, animals, chattels or property, and usually having a roof supported by columns or by walls.
Building line: A line established by the Georgia Plat Act beyond which a building shall not extend, as determined by the front, side and rear yard setbacks.
Certificate of occupancy (C.O.): Final approval by the chief building official for the use or occupancy of a structure for which a building permit was issued.
Clearing: The removal of trees or other vegetation, but not including grubbing activities.
Community development department: A department of the Bartow County government comprised of the building inspections division, and the zoning division, that has responsibility for overseeing physical land development in the county.
Comprehensive plan: A plan summarizing and illustrating the adopted goals and objectives of the commissioner regarding the future location and character of anticipated land uses, transportation, and other public facilities in Bartow County. The term "comprehensive plan" includes component or functional plans for the county, including but not limited to a CDB:13 Supp. No. 18
plan for land use (i.e., Land Use Plan) or a plan for transportation facilities, and includes the classification of streets and thoroughfares as shown on the adopted long range roadway functional classification map.
Concept plan: A drawing that shows the overall concept of a proposed development, and that may include lots and streets in a subdivision or the general location of buildings and improvements for a multi-family or non-residential project, and that may be drawn to approximate dimensions. These drawings are for information purposes only and shall not be formally reviewed or approved by the county.
Construction plan: A set of plans that must be formally submitted to the development review committee for review and approval following the review of a concept plan and approval of a preliminary plat on residential subdivisions and application for a land disturbance permit. Such plans shall include, but not be limited to, grading plans, soil erosion and sediment control plans, hydrology studies, transportation plans, water plans, sanitary sewerage plans, on-site sewer plans and public safety plans.
County: Unless otherwise stated, Bartow County, or the commissioner of Bartow County, or the commissioner's designee.
County engineer: The county engineer of Bartow County, Georgia, assigned to the engineering department.
Cul-de-sac: A street having one end open to traffic and being permanently terminated within the development by a vehicular turnaround. For the purpose of designation, a cul-de-sac street shall be interpreted to begin at the intersection of two or more streets nearest to the vehicular turnaround.
Cut: A portion of land surface or area from which earth has been removed by excavation;
also, the depth below original ground surface to excavated surface.
Department: Unless otherwise stated, this term refers to the Bartow County Engineering Department.
Developer: Any person, corporation or duly authorized agent who undertakes the subdivision of land as defined herein.
Development, or to develop: Subdividing a tract of land into three or more lots whether for sale or rental, whether for commercial, industrial, office or residential purposes, or some combination thereof. It shall also include redevelopment of existing development. It shall also include the construction of any commercial, industrial, multi-family or office building or structure, even if on a single lot, and shall include the construction of a manufactured home park. In order that the purposes of these regulations shall not be evaded by piecemeal development or subdivision, subdividing a tract of land existing on September 31, 1993 into two tracts shall not be a development, but any further split of either tract shall be a development.
1. (Verb). All activities associated with the conversion of land or the expansion or replacement of an existing use to any new use intended for human operation, occupancy or habitation, other than for agricultural purposes devoted strictly to the cultivation of the land, dairying or animal husbandry. Such activities include land disturbance (clearing and grubbing the land of vegetation and stumps, and grading) and the construction of improvements such as but not limited to streets, driveways or parking areas, water or sewer mains, storm water drainage facilities, sidewalks or other structures permanently placed on or in the property.
2. (Noun). Where appropriate to the context, the term "development" also may be used to denote a specific subdivision or project that is a single entity or intended to be constructed as an interrelated whole, whether simultaneously or in phases.
Development inspector: The county inspector responsible for inspections in the field throughout the development phase of a specific development.
Development permit: A permit issued by the engineering department authorizing clearing, grubbing, grading and construction of storm drainage facilities, access drives, streets, parking or other improvements exclusive of buildings.
Development review committee: A committee comprised of department representatives from building inspections, engineering, environmental health, fire/fire marshal, GIS, roads/transportation, water/sewer and zoning. The primary function of the development review committee is to review and approve all proposed subdivisions of property, residential and non-residential site developments and other such similar projects that fall under the purview of these regulations.
Diameter breast height (DBH): The diameter of a tree measured at a point four and one-half feet above the ground.
Drainage improvements: Those facilities and structures intended to control and direct the passage of storm waters and other surface water flows from and across a property; including, but not limited to, swales and ditches, cross drains and other piping systems, catch basins, detention ponds and velocity dissipation devices.
Driveway: A vehicular access way in private ownership, other than a private street, which provides access primarily to only one property, or to no more than two single-family detached residences.
