111.02.09. Construction methods.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. Trench excavation.

1) It is the responsibility of those installing sanitary sewers, lift stations, waste treatment plants, and related appurtenances to conform to OSHA regulations, 29 CFR part 1926, subpart P, paragraph 1926.650 through 1926.653 during trench excavation. The city assumes no liability or responsibility for unsafe trench conditions.

2) Pipe trenches shall be cut straight and true to the lines and grades and in the location shown on the plans. The bottom of the trench shall be cut carefully to the required grade of the pipe except where bedding materials or cradles are shown, in which case the excavation shall extend to the bottom of the bedding or cradles as shown on the plans.

3) Bell holes shall be excavated at proper intervals so the barrel of the pipe will rest for its entire length upon the bottom of the trench and the pipe weight shall not rest on the bells. Bell holes shall be large enough to permit proper installation of all joints in the pipe.

4) Pipe trenches shall not be excavated more than 100 feet in advance of pipe laying, and all work shall be performed to cause the least possible inconvenience to the public. Adequate temporary bridges or crossings shall be constructed and maintained where required to permit uninterrupted vehicular and pedestrian traffic.

5) All excavations shall be adequately guarded with barricades and lights in compliance with all OSHA, Cherokee County and the Georgia Department of Transportation requirements so as to protect the public and workers from hazard.

6) Excavations adjacent to existing or proposed buildings and structures or in paved streets or alleys shall be adequately protected by the use of trench boxes, sheeting, shoring and bracing to prevent cave-ins of the excavation, or the undermining or subsequent settlement of adjacent structures or pavements.

Underpinning of adjacent structures shall be done when necessary to maintain structures in safe condition.

7) Streets, sidewalks, parkways, and other public and private property disturbed in the course of the work shall be restored to as near as original condition as possible or better in a manner satisfactory to the city.

8) Whenever water is present in the trench, it shall be removed in a manner satisfactory to the city and enough backfill shall be placed on the pipe to prevent floating. Any pipe that has floated shall be removed from the trench and re-laid later during dry conditions. No pipe shall be laid in wet trench conditions that preclude proper bedding, or on frozen trench bottom, or when, in the opinion of the city the trench conditions or the weather are unsuitable for proper installation.

9) Construction occurring around active sewer systems shall be done in such a way so as to prevent the passage of wastewater onto the ground. Absolutely no wastewater shall be allowed to spill onto the ground.

10) During the sewer line construction an effort shall be made to minimize the cutting of trees.

B. Rock excavation.

1) Drilling and blasting operations shall be conducted with due regard for the safety of persons and property in the vicinity and in strict conformity with requirements of all ordinances, laws and regulations relative to the handling, storing and use of explosives. Rock excavation near existing pipelines or other structures shall be conducted with the utmost care to avoid damage, injury or damage to structures or property shall be promptly repaired by the contractor to the satisfaction of the city and property owner.

2) Rock in trenches shall be excavated over the horizontal limits of excavation and to depths as shown in table 111-5:

Table 111-5 Depth of Excavation Below Bottom of Sewer Pipe Size of Pipe, inches Depth of Excavation Below Bottom of Sewer Pipe, inches 4 and Less 4 4 to 6 6 8 to 18 8 18 to 30 10 Over 30 12

3) The space below grade for pipe lines shall then be backfilled with #57 and smaller crushed rock, gravel, subgrade stabilizer or other approved bedding material and compacted.

C. Backfilling trenches.

1) Backfill material shall consist of fine, loose earth containing sufficient but not excessive moisture content for thorough compaction. Material that is too dry for adequate compaction shall receive a prior admix of sufficient water to secure adequate moisture content. Material having excessive water content shall not be placed at any time. Backfill material shall be free of large clods, stones, vegetable matter, debris, and other objectionable material.All unsuitable excavated material and excess material must be properly disposed of in a manner that will not adversely affect the environment.

2) All backfill beneath roads, sidewalks, or other critical areas shall be compacted to 95 percent standard proctor or as otherwise required by the DOT or other such agency having jurisdiction using mechanical tamping equipment in six-inch lifts. It shall be the responsibility of the contractor to demonstrate to the city that 95 percent compaction has been obtained.

