Skip to content
Georgia Commons
Menu

Braselton · Zoning Ordinance

Article 11 - STREAM BUFFERS AND OTHER ENVIRONMENTAL REGULATIONS

11.3. Mulberry River Water Supply

About this text

  • As posted on the city's website, retrieved 2026-11-11

Watershed Protection Minimum criteria for large water supply watersheds.

A. A large water supply watershed has 100 square miles or more of land within the

drainage basin upstream of a governmentally owned public drinking water supply intake.

B. The stream corridors of a large water supply watershed tributary to the water supply intake have no specified minimum criteria for

protection, except the stream corridors of the perennial tributaries of a water supply

reservoir in a large water supply watershed, which are protected as described in (C) below.

C. The corridors of all perennial streams in a large water supply watershed tributary to a water supply reservoir within a seven mile radius of the reservoir boundary are protected by the following criteria:

1. A buffer must be maintained for a distance of 100 feet on both sides of the stream as measured from the point where vegetation has been wrested by normal stream flow or wave action.

2. No impervious surface may be constructed within a 150 foot setback area on both

sides of the stream as measured from the point where vegetation has been wrested

by normal stream flow or wave action.

3. Septic tanks and septic tank drain fields are prohibited in the setback area of 2.

above.

D. The remainder of a large water supply watershed tributary to the water supply intake has no specified minimum criteria for

protection, except that new facilities, located within seven miles of a water supply intake or water supply reservoir, which handle

hazardous materials of the types and amounts determined by the Department of Natural Resources, must perform their operations on impermeable surfaces having spill and leak collection systems as prescribed by the Department of Natural Resources.

E. The water supply reservoirs in large water supply watersheds will be managed as

follows.

1. The owner of a water supply reservoir must develop a reservoir management plan for

approval of the Department of Natural Resources. If the Department owns the reservoir, the plan must be prepared in cooperation with the local governments using the reservoir.

2. A reservoir management plan must address the recreational use of the reservoir and the maintenance of a buffer around the reservoir.

a. Any recreational uses must take into consideration the protection of the water quality of the reservoir for drinking water purposes. Any of the following recreational uses are permissible in the reservoir management plan if the water quality of the reservoir is adequately protected.

i. Swimming ii. Fishing iii. Boating iv. Docks

v. Public access vi. Adjacent property owner access

b. The reservoir management plan must include a buffer that must be maintained for a distance of 150 feet from the reservoir boundary. The allowable buffer vegetation and disturbance must be specified in the reservoir management plan. Allowable disturbances may include public and/or private access to the reservoir and/or the buffer via docks, trails, and similar amenities provided that these

disturbances are addressed in the reservoir management plan.

c. Reservoir owners may adopt buffers of differing sizes than in b. above upon

approval of the Department of Natural Resources.

Read this code where it is posted (city website (Revize)) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:braselton/zoning/11.3@2026-11-11-d88bcbb94d

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Braselton Zoning Ordinance, 11.3. Mulberry River Water Supply | Georgia Commons