Dwelling or dwelling unit: A building or other structure designed, arranged, or used for temporary or permanent living quarters for one family, whether freestanding or a part of another building containing other residences.
Easement: A grant by a property owner of the use of land for a specific purpose or purposes by the general public, a corporation, or a certain person or persons and recorded in the superior court clerk's office.
Enclosure: A structure with four sides and a roof designed to enclose and shelter animals, persons or objects.
Environmental Health Department: See Health department.
CDB:15 Supp. No. 18 Fee simple: A form of property ownership in which the buildings and surrounding lands are owned by the same person.
Federal Emergency Management Agency (FEMA): The federal agency that administers the National Flood Insurance Program. FEMA prepares, revises and distributes the maps and studies referenced in these regulations.
Fill: A portion of land surface to which soil or other solid material has been added; the depth above the original ground.
Final plat: A finished drawing of a subdivision showing completely and accurately all legal and boundary information and certification, as specified in Article 4 of these regulations.
Finished grade: The final elevation and contour of the ground after cutting or filling and conforming to the proposed design.
Finished floor elevation: The top surface of the lowest inhabitable level of an enclosed area in a building, including the basement. This could be the top of the slab in concrete slab construction or the top of wood flooring in wood frame construction. The term does not include the floor of a garage used solely for parking vehicles.
Fire flow: The minimum volume flow rate of water established by the water and sewer department with a required minimum residual pressure.
Flood or flooding: A general or temporary condition of partial or complete inundation of normally dry land areas from either the overflow of inland or tidal waters or the unusual and rapid accumulation or runoff of surface waters from any source.
Floor: The top surface of an enclosed area in a building (including basement), i.e., top of slab in concrete slab construction or top of wood flooring in wood frame construction. The term does not include the floor of a garage used solely for parking vehicles.
Frontage: The width of a lot as measured where it abuts the street right-of-way.
Georgia D.O.T. (GDOT): The Department of Transportation of the State of Georgia.
Grading: The movement, removal or addition of earth on a site by the use of mechanical equipment.
Grading permit: An official authorization issued by the engineering department permitting grading of a site, and may include installation of attendant storm water drainage facilities. See also "Land disturbance permit."
Ground elevation: The original elevation of the ground surface prior to cutting or filling.
Grubbing: The removal of stumps or roots from a property.
Health department: The Environmental Health Services Division of the Georgia Department of Human Resources for Bartow County.
Land-disturbing activity: Any activity which may result in soil erosion from water or wind and the movement of sediments into state waters or onto lands within the state, including, but not limited to, clearing, dredging, grading, excavating, transporting, and filling of land, but not including agricultural operations and forestry.
Land disturbance permit: A permit granted under the Bartow County Soil Erosion and Sedimentation Control Ordinance that provides the authorization necessary to conduct a land-disturbing activity under the provisions of that ordinance and these regulations. Said permit may be a grading permit or development permit as defined and authorized herein.
Line, lot: The boundary line of a lot.
Line, yard: A line drawn parallel to a lot line at a distance there from equal to the depth of the required setback.
Lot: A developed or undeveloped tract or area of land established by plat, having defined boundaries and legally transferable as a single unit of land; does not refer to public rights-of-way; also, a parcel of land, whether or not platted, in single ownership, and not divided by a street.
Lot of record: Any lot identified on a final subdivision plat approved by Bartow County and recorded in the office of the clerk of Bartow Superior Court is a lot of record. Any lot described in a deed, sales contract or survey, that was recorded in the office of the Bartow County Recorder before September 31, 1993 is a lot of record. Any lot described in a deed, sales contract, or survey that was recorded after September 31, 1993 and the present, and which complied with the zoning requirements in effect at the time of its creation, is a lot of record.
Lot, depth of: The mean horizontal distance between the front and rear lot lines, measured in the general direction of the side lot lines.
Lot, width of: The distance between side lot lines.
Major intersection: The intersection of two or more public streets in which at least one of the streets is an arterial or major collector as designated by the comprehensive plan and the roadway classification map.
Major thoroughfare: Any public street, existing or proposed, which is shown in the comprehensive plan and roadway classification map as an arterial or major collector.
Mean sea level: The average height of the sea for all stages of the tide. It is used as a reference for establishing various elevations within the floodplain. For purposes of these regulations, the term is synonymous with National Geodetic Vertical Datum (NGVD).