D. Installation of sewer pipe.

1) Pipe and accessories shall at all times be handled with care to avoid damage. Whether moved by hand, skidways or hoists, material shall not be dropped or bumped. The interior of all pipe shall be kept free from dirt and foreign matter at all times. Each joint of pipe shall be unloaded opposite or near the place where it is to be laid in the trench.

2) All such material that is defective in manufacture or has been damaged in transit or after delivery shall be removed from the job site.

3) Sewer pipes shall be joined by "push-on" joints using elastomeric gaskets to affect the pressure seal.

The ends of pipe to be joined and the gaskets shall be cleaned immediately before assembly, and the assembly shall be made as recommended by the pipe manufacturer. Lubricant used must be non-toxic and supplied or approved for use by the pipe manufacturer. Sewer pipes shall be laid in the uphill direction with the bells pointing upgrade. Any variation from this procedure shall require approval from the city.

4) When pipe laying is not in progress, the open ends of installed pipe shall be plugged by approved means to prevent entrance of trench water into the line.

5) No special laying conditions are required for ductile iron pipe (DIP) other than haunching and soil compaction to 12 inches above the spring line and any other conditions which are stipulated elsewhere in these specifications.

6) Bell holes shall be provided of sufficient size to allow ample room for making the pipe joints properly.

The bottom of the trench between bell holes shall be carefully graded so that the pipe barrel will rest on a solid foundation for its entire length as shown on the plans. Each joint shall be laid so that it will form a close concentric joint with adjoining pipe and in order to avoid sudden offsets or inequalities in the flow line.

7) Water shall not be allowed to run or stand in the trench before the trench has been backfilled.

The contractor at no time shall open up more trench than his available pumping facilities are able to dewater.

8) The following laying conditions shall be followed with PVC pipe:

a. By embedding PVC pipe in sand or graded gravel, no special compaction requirements will be necessary. However, the sand or gravel must extend from six inches below the pipe to twelve inches above the pipe and the material must be firmly placed under the pipe haunches. See the standard details in chapter 112.

b. When embedding PVC pipe in friable, compressible soils (e.g. silt, clay, sandy clay, silty clays, etc.), special care must be exercised to provide a uniform (undisturbed or fully compacted) trench bottom. Additionally, the backfill must be compacted to 95 percent Standard Proctor in six inch lifts to twelve inches above the top of the pipe.

9) All sewer installations shall be installed with tracer wire attached to the sewer pipe.

E. Railroad crossings.

1) All railroad crossings shall conform to the requirements of the American Railway Engineering Association Manual for Railway Engineering, Part 5. The contractor shall secure permission from the railroads to schedule the work so as not to interfere with the operation of the railroads. The contractor shall be held responsible for any delays or damages occurring to the railroads. The contractor will furnish the railroad with such additional insurance as may be required, cost of same to be borne by the contractor, together with the costs for flagmen, watchmen, temporary work of any nature, safety devices and any other items that may be imposed by the railroad.

F. Highway crossings.

1) The contractor shall be responsible for the coordinating and scheduling of all construction work in the state highway right-of-way with the Georgia Department of Transportation.

2) Work along and across Georgia State Highway right-of-way shall conform to Georgia DOT Standard Specifications for Construction of Roads and Bridges.

3) The contractor is required to obtain all necessary permits. Traffic control within the state of Georgia right-of-way shall comply with section 107.09 of the State of Georgia DOT Standard Construction Specifications, or sections 104.05 and 107.07 of the U.S. Manual on Uniform Traffic Control Devices for Streets and Highways, latest editions.

G. Stream crossings.

1) Stream crossing shall be done in compliance with the federal, state and local laws and permit requirements. The methods described in this subsection are subject to change due to more recent regulations implemented by the varying government agencies. General requirements include the following:

a. The contractor is liable for knowing and complying with the most stringent regulations in force at the time of construction.

b. The suggested method of crossing a river, stream, creek, impoundments, or wet weather ditch is with a bore under the creek or river with a minimum of two feet of cover between the lowest point in the stream and the top of outside diameter of the casing.

c. Casings and ductile iron pipe are required for all stream crossings and shall extend a minimum of 20 feet beyond the vegetative buffer (state or city buffer, whichever is wider) on each side.

