13.9. Certificates

About this text

  • As posted on the city's website, retrieved 2026-11-11

A. Certificate of occupancy.

1. Building occupancy. A new building may not be occupied, or a change made in the occupancy, nature, or use of a building or part of a building until after the building official has issued a certificate of

occupancy. Said certificate must not be issued until all required electrical, gas, mechanical, plumbing, and fire protection systems have been inspected for

compliance with the construction codes and other applicable laws and ordinances and released by the building official.

2. Issuance of certificate. Upon satisfactory completion of construction of a building or structure and installation of electrical, gas, mechanical, and plumbing systems in

accordance with the construction codes, reviewed plans and specifications, and after the final inspection, the building official may issue a certificate of

occupancy stating the nature of the occupancy permitted, the number of persons for each floor when limited by law, and the allowable load per square foot for each floor in accordance with the

provisions of the construction codes.

3. Temporary/partial occupancy. A temporary/partial certificate of occupancy may be issued for a portion of a

commercial building, which in the opinion of the building official may safely be

occupied prior to final completion of the building. The temporary/partial certificate of occupancy is forfeited if the permanent certificate of occupancy is not issued

within 90 days.

4. Existing building occupancy. A certificate of occupancy for any existing building may be obtained by applying to the building official and supplying the information and data

necessary to determine compliance with the construction codes for the occupancy intended. Where necessary, in the opinion of the building official, two sets of detailed drawings or a general inspection, or both, may be required. When, upon examination

and inspection, it is found that the building conforms to the provisions of the

construction codes and other applicable laws and ordinances for such occupancy, a certificate of occupancy may be issued.

B. Certificate of completion. Upon satisfactory completion of a building, structure, electrical, gas, mechanical, or plumbing system, a

certificate of completion may be issued. This certificate is proof that a structure or system is complete and for certain types of permits is released for use and may be connected to a utility system. This certificate does not grant authority to occupy or connect a building, such as a shell building, prior to the issuance of a certificate of occupancy.

C. Service utilities.

1. Connection. No person may make connections from a utility, source of energy, fuel, or power to any building or system which is regulated by the

construction codes for which a permit is required, until released by the building official and a certificate of occupancy or completion is issued.

2. Temporary connection. The building official may authorize the temporary connection of the building or system to the utility source of energy, fuel, or power for the purpose of testing building service systems or for use under a temporary certificate of

occupancy.

3. Authority to disconnect. The building official has the power to authorize

disconnection of utility service to the building, structure, or system regulated by the construction codes, in case of

emergency where necessary to eliminate an immediate hazard to life or property.

The building official must notify the serving utility, and whenever possible the owner and occupant of the building, structure, or service system of the decision to

disconnect prior to taking such action. If not notified prior to disconnecting, the owner or occupant of the building,

structure, or service system must be notified in writing, as soon as practical thereafter.

D. Posting floor loads.

1. Occupancy. An existing or new building may not be occupied for any purpose

which will cause the floors thereof to be loaded beyond their safe capacity. The

building official may permit occupancy of a building for mercantile, commercial, or

industrial purposes, by a specific business, when they are satisfied that the capacity will not be exceeded.

2. Storage and factory-industrial occupancies. It is the responsibility of the owner, agent, proprietor, or occupant of Group S and Group F occupancies, or any

occupancy where excessive floor loading is likely to occur, to employ a competent

architect or engineer in computing the safe load capacity. All such computations must be accompanied by an affidavit from the

architect or engineer stating the safe allowable floor load on each floor in pounds per square foot uniformly distributed. The computations and affidavit must be filed as a permanent record of the building department.

3. Signs required. In every building or part of a building used for storage, industrial, or hazardous purposes, the safe floor loads, as reviewed by the building official on the plan, must be marked on plates or

approved design which must be supplied and securely affixed by the owner of the building in a conspicuous place in each

story to which they relate. Such plates may not be removed or defaced, and if lost,

removed or defaced, must be replaced by the owner of the building.

Read this code where it is posted (city website (Revize)) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:braselton/zoning/13.9@2026-11-11-2e5cb553ad

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Braselton Zoning Ordinance, 13.9. Certificates | Georgia Commons