All utility crossings, service lines, conduit, or other related appurtenances shall be installed within the limits of the roadbed plus 2 feet of each side of the pavement surface, prior to the placement and compaction of the graded aggregate base course. Utilities should be installed following the installation of curb and gutter, unless the curb line is accurately staked at 50 foot intervals to insure proper utility locations as specified in Sec. 1017. The developer shall coordinate the location of all utilities and provide a copy of all as-built and proposed locations at final plat.

Read this code where it is posted (city website) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:bogart/zoning/1021.03@2026-11-14-0c3b01b46e

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Bogart Zoning Ordinance, Sec. 1021.03. Installation of utilities; general | Georgia Commons