d. An open cut of the stream is allowable if no endangered species are affected and if the Developer obtains written permission from the various governing agencies. Written permission shall be submitted to the City of Canton. If the stream is open cut, concrete collars or encasement must be provided at all joints for ductile iron pipe with less than three feet of cover. Design engineer is responsible for checking and designing against floatation. Where streams are allowed to be open cut by variance, the construction in stream beds shall follow the following guidelines:

i. Construction in and around stream beds must adhere to the current regulations of the Georgia EPD, the Corps of Engineers, City of Canton Engineering and the U.S. Department of Fish and Wildlife. The design engineer and contractor are responsible for knowing, coordinating and complying with these regulations.

ii. All necessary permits and buffer variances must be acquired by the Developer prior to the final approval of the plans by the city.

iii. Any item published within this UDC that is in conflict with the EPD's stream bed protection regulations is hereby deemed invalid, unless the specification herein is considered more stringent by the reviewing agency.

2) Fording of live streams with construction equipment will not be permitted, unless specifically approved in writing. Unless, otherwise approved in writing, mechanized equipment shall not be operated in live streams except as may be required to construct temporary diversion structures, and temporary or permanent structures.

3) Erosion control measures shall be installed prior to performing any stream crossings. All work should be performed when stream flows are at their lowest, and all work should be performed as quickly and safely as possible. As soon as conditions permit, the stream bed shall be cleared of all false work, debris, and other obstructions placed therein or caused by the construction operations.

H. Jack and bore.

1) Jacks for forcing the casing pipe through the roadbed shall have a jacking head constructed in such a manner as to apply uniform pressure around the ring of the pipe. The pipe to be jacked shall be set on guides, braced together, to properly support the section of the pipe and direct it to the proper line and grade. In general, roadbed material shall be excavated just ahead of the pipe, the excavated material removed through the pipe, and the pipe then forced through the roadbed into the excavated space.

2) Where pipe is required to be installed under railroads, highways, streets or other facilities by jacking or boring methods, construction shall be done in a manner that will not interfere with the operation of the facility, and shall not weaken the roadbed or structure.

3) The use of water or other fluids in connection with the boring operation will be permitted only to the extent necessary to lubricate cuttings. Jetting will not be permitted.

4) The diameter of the excavation shall conform to the outside diameter and circumference of the casing pipe as closely as practicable. Any voids which develop during the installation operation shall be pressure grouted.

5) The pipe shall be jacked from the low or downstream end. At each end of the casing pipe the void between the carrier pipe and casing shall be sealed with brick and mortar. Any pipe damaged in jacking operations shall be removed, and replaced by the contractor at his expense.

6) After the steel casing pipe has been installed, the DIP carrier pipe shall be installed in the casing pipe. Care shall be exercised at all times to protect the coating and lining of this pipe and to maintain tight, full-seated joints in the carrier pipe.

I. Replacement of pavement.

1) Contractor shall fully restore and replace all pavement, curbs, gutters, sidewalks and other surface structures removed or disturbed, to a condition that is equal to or better than the original condition in a manner satisfactory to the city.

2) Pavement cuts.All pavement cuts on city roads shall be made by sawing prior to excavation to eliminate uneven and ragged edges.

3) Where sewer lines are installed in existing paved streets, the streets in which the sewer lines are installed shall receive a full width asphalt repaving in accordance with these specifications.

J. Location and protection of existing underground utilities.

1) It is the responsibility of the contractor to locate and protect all underground utilities and structures.

2) Utilities shall not be moved or disturbed without the approval of the utility company.

3) Any damage caused by sewer line installation to any utility or structure shall be immediately reported to the city and repaired at the contractor's expense.

K. Protection of water supply and other utilities.

1) The City of Canton has an established cross-connection program to prevent the entry of contaminants or pollutants into any area of the potable water supply through the control of cross connections. The following requirements shall apply. See also the cross-connection control program section in chapter 110 of this UDC.

a. It is illegal to introduce any substance into or to have any cross connections with the potable water supply.

b. There shall be no physical connection between a public or private potable water supply system and a sanitary sewer which would permit the passage of any sewage or polluted water into the potable water supply.

2) A horizontal separation of at least ten feet is required between water mains and existing or proposed sanitary sewer mains (measured edge to edge). Should conditions prevent a separation of ten feet, the lines shall be laid in separate trenches. In either case, the elevation of the crown of the sewer shall be at least 18 inches below the invert of the water main.

3) When sewers cross under water mains, the sewer shall be laid so that the crown of the sewer shall be at least 18 inches below the invert of the water main. The two pipes shall be installed such that a full length of pipe will be centered over the crossing so that all joints will be separated as much as possible. Ductile iron pipe shall be installed for both mains when clearance is less than two feet.