Minor collector: A through street having the primary function of connecting subdivisions or other areas to major thoroughfares, or functioning as a central route within a subdivision channeling traffic from the local streets to either an abutting major thoroughfare or another CDB:17 Supp. No. 18
minor collector street. For the purposes of these regulations, a central but non-through route within a subdivision or other project will be considered as a minor collector, if the average daily traffic generated by the development on the route will exceed 2,000 trips.
National American Vertical Datum (NAVD): As corrected in 1988, a vertical control used as a reference for establishing varying elevations within the floodplain.
Natural ground surface: The ground surface in its original state before any grading, excavation or filling.
Nephelometric turbidity units (NTU): Numerical units of measure based upon photometric analytical techniques for measuring the light scattered by finely divided particles of a substance in suspension. This technique is used to estimate the extent of turbidity in water in which colloidally dispersed particles are present.
NPDES-NOI: (NPDES) shall be as per the National Pollutant Discharge Elimination System Permit and the notice of intent (NOI) as a requirement of that permit.
Owner: A person having a majority fee simple interest in real property, or a majority interest through any other form of ownership.
Performance guarantee: A bond, letter of credit, cash equivalent, or other instrument provided by the developer and approved by the Bartow County Attorney that ensures funds will be available to the county if the required subdivision improvements are not completed.
Person: An individual, firm, partnership, corporation, joint venture, association, social club, fraternal organization, estate, trust, business trust, receiver, syndicate, or other group or combination acting singly or collectively for a common purpose, and the duly authorized agents thereof.
Plat: A map, plan or layout, of a county, city, town, lot, section, subdivision or development indicating the location and boundaries of properties.
Plat, final: The plat of the subdivision, meeting the requirements of these regulations, for recording in the office of the clerk of the Superior Court of Bartow County.
Preliminary plat: A drawing that shows the perimeter boundary, topography, lot arrangements, street layout and other features of a proposed subdivision, as specified in Article 4 of these regulations.
Principal use: The primary purpose for which land or a building is used.
Private dwelling: For the purpose of these regulations, a private dwelling is a single family or duplex residence located on any property that is not part of a platted subdivision.
Project: A principal building or structure, or group of buildings or structures, planned and designed as an interdependent unit together with all accessory uses or structures, utilities, drainage, access, and circulation facilities, whether built in whole or in phases. Examples include: a principal building on a lot, a residential subdivision, a multi-family development, a shopping center or an office park.
Project access improvement: Any improvement or facility that is planned and designed to provide service or access for a particular project and that is necessary for the use, safety and convenience of the occupants or users of the project and is not a system improvement. A project access improvement includes, but is not limited to: pedestrian access improvements;
site driveways; new streets; median cuts; right turn lanes; left turn lanes; acceleration lanes;
deceleration lanes; traffic control measures made necessary to serve site driveways or new streets; intersection improvements whose primary purpose at the time of construction is to provide access to the project; and necessary right-of-way dedications required for any project access improvement.
Record drawing: A survey or other drawing based on a field survey which shows existing features or components and horizontal or vertical information (grades or location of improvements).
Redevelopment: The process of developing property that has previously been developed.
See Development.
Regulations: These development regulations and all amendments thereto, and the Bartow County Development Checklist, and the Bartow County Site and Utility Details for Development, both of which are incorporated herein by reference.
Residential drainage plan: A drawing showing lot information and all improvements, as required by Article 3 of these regulations.
Right-of-way line: The dividing line between a lot, tract or parcel of land and a contiguous right-of-way.
Road: See Street, Public.
Roadway: The paved portion of a street from back of curb to back of curb (or edge to edge of pavement for streets not having curbs) but excluding driveway aprons, bridges, and large single and multi-cell culverts that in an hydrologic sense can be considered to function as a bridge.
Roadway classification map: A map maintained by the engineering department that shows the classification, as defined in these regulations, of all roadways in Bartow County.
Roadway drainage structure: A device such as a bridge, culvert or ditch that conveys water under a roadway by intercepting the flow on one side of a traveled way consisting of one or more defined lanes, with or without shoulder areas, and carrying water to a release point on the other side.
Setback: The open space between the lot line and the yard line, which shall be unobstructed by any structure other than as expressly permitted in the Bartow County Zoning Ordinance.
Site work: Development activity to prepare a property for construction of buildings or finished structures, including clearing, grubbing, grading and installation of soil sedimentation and erosion control facilities.
CDB:18.1 Supp. No. 18 Standard building codes: The state minimum standard codes as adopted by the Bartow County Building Code Ordinance, and as defined by O.C.G.A. § 8-2-20.
Street: A way for vehicular traffic, whether designated as an avenue, road, boulevard, highway, expressway, lane, alley or other way.
