Braselton · Zoning Ordinance

Article 13 - CONSTRUCTION CODE

13.8. Inspections

About this text

  • As posted on the city's website, retrieved 2026-11-11

A. Existing building inspections. Before issuing a permit, the building official may examine or cause to be examined any building, electrical, gas, mechanical, or plumbing systems for which an application has been received for a permit to enlarge, alter, repair, move,

demolish, install, or change the occupancy.

They must inspect all buildings, structures, electrical, gas, mechanical, and plumbing systems, from time to time, during and upon completion of the work for which a permit was issued. They must make a record of every such examination and inspection and of all violations of the construction codes.

B. Manufacturers and fabricators. When deemed necessary by the building official, they must make, or cause to be made, an

inspection of materials or assemblies at the point of manufacture or fabrication. A record must be made of every such examination and inspection and of all violations of the

construction codes.

C. Inspection service. The building official may make, or cause to be made, the inspections required by subsection (F) of this section. He or she may accept reports of inspectors of recognized inspection services provided that after investigation he or she is satisfied as to their qualifications and reliability. A certificate called for by any provision of the construction codes must not be based on such reports

unless the same are in writing and certified by a responsible officer of such service.

D. Inspections prior to issuance of certificate of occupancy or completion. The building official must inspect or cause to be inspected at various intervals all construction or work for which a permit is required, and a final

inspection must be made of every building, structure, electrical, gas, mechanical, or plumbing system upon completion, prior to the issuance of the certificate of occupancy or completion.

E. Posting of permit. Work requiring a permit may not commence until the permit holder or his or her agent posts the permit card in a

conspicuous place on the premises. The permit must be protected from the weather and located in a position that permits the building official or representative to

conveniently make the required entries thereon. This permit card must be maintained in this position by the permit holder until the certificate of occupancy or completion is issued by the building official.

F. Required inspections. The building official, upon notification from the permit holder or his or her agent, must make the following

inspections and any other inspections as necessary, and must either release that

portion of the construction or notify the permit holder or their agent of any violations that must be corrected in order to comply with the technical code:

1. Building.

a. Foundation and foundation wall inspection: To be made after trenches are excavated, the reinforcement is in place, and the forms erected, prior to the placing of concrete.

b. Slab and underfloor inspection: To be made prior to the placing of concrete.

c. Lowest floor elevation: In flood hazard area, upon placement of the lowest

floor, including the basement, and prior to further vertical construction, the

elevation certification required in section 1612.5 of the International Building Code must be submitted to the building official.

d. Frame inspection: To be made after the roof, all framing, fire blocking, and

bracing are in place, all concealing wiring, all pipes, chimneys, ducts, and vents are complete.

e. Lathe and gypsum board inspection.

Lath and gypsum board inspections must be made after lathing and gypsum board, interior and exterior, is in place, but before any plastering is applied or

gypsum board joints and fasteners are taped and finished.

f. Exception: Gypsum board that is not part of a fire-resistance rated assembly or a shear assembly.

g. Sheathing: To be made prior to the installation of the exterior finish materials.

h. Final inspection: To be made after the building is completed and ready for

occupancy.

2. Electrical.

a. Underground inspection: To be made after trenches or ditches are excavated, conduit or cable installed, and before

any backfill is put in place.

b. Rough-in inspection: To be made after the roof, framing, fire blocking, and

bracing is in place and prior to the installation of wall or ceiling membranes.

c. Final inspection: To be made after the building is complete, all required

electrical fixtures are in place and properly connected or protected, and the structure is ready for occupancy.

3. Plumbing.

a. Underground inspection: To be made after trenches or ditches are excavated, piping installed, and before any backfill is put in place.

b. Rough-in inspection: To be made after the roof, framing, fire blocking, and

bracing is in place and all soil, waste, and vent piping is complete, and prior

to this installation of wall or ceiling membranes.

c. Final inspection: To be made after the building is complete, all plumbing

fixtures are in place and properly connected, and the structure is ready for occupancy.

d. Required tests: See state plumbing code for required tests.

4. Mechanical.

a. Underground inspection: To be made after trenches or ditches are excavated, underground duct and fuel piping

installed, and before any backfill is put in place.

b. Rough-in inspection: To be made after the roof, framing, fire blocking, and

bracing are in place and all ducting, and other concealed components are

complete, and prior to the installation of wall or ceiling membranes.

c. Final inspection: To be made after the building is complete, the mechanical

system is in place and properly connected, and the structure is ready for occupancy.

5. Gas.

a. Rough piping inspection: To be made after all new piping authorized by the permit has been installed, and before any such piping has been covered or concealed or any fixtures or gas appliances have been connected.

b. Final piping inspection: To be made after all piping authorized by the permit has been installed and after all portions which are to be concealed by plastering

or otherwise have been so concealed, and before any fixtures or gas appliances have been connected. This inspection must include a pressure test.

c. Final inspection: To be made on all new gas work authorized by the permit and

such portions of existing systems as may be affected by new work or any changes in order to ensure compliance with all the requirements of the construction codes and to assure that the installation and construction of the gas system is in accordance with

reviewed plans.

6. Energy.

a. Foundation inspection: To be made before slab concrete is poured in place.

To verify that perimeter insulation has been installed correctly on any slab on grade foundations, if required.

b. Frame inspection: To be made before exterior wall insulation is concealed by wall board to check installation of

exterior walls insulation and to inspect that all holes and cracks through the

structure envelope have been sealed in an appropriate manner as to restrict air passage.

c. Final inspection: To be made after the building is completed and ready for

occupancy. To verify installation and Rvalue of ceiling and floor insulation. To verify correct SEER ratings on

appliances.

i. Flood hazard documentation. If located in a flood hazard area, documentation of the elevation of the lowest floor as required in Section 1612.5 of the International Building Code must be submitted to the building official prior to the final inspection.

7. Written release. Work may not be done on any part of a building, structure, electrical, gas, mechanical, or plumbing system

beyond the point indicated in each successive inspection without first obtaining a written release from the building official. This written release may be given only after an inspection has been made of each successive step in the

construction or installation as indicated by each of the foregoing three inspections.

8. Reinforcing steel, structural frames, insulation, plumbing, mechanical, or

electrical systems. Reinforcing steel, structural frame, insulation, plumbing, work of any part of any building or structure must not be covered or concealed without first obtaining a release from the building official.

9. Plaster fire protection. In all buildings where plaster is used for fire protection purposes, the permit holder or their agent must notify the building official after all lathing and backing is in place. Plaster may not be applied until the release from the building official has been received.

10. Other inspections. In addition to the inspections specified in this section, the building official is authorized to make or require other inspections of any

construction work to ascertain compliance with the provisions of this article and other laws that are enforced by the department of building safety.

11. For special inspections, see Chapter 17 of the International Building Code.

12. Inspection requests. It is the duty of the holder of the building permit or their duly authorized agent to notify the building

official when work is ready for inspection.

It is the duty of the permit holder to provide access to and means for inspections of

such work that are required by this article.

Read this code where it is posted (city website (Revize)) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:braselton/zoning/13.8@2026-11-11-f3ae3d4d67

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Braselton Zoning Ordinance, 13.8. Inspections | Georgia Commons