4) In the rare circumstance when the 18 inches clearance between the water and sewer mains cannot be maintained, the mains shall be installed as described in the paragraph above with the joints as far apart as possible and be constructed of ductile iron pipe.

5) When sewers are laid within public streets, the manholes and sewer lines shall normally be laid along the centerline of the street at a depth of not less than six feet from the pavement surface to the top of the pipe. In curves and other areas where this is not possible, the lines and manholes are to be installed within the confines of the curb to avoid conflict with the curb and other utilities. Ductile iron pipe shall be used for sewer lines crossing storm sewers with less than a two-foot clearance and at other times when directed by the city.

L. Sewer services.

1) A sewer service shall be provided for every existing or proposed lot or building. All services shall be shown on the construction and as-built drawings. A common service shall not be allowed for two or more buildings. The service shall extend to the property line of the lot being served and shall normally be within ten feet of the lower corner of the lot. Each service shall terminate with a six-inch PVC clean-out stubbed out of the ground and sealed with a temporary PVC cap.

2) After the curb and gutter are installed, a letter "S" shall be placed on the curb directly above the service. This shall be done by either casting the letter while the concrete is green or by saw cutting it into the curb. The letter shall be four inches to six inches tall.

3) The developer shall be responsible for serving all lots developed. On any lot where the service cannot be found, the developer shall be responsible for payment of the cost of installation of the service. Also, unless noted on the final plat, the service shall be low enough to serve the first floor elevation at building line.

4) The builder shall be responsible for the location of the service prior to the pouring of the foundation, driveway or other appurtenance. The city will not be responsible for any house built too low to be served nor for any service covered by construction.

5) No plumber or contractor will be allowed to connect to the sewerage system except to the end of the service provided for his connection. Also, any service provided will be utilized without the installation of additional services. The builder will be responsible for replacing the temporary PVC cap with a traffic rated brass cap flush with grade.

6) All dumpster pads shall drain to the sanitary sewer system and shall be covered to prevent storm water to enter the sanitary sewer system. All food establishment dumpsters shall be routed through grease trap along with the above requirements.

M. Clean-up.

1) The contractor shall remove all unused material, excess rock and earth, and all other debris from the construction site as closely behind the work as practical.

a. If the contractor fails to maintain clean-up responsibilities as directed by the city's representative, the city may choose to use their own forces to do so, followed by an invoice to the developer for the city's work.

b. All trenches shall be backfilled and tamped before the end of each days work.

2) Prior to requesting the "completion of sewer main construction" inspection, the contractor shall do the following:

a. Remove and dispose of in an acceptable manner all shipping timbers, shipping bands, spacers, excess materials, broken material, crates, boxes and any other material brought to the job site.

b. Repair or replace any work, trees, lawns, shrubs, fences, flower beds, drainage culverts or other property damaged by the sewer line construction. All items damaged beyond repair shall be replaced with the same kind of material as existed prior to the damage occurring.

c. All easement areas shall be cleared of trees, stumps and other debris and left in a condition such that the easement can be maintained by bush-hog equipment.

d. All shoulders, ditches, culverts, and other areas impacted by the sewer line construction shall be at the proper grades and smooth in appearance.

e. All manhole covers shall be brought to grade.

N. Grassing.

1) A uniform stand of grass is required over all construction easements and sanitary sewer easements prior to the city's acceptance of the sewer.

a. Grass shall be as defined and installed or constructed in conformity with the temporary and permanent disturbed area stabilization of the Manual for Erosion and Sediment Control in Georgia, latest edition.

b. The grassing shall be maintained for by the contractor or developer until final acceptance of the sewer line and appurtenances by the city.

2) Grass seed shall be selected based on the type of seed suitable to the area and season of year. Refer to the Manual for Erosion and Sediment Control in Georgia for grass growing schedule, selection of grass seed, fertilizers, lime, inoculants, mulching, etc.

3) The contractor shall provide water for irrigation from the nearest available metered source. The soil must be thoroughly wet to a depth that will insure germination of the seed. Water must be applied at a rate not causing runoff or erosion. Growth and coverage on areas grassed shall be considered in reasonably close conformity with the intent of this requirement when a viable stand of grass covers at least 98 percent of the total area with no bare spots exceeding one square foot and the ground surface is fully stabilized against erosion. The contractor shall repeat all work, including plowing, fertilizing, watering, and seeding as necessary to produce a satisfactory stand.