Structure: Anything constructed or erected, the use of which requires location on the ground, or attachment to something having location on the ground.
Subdivider: Any person, individual, firm, partnership, association, corporation, estate, trust, or any other group or combination acting as a unit dividing or proposing to divide land so as to constitute a subdivision as herein defined, including an agent of the sub-divider.
To subdivide: Dividing a tract of land into three or more lots.
Subdivision: 1 (Verb) Any division or re-division of a lot, tract or parcel, regardless of its existing or future use, into three or more lots, tracts or parcels for the purpose, whether immediate or future, of sale, legacy or building development. This includes all division of land involving a new street or change in existing streets and includes re-subdivision and, where appropriate to the context, relates to the process of subdividing or to the land or area subdivided; provided, however, that the following are not included within this definition:
(1) The combination or re-combination of portions of previously platted lots where the total number of lots is not increased and the resultant lots are equal to the standards set forth in these regulations.
(2) (Noun). Where appropriate to the context, the term "subdivision" also may be used in reference to the aggregate of all lots held in common ownership at the time of division.
System improvement: Any improvement or facility such as streets, bridges or rights-ofway identified in the comprehensive plan, and any traffic control measures, landscaping or other features to same and is further designed to provide service to the community at large.
Tie point: The point of reference for a boundary survey. Said point of reference shall be an established, monumented position that can be identified or relocated from maps, plats or other documents on public record. Two GPS ties with coordinates shall be required on all final plats.
Tree: Any self-supporting woody perennial plant, usually having a main stem or trunk and many branches, and at maturity normally attaining a trunk diameter greater than three inches at any point and a height of over ten feet.
Tree diameter: The widest cross-sectional dimension of a tree trunk measured at diameter breast height (dbh) or at any point below dbh for new trees or multi-trunked species, but in no case less than six inches from the ground.
Townhouse: A multi-family residential use consisting of three or more attached dwelling units for which fee simple title is conveyed and for which an incorporated mandatory homeowners' association is provided.
Watercourse: Any natural or artificial watercourse, stream, river, creek, channel, ditch, canal, conduit, culvert, drain, waterway, gully, ravine, or wash in which water flows either continuously or intermittently and which has a definite channel, bed and banks, and including any area adjacent thereto subject to inundation by reason of overflow or floodwater.
(Ord. of 4-15-2015, § II; Ord. of 10-1-2025)
ARTICLE III. DEVELOPMENT STANDARDS*
Sec. 3.1. Generally.
When someone desires to conduct land-disturbing activities, it is necessary to submit site construction documents for review. Bartow County generally does not require a land disturbance permit for individual residential building lots. However, all other forms of land disturbing activities do require such permits. For the purposes of determining compliance with certain provisions of these regulations, redevelopment means "a land development project on a previously developed site, but excludes ordinary maintenance activities, remodeling of existing buildings, resurfacing of paved areas, and exterior changes or improvements which do not materially increase or concentrate stormwater runoff, or cause additional nonpoint source pollution."
The engineering department coordinates the review and approval process for all site construction documents submitted to Bartow County for permitting under this section. It is important that all information requested on the application for plan review is completed.
The failure to complete or provide all information may result in delays and/or the requirement of re-submittal of an application. Acceptance of plans by Bartow County shall not constitute or guarantee any rights unless such plans are prepared in accordance with the development regulation. It is the responsibility of the applicant to ensure the completeness and accuracy of the plans. In the event an application is determined by staff to contain false or misleading information, any permit issued hereunder may be revoked or suspended with penalties assessed. For permitting a structure, a structural plan submittal is necessary as provided in section 18-161 of the Building Code for Bartow County. Additionally, it is advisable that an applicant obtains a water and/or sewer availability letter prior to commencing the permitting process.
Approval of plans by Bartow County officials or employees shall not imply nor transfer acceptance of responsibility for the application of the principles of engineering, architecture, landscape architecture or any other profession, from the professional corporation or individual under whose hand or supervision the plans were prepared and sealed.
In any development or subdivision in this county, the improvements, facilities, and utilities described in this article shall be planned for and provided by the developer, by installation and/or payment prior to the approval of the development or manufactured house park. In addition, all development or subdivision in this county must comply with the following requirements, as applicable:
(1) Relevant ordinances and construction plans. Any person wishing to develop or redevelop commercial, industrial or multi-family property, or subdivide residential, commercial, or industrial property, must submit construction plans (with hydrology), that also comply with the Bartow County Stormwater Management Ordinance, the Bartow County Floodplain Management/Flood Damage Prevention Ordinance, and the Bartow County Soil Erosion and Sedimentation Ordinance.
