Skip to content
Georgia Commons
Menu

Bremen · Zoning Ordinance

Part III - LAND DEVELOPMENT CODE / Chapter 120 - SUBDIVISION AND PLATTING REGULATIONS / Article II - PLATTING PROCEDURE

Sec. 120-32. Subdivision construction plan approval.

About this text

  • As published by Municode, current through 2025-10-13
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Subdivision construction plan submittal. The subdivision construction plan submittal shall consist of the engineering construction plans meeting all design standards and development requirements outlined in this chapter or otherwise provided by this Code or land development code. Once approved a performance bond may be submitted to the city to ensure

that the infrastructure will be installed.

(1) The engineered construction plans shall include street and drainage information, water and sewer plans and erosion control plans meeting the applicable city requirements.

(2) Samples of required bonds are available from the codes enforcement officer and engineer.

(b) Qualified engineers. Engineered construction plans shall be prepared by a registered professional engineer currently licensed in the state, regularly engaged in the design of such facilities.

History

The history line the source prints at the end of the section.

(Code 1996, § 82-85(a), (b); Ord. of 3-8-1999, pt. II, art. 9)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:bremen/zoning/120-32@2025-10-13-738639838f

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.