4) The contractor or developer shall do all maintenance work necessary to keep all planted areas in satisfactory condition until the work is finally accepted. This shall include mowing, repairing washes that occur, reseeding, and water as required to produce a healthy and growing stand of grass. Mowing will be required to remove tall and obnoxious weeds before they go to seed.

O. Easement acquisition and utility encroachment permits.

1) It shall be the responsibility of the engineer and developer to obtain any off-site easements required to connect the project to existing public sewers. Assistance can be furnished by the authority if requested.

This process must be started early enough to allow construction of the sewer before any building construction is to begin. Building permits or sewer tap applications will not be issued until off-site sewers have been constructed and accepted. This condition shall override any provision for speed-up of house starts such as furnishing a bond to guarantee completion of the streets and other appurtenances.

2) All easements shall allow adequate room to construct the sewer and appurtenances. Permanent easements shall be a minimum of 20 feet wide, ten feet on each side of the line, and construction easements shall be a minimum of 60 feet wide, 30 feet on each side of the line.

3) The engineer shall furnish easement drawings prior to approval of the sewer plans. The drawings shall be either eight and one-half inches by 11 inches or eight and one-half inches by 14 inches. The drawings must be clear and legible for printing. The drawings shall be at a reasonable scale and shall not be a reduced copy of the plan sheet. The drawing will show property lines, the name of property owners with the length of line encroaching on each property, size of line, line designation, manhole numbers and stations, width of permanent and construction easement, scale of drawing, north arrow, land lot and district numbers, and a tie to the nearest land lot corner. Any streets or other existing easements shall also be shown.

4) The engineer shall furnish appropriate drawings for submittal to the owner of any state or federal highways, railroads, power lines, water lines, gas lines, petroleum lines, or any other utility lines on which the sewer construction will encroach. The drawing shall normally be eight and one-half inches by 11 inches or eight and one-half inches by 14 inches and shall show a plan view and profile view. The drawing will show the same information required for easement drawings.Also, the drawing will show the right-of-way of the existing street or utility, the owners' designation of the line, the name and number of the nearest intersection or milepost or tower number and the distance to that appurtenance. The clearance distance between the street surface, or the bottom of the rail, or the utility and the sewer will be shown. The drawing will show the type of material used for the sewer and the method of construction to be used. The drawing will also contain any other special information required by the owner of the facility on which the sewer is encroaching. Five copies of the utility encroachment drawing will be furnished with the plans when they are submitted for approval. Normally the encroachment permit will be obtained by the authority but costs incurred shall be paid by the developer. Construction permits will not be issued until the utility encroachment permit has been obtained and until any special conditions such as insurance requirements have been complied with.

P. Construction permits.

1) Construction will not be allowed until a permit has been issued by the city.

2) The contractor shall submit one copy of the approved construction plans which have been stamped approved. The contractor shall furnish his name and address, telephone number, certificate of liability insurance, and proof of his city business license to do this type of work. He shall also furnish the name of the person in charge of the project and any subcontractors and the name and telephone number of a responsible person who can be contacted in case of emergencies during nonworking hours.

3) The contractor (whose name shall appear on the approved contractor's list) shall furnish his construction schedule and shall notify the city manager and/or his designated representative a minimum of 24 hours prior to doing any work. Once the contractor begins work, he shall proceed in a workmanlike manner and shall complete the work in a reasonable time without undue off days and periods of inactivity which make it hard for the chief inspector to keep up with his activity.

Q. Inspection.

1) Inspections will be scheduled as received by the city. The development inspector must be notified 24 hours prior to any construction.

2) Upon request, the contractor shall furnish the development inspector with appropriate copies of the manufacturer's certification that the materials to be used meet the materials requirements of these specifications. The development inspector may reject any materials not meeting specifications or any faulty or damaged materials. Any materials so rejected must be removed from the project immediately and must be prominently marked so that they can be spotted on this or any other project.

3) Authorized representatives of the city, which may include appropriate county, state or federal agencies, shall have access to the site for inspection at any time.

4) The development inspector shall be notified a minimum of 24 hours before specific inspections are required so that the inspection time can be scheduled.