(2) Interdepartmental review and approval. The engineering department shall not issue a permit for any development activities until all plats and construction plans, as applicable, have been approved by the development review committee as may have authority or jurisdiction over said activities in whole or in part.
(3) Review of plats and plans required. All preliminary plats, concept plans, construction plans and final plats must be submitted to the development review committee for review and approval prior to the commencement of land disturbance or construction activities. All information requested on plan transmittal applications for plat or plan review must be provided; incomplete applications will not be accepted. Likewise all plats and plans must contain the minimum information outlined in this article. The absence of necessary design data shall result in plats and plans being resubmitted for a future plan review date.
(4) Review by departments. The engineering department shall oversee communication with reviewing departments during the review period regarding review comments.
(5) Paved streets. The developer/subdivider of any development or redevelopment or subdivision shall provide adequate streets and shall pave said streets according to minimum requirements (including appropriate width) as provided in these regulations. No subdivision shall be permitted on an unpaved street.
(6) Public water required. All residential developments must be connected to a governmentally-owned public water system, at the expense of the developer, in accordance with the rules and regulations of the Bartow County Water Department, including the Water Service and Conservation Ordinance (Code section 74-31 et seq.), and the Sewer System Ordinance (Code section 75-251 et seq.), and including the Water Department Development Procedures.
(7) Street names. The developer shall submit the names of streets and developments for approval by the county in accordance with these regulations certifying that the proposed names are not confusingly similar to other existing named streets or developments. The decision of the county approving or disapproving the proposed names shall be final.
(Ord. of 4-15-2015, § III; Ord. of 10-1-2025) Sec. 3.2. Submittal process.
It shall be the policy of Bartow County to review development proposals for compliance with the standards adopted by the Bartow County Commissioner. This policy shall also include performing this review in a timely manner so as not to delay development. In order to enhance operational efficiency of this policy it is imperative that developers thoroughly familiarize themselves with all the pertinent Bartow County Subdivision and Development policies, regulations and standards. A concept meeting that includes a preliminary review provides the development community the opportunity to receive feedback from representatives from each agency/department/division prior to the production of construction documents in order to obtain data critical to the design of the project. A concept meeting shall be scheduled in accordance with subsection 3.2.2.
(1) General procedures.
(A) All fees for both residential and non-residential developments shall be determined by resolution of the Bartow County Commissioner.
(B) It shall be a condition of the Bartow County Development Regulations that any person seeking a land disturbance permit shall be required to have completed a class and received certification per O.C.G.A. § 12-7-19.
(C) A traffic impact study shall be submitted to the County Engineer prior to submittal of civil (construction) plans if:
i. Project exceeds 150 residential dwelling units; or ii. Contains more than 50,000 square feet of gross floor area; or iii. Project will generate more than 100 trips per peak hour per current edition of the Institute of Transportation Engineers (ITE) Trip Generation
Manual.
iv. Projects that meet the thresholds of a Development of Regional Impact shall prepare a traffic study at the time of filing a rezoning application.
The traffic impact study shall be prepared, signed and sealed by a registered professional engineer and submitted to the county engineer or his/her designee for review.
(2) Pre-application conference/concept review.
(A) For the purpose of expediting applications and reducing construction plan design and development costs, the developer shall be required to consult informally with the development review committee. When residential in nature the developer should consult with a representative of the Bartow County Board of Education. The developer shall submit an electronic pdf sketch plan showing one or more designs for the proposed development and a map of the vicinity showing the relationship between the proposed development and nearby physical features, streets, subdivisions, and/or acreage tracts. The developer shall not be bound by the determination of the pre-application conference, nor shall the development review staff be bound by any such review.
CDB:18.5 Supp. No. 18
(B) A concept meeting can be scheduled through the engineering department for each Thursday morning. The request for a concept meeting must be made by contacting the engineering department by 4:00 p.m. on Wednesday of the preceding week (in other words, eight days prior to the requested conference date). The following information shall be required at the time the concept meeting is requested:
(1) A preliminary or conceptual site layout plan.
(2) Location of project site.
(3) Tax parcel of street address.
(4) District.
(5) Land Lot(s).
(6) Name of person to contact for confirmation of appointment.
(7) Contact number and email address of the person can be reached on Thursday morning.
(8) Number of people to attend conference, their names and company affiliation.
(9) The general nature of the information sought from the various county departments.
(10) The type of project proposed.
(11) See the Bartow County Stormwater Management, section 34-587 for additional requirements regarding stormwater management procedures.
