Sec. 104-19. Design standards for streets.

About this text

  • As published by Municode, current through 2025-10-13
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) General pavement requirement. All streets, roadways, driveways, parking lots and alleys shall comply with the minimum standards set forth in this article. No roadway, street, driveway, alley or parking lot shall be allowed to be unpaved and without curb and gutter, to eliminate all dirt and graveled roadways and parking lots.

(b) Minimum street requirements.

Description R/W Topping Width (Back to Back) GAB Type "B" Binder Type "E" Asphalt Major Thoroughfares 100' 28'+ 8" 2" 1½" Minor Thoroughfares, Collector 80' 28' 6" 2" 1½" Local 60' 24' 6" 0 2" Industrial 80' 28'+ 8" 2" 1½" Cul-de-sac and Dead-end 110' 80' (same as street ending) 2" Alley 20' 10' 6" 0 1½"

(c) Roadway construction methods.

(1) Roadway excavation, subgrade, graded aggregate base (GAB), and asphaltic concrete materials and construction methods shall comply with the state department of transportation standard specifications construction of roads and bridges:

Provide 95 percent compaction (standard Proctor) of fills up to within one foot of fill grade. Provide 100 percent compaction in upper one foot of fill in area under paving and two feet outside paving area. Provide 100 percent compaction for upper one foot of existing and/or residual soils under paving and two feet outside of paving perimeter, scarify and re-compact to 100 percent.

(2) Graded aggregate construction shall conform to state department of transportation standard specification 310. Graded aggregate base (GAB) for all streets shall be coated with a bituminous prime coat prior to applying any binder or asphalt in accordance with state department of transportation 412. Adequate time shall be given for the prime coat to cure. Tack coat shall be applied to areas adjoining existing pavement, at joints where paving may have stopped temporarily, and along curb facing. The compacted thickness of the graded aggregate base shall not be more than one-half-inch less than the required thickness at any point. If the GAB is segregated in any area, it shall be reworked until adequate gradation for compaction is achieved.

(3) The subgrade and aggregate base construction shall be inspected by the city engineer while being proof rolled with a loaded tandem axial dump truck. The maintenance period for roadways installed shall end two years after the subdivision has been platted.

(d) Street cross-section requirements. Street cross-sections shall show one-quarter-inch per foot crowns and four-foot shoulders. The side slopes shall not be steeper than 2:1 for cut or fill sections.

(e) Street grades. Street grades shall be within the following limits:

Description Maximum Major thoroughfare 7% Minor thoroughfare 8% Industrial 5% Collector 10% Local and dead-end 10% Cul-de-sac 5% Street intersections 5%

(f) Horizontal curves. Curve design shall be in accordance with good engineering practices considering probable traffic speed, traffic volume, and other appropriate factors. In no event shall horizontal curves have a radius of less than 200 feet. Super-elevated curves shall be limited to high-speed thoroughfares.

(g) Vertical curves. Sag and crest vertical curve design shall be in accordance with "1990 AASHTO Green Book".

Design Speed (mph) Rate of #Crest #Vert. #Curvature, K Rate of Sag Vert. Curvature, K 20 10 20

25 20 30 30 30 40 35 50 50 40 80 70 45 120 90 50 160 110

(h) Curb and gutter. All streets and cul-de-sacs within a development shall have curb and gutter. The developer shall specify either rolled or L-back curb and gutter. All residential curb and gutter shall be roll-back. Both curb types shall be 24 inches deep. L-back curbs shall slope one inch per 18 inches, be six inches thick, and rise six inches. Roll-back curbs shall slope three-fourth inch per foot for ten inches with a 12-inch radius roll, with the minimum thickness of six inches at the lowest point. Concrete strength shall be 3,000 psi at 28 days. Expansion joints shall be provided at all drainage structures and curb returns. The maximum distance between joints shall be 40 feet with dumpy joints every ten feet.

(i) Curb intersection radius. Curb radius measured to the back of curb shall not be greater than 30 feet at residential street intersections. Commercial, industrial, and cul-de-sac entrance radii shall not be less than 40 feet.

(j) Street intersection sight distances. The horizontal sight distance at development entrances is determined by the line of sight available two feet above the road surface. The sight distance is measured along the existing edge of pavement beginning at the centerline of the proposed entrance and ending where the projected line of sight intersects the pavement. The line of sight is the projected line of visibility beginning at the entrance centerline and tangent to an obstruction two feet above the road surface. Obstructions are vegetation, ground cover, signs, and existing topography. The vertical sight distance at the development entrance near a crest is determined by the line of sight available from the driver's eye four feet above the pavement to an object six inches high at the centerline of the entrance. The sight distance is measured along the roadway.

Speed Limit (mph) Minimum Horizontal Stopping Sight Distance (feet) Minimum Vertical Stopping Sight Distance (feet) 25 150 200 30 200 200 35 250 250 40 325 300 45 400 400 50 475 475 55 550 550

(k) Entrance types. The entrance to the development should consider the number of lots served, the horizontal and vertical sight distances available at the existing road, and traffic flow patterns leaving the development. Residential subdivisions with less than 20 lots and commercial or industrial subdivisions on a minor thoroughfare shall have a 75-foot radius curb and gutter entrance with a 50-foot taper. Commercial or industrial subdivisions on major thoroughfares and residential subdivision with 20 to 200 lots shall have 200 feet each of acceleration and deceleration lanes along with those requirements previously mentioned at the entrance.

Residential subdivisions with over 200 lots shall have a left turn lane, a right lane merging into the acceleration lane in addition to those aforementioned requirements. Depending on the location, commercial or industrial subdivisions may be required to have the same entrance as residential subdivisions with over 200 lots.

(l) Streets located near or paralleling an existing stream or drainage area. When a proposed street is located near or paralleling an existing stream or drainage way, street construction must be above the projected 50-year flood high water elevation.

(m) Driveways. Driveways shall conform to state department of transportation standard 9031-J. The depth of commercial and residential driveways shall be constructed eight- and six-inch respectively.

History

The history line the source prints at the end of the section.

(Code 1996, § 82-173; Ord. of 3-8-1999, pt. V, art. 3)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:bremen/zoning/104-19@2025-10-13-48eb6a6f5e

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Bremen Zoning Ordinance, Sec. 104-19. Design standards for streets | Georgia Commons