5) The development inspector may at any time direct that he be allowed to see any foundation, bedding, pipe work, manhole or other appurtenance. No connections to manholes, nor wyes, bends, service laterals or service stoppers shall be backfilled without the approval of the development inspector.

6) The contractor shall complete the project and shall have cleaned up the job site prior to requesting a final project inspection. The development inspector may terminate the inspection and direct further work at any time he feels that the project is not substantially complete and ready for inspection.

7) Manholes and lines shall be clean and free of all mud and debris at the time of inspection. The contractor shall furnish adequate personnel to open manholes and give whatever other assistance is needed by the development inspector.

8) The development inspector will normally visually inspect all manholes and lines for conformance to the specifications and will check the measurements shown on the "as-builts" for accuracy. The development inspector will perform low pressure air test to insure all lines are sealed. Any of the following tests may also be required at the discretion of the inspector and engineer:

a. Measurement of infiltration.

b. Smoke test.

c. Mandrel test.

d. Velocity test.

e. T.V. inspection.

f. Compaction test.

g. Ball test.

9) Any defects found by these tests must be corrected before construction of the project may proceed.

10) A punch list shall be issued for corrective work if needed. However, the development inspector shall not perform the contractor's work by finding all of his problems before the project is reasonably complete.

11) In no circumstances shall any buildings or plumbing fixtures be connected to the line until directed by the development inspector.

R. Tests.

1) All sanitary sewer lines, including both gravity sewers and force mains, shall be successfully tested before being eligible for acceptance by the city. Any of the following tests may be run at the discretion of the development inspector. All sewer mains shall also be subject to the material-specific tests listed in section 111.02.06, Materials, under each type of pipe material acceptable for sanitary sewers.

2) Measurement of infiltration.

a. The contractor shall furnish an adequate number of plugs of the proper size and acceptable weirs to measure infiltration into the system.

b. In no case will an infiltration rate greater than 100 gallons per inch diameter of pipe per mile of sewer per day be allowed. All visible or audible leaks must be dug up and repaired unless it is found to be in a joint and the city has authorized it to be repaired by chemical grouting. Any flow increase between two adjacent manholes must be corrected.

c. Measurements of flow shall be performed on any lines with a visible flow of water.

3) Low pressure air test.

a. After completing backfill of a sewer line section, conduct a low pressure air test of all pipe constructed, using methods and devices acceptable to the engineer.

b. Perform such tests using the following general procedures:

i. Temporarily plug line segment between two manholes using plugs having air tight fittings through which low pressure air can be introduced into the pipe segment being tested.

ii. Introduce low pressure air into the test pipe segment until the internal air pressure reaches

4.5 psig above ground water pressure, if any.

iii. Wait at least two minutes for air temperature in the test segment to stabilize while internal air pressure remains no less than 3.5 psig above ground water pressure.

iv. Bleed internal air pressure to exactly 3.5 psig above ground water pressure.

v. Accurately determine the elapsed time for internal pressure to drop to 2.5 psig above ground water pressure.

vi. The air test is acceptable if elapsed time is no less than shown by table 111-6.

Table 111-6 Elapsed Time Requirements Pipe Diameter, inches Second per 100 feet of Pipe 4 11 6 17 8 23 Pipe Diameter, inches Second per 100 feet of Pipe 10 28 12 34 15 43 18 51 21 60 24 68 27 77 30 85 36 102 42 119 48 136 54 153 60 170 66 187 72 204

4) Mandrel test. The mandrel test shall be performed in accordance with the following procedure for testing sewer pipe for maximum allowable deflection:

a. Completely flush the line making sure the pipe is clean of any mud or trash that would hinder the passage of the mandrel.

b. During the final flushing of the line, attach a floating block or ball to the end of the mandrel pull rope and float the rope through the line. (A nylon ski rope is recommended).

c. After the rope is threaded through the sewer line, connect the pull rope to the mandrel and place the mandrel in the entrance of the pipe.

d. Connect a second rope to the back of the mandrel. This will enable the mandrel to be retrieved if excessive deflection is encountered.

e. Remove all the slack in the pull rope by gently pulling the rope at the far manhole. After the slack has been removed, place a tape marker on the rope, close to the pipe opening where the mandrel will exit. If mandrel encounters excessive deflection, the marker will provide a means of measuring the travel distance of the mandrel so that the deflected area can be located.

f. Pull mandrel through the sewer line.

g. An increasing resistance to pull is an indication of excessive deflection. If this occurs, measure the distance from beginning marker on rope to manhole. Locate section and replace bedding or pipe if visual examination reveals damage.

h. Retest until acceptable.