(3) Plan routing. The Developer and/or his designated agent shall provide development/ construction plans for all county agencies stated herein. The community development department shall be the clearinghouse for plans submittal and pickup:
Engineering 770.387.5067 Zoning 770.387.5007 Bartow County Water and Sewer 770.387.5170 Road Department 770.387.5140 Structural Numbering/GIS 770.387.5015 Building Inspections 770.387.5005 Environmental Health 770.387.2614 Fire Marshal's Office 770.387.5151 School Board (as applicable) 770.606.5800 Cities of Adairsville, Cartersville (as applicable) Georgia Department of Transportation (as applicable)
(4) Plan submittal. The engineering department shall coordinate information for plan review and the development review committee. Electronic version of the plans shall be submitted to plans@bartowcountyga.gov with application and pertinent information that may be found at bartowcountyga.gov.
(A) To expedite the review process for resubmittals, it is strongly suggested the developer or developer's engineer prepare a line item response to all review comments addressed in revised plans by indicating sheet, number, section, detail, etc., including if necessary, to "cloud" or "balloon" all revision items and areas.
(B) The engineering department shall retain responsibility for issuance of all land disturbance permit letters and land disturbance permits for approved development projects. Once all the development review committee requirements have been met, the approvable plans as required in these regulations will be signed off electronically by each department head or his designated representative prior to the engineering department's notification to the developer of such approvals.
(Ord. of 4-15-2015, § III; Ord. of 4-14-2021(1), § II; Ord. of 10-1-2025) Sec. 3.3. Applications for preliminary plat review.
(1) Submittal process. Application for preliminary plat approval shall be submitted to the community development department using an application form to be determined by the county engineer. The application, a PDF copy and the appropriate fee shall be submitted to the department at plans@bartowcountyga.gov.
(2) Review of preliminary plat. Each project submitted for review will be reviewed in the order received.
(3) Actions taken by engineering department. After receipt of comments from the development review committee that reviews the preliminary plat, the department shall do one of the following in writing:
(A) Issue an approval of the preliminary plat.
(B) Disapprove the preliminary plat or any portion thereof on the grounds that the proposed subdivision would not meet the requirements of the development regulations, or would create conditions, which would be unfavorable to, or adversely affect, the health, safety, convenience, prosperity, or general welfare of the citizens of Bartow County. In such case, the county engineer shall notify the applicant in writing of the county's decision.
(C) Issue a list of requirements and corrections. If the development review committee determines that an insufficient amount of information, detail or design was provided for review, the project shall be resubmitted.
CDB:18.7 Supp. No. 18
(D) Upon approval of the preliminary plat, the developer shall submit an electronic copy to the community development department for inclusion into the county's GIS system. This will assist public safety personnel in locating and addressing for emergency services and model home permitting.
(4) Preliminary plat approval binding one year. Approval of the preliminary plat shall be effective and binding upon the county for a period not to exceed one year from the date of approval and shall thereafter expire and be null and void except to the extent that work on the subdivision has progressed, unless a request for a one-time extension of time (limited to six months) has been submitted to and is subsequently approved by the engineering department.
(5) What approval of the preliminary plat constitutes. Approval of the preliminary plat is an expression of approval of the layout submitted on the preliminary plat as a guide to the preparation of the construction documents and the final plat, and is not to be considered as approval of the final plat.
(6) Effect on status of dedication. The approval of a preliminary plat by the county shall not be deemed to constitute or affect an acceptance by the county of any street or other ground shown upon the plat.
(7) Improvements authorized. Notwithstanding preliminary approval, no improvements are authorized before approval of construction plans by all review departments as set forth in Section 3.4, Construction Plan Approval, of these regulations. Improvements must be installed according to construction plans. Any modifications must be approved by the appropriate department or agency representative authorized to approve such changes.
(8) Preliminary plat submittal specifications. The preliminary plat shall be clearly and legibly drawn at a standard engineering scale of not less than 100 feet to one inch (1"=100').
The preliminary plat shall be prepared by the appropriate design professional, and seal of the certifier shall be shown on the plat.
(A) The proposed name of the subdivision and the proposed street names shall be in accordance with these regulations. The developer shall submit the names of developments and streets for approval to the GIS department certifying the proposed names are not confusingly similar to other existing named developments and streets.
The street name index, maintained by the county's GIS department, can provide information on existing street names.
(B) The preliminary plat shall contain the items as summarized in the appropriate Bartow County Preliminary Plat Review Checklist incorporated herein by reference.
From time to time the checklist may be amended from time to time by the authority of the engineering department director.