5) Velocity test.

a. On lines installed at minimum grade and at any time the development inspector suspects that a problem with flow will occur, a velocity test of the suspected section may be required.

b. The contractor will add sufficient water at a point upstream of the suspect section. After flow has reached a steady state, dye or some type of floating object such as a ping pong ball or fishing float will be passed through the line.

c. The float will be timed as it passes through the section. Any line in which a velocity of two feet per second cannot be obtained will not be acceptable.

6) TV inspection.

a. All sewer lines shall be televised and a film of the inspection made before the final plat is signed and again before the final acceptance of the sewer lines. The films must be stored on DVD or other approved digital form. Prior to televising, the mains shall be flushed with water so that sags are apparent.

b. Any faulty pipe noted such as sagged pipes, broken pipes, bad joints, etc., will be dug up and will be corrected. Internal grouting to repair new lines will not be allowed. After correction of the discrepancies, the line will be re-televised.

7) Compaction test.

a. All trenches shall be subject to compaction testing after backfilling and shall meet the compaction requirements.

b. Any trench failing to meet compaction requirements shall be excavated and re-compacted and retested. This process shall continue until a passing test is achieved.

c. All costs of compaction testing shall be the responsibility of the contractor.

8) Ball test. The procedure for ball test is as follows:

a. Clean lines.

b. Place ball that is not more than ½ inch in diameter less than diameter of pipe to be tested in the end of section to be tested. For example: Ball not less than seven and one-half-inch in diameter for test of eight-inch diameter pipe.

c. Ball should travel freely through the section being tested.

S. Force main pressure and leakage test.

1) After all piping has been placed, the main shall be tested by the developer's contractor in the presence of the development inspector or his designated representative and tests shall be continued until all leaks have been made tight to the satisfaction of the city. The contractor shall furnish all necessary meters, pumps, gauges, bulkheads, and other materials and appliances necessary to conduct the test as herein required. Every precaution must be taken to valve-off or otherwise protect control equipment in or attached to the pipe line to prevent damage thereto.

2) Before applying the specified test pressure, all air shall be expelled from the pipe. If air release valves are not available at the high places, the contractor shall make the necessary taps at points of highest elevation before the test is made and insert plugs before the test has been completed.

3) Prior to the pressure test, pipe laid in trenches shall be backfilled adequately to secure the pipe during the test. Any observed leakage shall require corrective measures to pipe lines and/or joints to the satisfaction of the inspector.

4) The city will furnish the necessary water for the testing of the force mains; however, any water lost through breakage of lines or unnecessary or excessive flushing of lines will be charged to the contractor at the current residential rate. All lines shall be tested to a pressure of 200 PSI. Test duration shall be two hours. However, test pressure shall not exceed pipe, valve and/or thrust-restraint design pressures. Test pressure shall not vary by more than + five psi for the duration of the test which may require periodic pumping (in which case the added water will be counted as part of the leakage). The rate of leakage shall not exceed 15 gallons per 24 hours per inch diameter per mile of force main. (See table 111-7.)

Table 111-7 Leakage Tabulation Size of Pipe, inches Gallons/Hour/100 Feet Gallons/Day/100 Feet 3" 0.035 0.846 4" 0.047 1.136 6" 0.071 1.705 8" 0.095 2.273 10" 0.118 2.841 12" 0.142 3.409 16" 0.189 4.545

5) Any section of the line not meeting the above test shall have the leaks found and corrected at once and re-tested until the leakage falls within the limits specified above. Leakage testing must be witnessed and approved by the city.

T. Acceptance.

1) The city may issue a letter certifying the completion of the sewer system when the contractor has completed the work items shown on the plans to the satisfaction of the City of Canton Engineering Department representative.

2) On projects contracted with the city, this letter shall signal the start of the 12-month warranty period which is required of the contractor.

3) On projects for private development, this letter will allow the developer to apply for a permit for the next phase of development.

4) In no case will the completion letter be considered as final acceptance of the project, nor will the contractor and developer be relieved of their responsibility to protect and maintain the system until final acceptance is given. A completion letter may be issued for sewer lines in a subdivision before offsite sewers are complete, but this will be noted in the letter and building permits will not be issued before completion of the entire sewers.