(C) Plat certificates. Each preliminary plat submitted to the community development department shall carry the following certificates printed or stamped thereon substantially as follows:
1. Preliminary certification statement:
"I hereby certify that this proposed preliminary plat represents data compiled or verified through a survey completed by me on 20 , of
property shown and described heron. According to the State of Georgia Safe Dams Act Map for Bartow County, Georgia, I have determined this development does not lie in a basin below a Category II Dam."
By:
Registered Georgia Land Surveyor No:
-ORBy:
Registered Georgia Landscape Architect No:
-ORBy:
Registered Georgia Professional Engineer No:
2. Preliminary soil analysis certificate: (By Georgia Department of Human Resources (DHR) certified soil classifier):
"I hereby certify that this document is a true representation of the results of an actual comprehensive soil analysis at a minimum DHR level three (3) soil survey by me or under my supervision and that areas are shown that are not acceptable sites for individual septic system as required by the local and/or State Health Department."
By:
Certification No:
Date:
3. Bartow County Environmental Health Department Certificate:
"Pursuant to the State Health requirements, a comprehensive soil analysis at a minimum DHR level three (3) soil survey was given final approval by the Bartow County Environmental Health Department on date stated below all of the conditions of approval having been completed, this document is hereby accepted."
By:
Date:
4. Preliminary plat approval certificate. The following approval certification should be provided on the preliminary plat to indicate the approval and acceptance of the appropriate Bartow County agencies/departments/divisions.
"All requirements of the Bartow County Development Regulations relative to the preparation and submission of a preliminary plat have been fulfilled, CDB:18.9 Supp. No. 18
approval of this preliminary plat is hereby granted, subject to the further requirement of said Regulations. This approval does not constitute review and approval for a required land disturbance permit and any project related improvements required by the Bartow County Zoning Ordinance or Bartow County Development Regulations as part of the land disturbance permit.
This certificate shall expire on Engineering Division Date Zoning Division Date
5. Each preliminary plat must contain the additional language in bold print:
"PRELIMINARY PLAT, NOT TO BE RECORDED"
6. Preliminary plat filing fee. At the time of filing an application for preliminary plat approval, a fee shall be paid to the community development department.
See fee schedule for appropriate fee.
(Ord. of 4-15-2015, § III; Ord. of 5-11-2016, § I; Ord. of 10-1-2025) Sec. 3.4. Applications for construction plan review and approval.
(1) Submittal process. Application for construction plan approval shall be submitted to the department using the application form provided. The application, along with a pdf file of the construction plans, a pdf file of a stormwater management report and the appropriate fee, shall be submitted to the department. The ideal plan sheet size is 24 inches by 36 inches.
A land disturbance permit number will be assigned to each project to assist in tracking plans during the process. The number assigned during preliminary plat review will continue to be used for residential projects.
The applicant is responsible for submitting a set of plans to utility departments (e.g., Cartersville Gas, Adairsville Water, etc.) of each municipality separately if applicable.
(2) Information required at the time of submittal. In addition to the required application form the following information/documents shall be provided:
(A) An approved preliminary plat (for residential projects).
(B) The centerline of the development entrance(s) shall be located by nail and cap and painted at the centerline or edge of pavement of the roadway that the development will access. Said nail and cap location shall be indicated on the submitted construction plans along with the date that the nail and cap were placed.
(C) Satisfactory results of a fire flow test.
(D) Verification of erosion/sediment control certification(s).
(E) An approved method of sewage disposal.
(F) Satisfactory intersection sight distance and entrance plan.
(G) A plan for proper disposal of waste as defined by O.C.G.A § 16-7-51(6), et, seq., and as may be amended from time to time, from the clearing and grubbing of trees and vegetation.
(H) Construction plans required. All site construction documents, (hereafter the "Plan Review Copy") for approval include the following drawings:
Title sheet with project map and description Preliminary plat or plan Grading/drainage plan Storm drainage profiles Soil erosion/sediment control plan Landscape/tree planting plan Water layout plan Sanitary sewer plan Sanitary sewer plan/profiles Intersection site distance plan Street plan/profiles Construction details Hydrology report Construction plans shall be submitted so as to demonstrate full compliance with all applicable provisions of the following: 1) these regulations; 2) the Bartow County Site And Utility Details For Development; 3) the Bartow County Development Checklist;
4) the Bartow County Soil Erosion and Sedimentation Ordinance (Code Sec. 34-251 et seq.); 5) the Bartow County Flood Damage Prevention Ordinance (Code section 34-31 et seq.); and 6) applicable state and federal rules, regulations and laws. The fees for review of plans and re-submittals shall be as determined by the commissioner of Bartow County from time to time. Said fees shall be paid at the time of submission.
(I) Pursuant to the Georgia Safe Dams Program, when an existing Category II dam is reclassified to a Category I dam because of proposed development downstream of the dam, the developer shall provide for review to the State of Georgia the following information:
(1) Location of the Category II dam and the proposed development; and
(2) A surveyed cross-section as required by the Georgia Safe Dams Act of the stream valley at the location of the proposed development including proposed finished floor elevations;
(3) A dam breach analysis using the Dambreak computer model to establish the height of the flood wave in the downstream floodplain. The Dambreak modeling CDB:18.11 Supp. No. 18
shall be completed in accordance with the Safe Dams Program Quality Assurance Program by a qualified registered engineer. The dam breach analysis shall identify all existing structures within the dam breach zone area, if any, and the use of each structure. Inventory information regarding Category II dams within Bartow County may be obtained through the Georgia Safe Dams Program.
(J) The maximum allowable size for construction plans shall be 24 inches by 36 inches.
The preparation of construction plans shall include all the applicable information outlined in these regulations. A list of the staff members of the development review committee that assist in the review and approval of the site design plans is maintained by the community development department. Each County agency/ department/division involved in the review and approval process can provide a list of data required to complete compliance with the development standards (also referred to as checklists).
(K) The applicant is responsible for submitting a set of plans to the appropriate utility department of each municipality as applicable.
(3) [Reserved.]
(4) Project approval. Following completion of the construction plan review, an individual shall be required to incorporate all comments and recommendations into a revised set of construction plans. The amended plans must be accompanied by the red-line "Plan Review Copy" of the plans and by the package of comments returned by each agency/department/ divisions. Additionally, the agency/department/division shall evidence its approval by signature on the plans. Should these projects fall outside the jurisdictional boundaries of a Bartow County Agency/Department/Division such as water, or sewer, those jurisdictions' approval must be shown on the face of the documents. Upon receiving approval from all agencies/departments/divisions and affected outside jurisdictions, the applicant is granted a land disturbance permit at the preconstruction meeting.
(A) [Reserved.]
(B) [Reserved.]
(C) The engineering department will issue a land disturbance permit letter for the project upon successfully obtaining the final approval of the development review committee. Once all required documentation, including bonds and/or letters of credit, preconstruction certifications, a copy of the NPDES notice of intent (NOI) ensuring compliance with the state general permit and appropriate permit fees have be submitted to the community development department, the development permit will be delivered to the project site by the department's development inspector at the time of the scheduled pre-construction meeting as required in these regulations.
(D) Construction plan approval binding one year. Approval of the site construction plans shall be effective and binding upon the county for a period not to exceed one year from the date of approval and shall thereafter expire and be null and void except to the extent that work on the project has progressed, unless a request for an extension of time has been submitted to and is subsequently approved by the community development department. Land disturbing activities under this permit must commence within 120 days after issuance of permit. Failure to begin work may be cause for the permit to be canceled. Once a permit has been canceled, it cannot be reactivated for any reason. A new set of construction plans must be submitted in accordance with these regulations when the applicant is ready to begin land disturbance.
(5) Required documentation prior to issuance of permit; sureties. No land disturbance permit shall be issued by the county to the developer until a surety or sureties have been furnished to the engineering division, in forms acceptable to the county (bond, cash deposit) for the various requirements of this ordinance. The county's preference shall be for bonds.
Bartow County Engineering Department may, at its discretion, agree to accept an irrevocable letter of credit in lieu of a surety bond. Said bond must be in a form acceptable to Bartow County. See Section 6.142 for the method to calculate the amount of surety required in this section.
The purpose of the sureties shall be any or all of the following, depending on the particular development: 1) to secure performance of the erosion and sedimentation control work in compliance with county regulations; 2) to ensure proper construction of roads, stormwater facilities and other improvements that are to be dedicated to the county in new developments; 3) to ensure proper construction of any work performed in existing Bartow County rights-of-way; 4) to provide a guaranty for the warranty and maintenance period applicable to any new road or work in any existing county right-of-way.
All original preconstruction certifications shall be submitted to the engineering division prior to issuance of a land disturbance permit.
(A) E&S surety. Prior to issuance of a land disturbance permit the developer shall cause to be executed in favor of Bartow County, an original bond in an amount as set forth by the Bartow County Soil Erosion and Sedimentation Control Ordinance. Said bond is for guaranty of soil erosion and sedimentation best management practices (BMPs).