5) Upon completion of all work items in a private development including water and sewer lines, streets, storm drains and all other utilities, the subdivision inspection team will re-inspect all phases of the development. During this inspection, the sewers will be checked for any cut lines, shifted manholes, excessive infiltration, cleanliness of lines, adjustment of manholes, and any damage by other construction.

6) The curbs will be checked for markings of services and off street sewers will be checked for settling and erosion and for proper landscaping.

7) Upon satisfactory completion of any discrepancies noted during this inspection, the developer will begin the 12-month maintenance period required for all phases of the development.

8) At the end of 12-months, the subdivision inspection team will again re-inspect the entire development.

When all discrepancies have been corrected, the city will begin perpetual maintenance of the sewerage system.

U. "As-built" drawings. At the completion of the sanitary sewer lines and when requesting the final project inspection, the contractor will furnish two sets of printed "as-built" plans and electronic data prepared in accordance with the following requirements:

1) The plans shall show all sewer information "as-built" in the field and any field changes made to the approved plans. In the event that the designer does not perform the field staking, the contractor must furnish certification from a licensed engineer or surveyor attesting to the accuracy of all elevations, grades, manhole locations, and service locations. This certification and the certification of the engineer/land surveyor preparing the "as-builts" must be shown on the drawings.

2) "As-built" drawings shall include a site plan, plan and profile sheets, and any supplementary drawings and shop drawings. Stationing of the sewer gravity and force main alignments, manholes and service laterals shall be required on the "as-builts." The "as-built" drawings shall meet the same requirements as the construction plans for review.

V. Grease traps and sand/oil traps.

1) The city has developed and implemented a sewage pretreatment program to limit the amount of grease, sand and oil entering the sewer system from restaurants, service stations, feed mills, car wash operations and any other establishment where such devices are necessary for the proper handling of liquid wastes containing sand, grease, oil, flammable wastes or other harmful ingredients.

2) The developer is required to meet with the city's pretreatment coordinator to determine the need for such a device. The city requires all such establishments to include a grease trap and/or a combination sand/oil trap as part of their sewage collection system, located between the business and the tap into the city's sewer line.

3) The standard details in chapter 112 include a typical design for these structures, but the size and dimensions of the trap and piping are dependent on the quantity of flow from the business. The design engineer will be responsible for sizing the structure and the piping and submitting design calculations with the plans. (Minimum size = 1,500 gallons) the city will review the design and calculations for minimum requirements prior to approving the construction plans.

4) The city will require that the traps be maintained and cleaned out on a regular basis at intervals determined by the city's policy. Sanitary sewage from the facility's toilets shall not route through the grease trap.

W. Dumpster pad requirements.

1) Dumpster pads shall be a minimum of five-inch thick reinforced concrete slabs on grade.

The concrete for the pads shall be 4,000 psi concrete reinforced with six-inch by six-inch welded wire fabric. The dumpster pad shall be placed on a sub-base of 12 inches of graded aggregate base. The pad shall be sloped to drain to the back of the pad at a rate of one-quarter-inch per foot. Stop posts are to be placed in front of the pad drain so the dumpster or other objects will not block access to the drain. Dumpster pads shall have six-inch concrete retaining curbs on three sides. Where required or desired, a concrete block concealment wall may substitute for the retaining wall.

2) Dumpster pad drains for single or multiple dumpster installations shall be ZURN Model ZN 415 8" grate with solid hinged lid or alternate acceptable to the city. All drains shall have either a separate or a built in trap to prevent the escape of sewer gas.

3) All drain piping shall have a minimum diameter of four inches. Piping of four inches and greater under the slab or other paved areas shall be ductile iron pipe. Piping that is not under the slab or other paving and not greater than 36 inches in depth may be PVC. Clean-outs shall be installed at all changes in piping direction. Piping shall be sloped to drain by gravity.

Minimum slope of four-inch pipe is 2.5 percent.

4) Dumpster pad drains shall be connected to and routed through the grease trap. City approval will be required for any connection varying from this requirement.

X. Industrial sewage pretreatment.

1) Wastewater connections from industrial processes shall not be made until the city's pretreatment coordinator has approved the deposit of the sewage into the system. Industrial wastewater may need to be pretreated on site before the city will accept the wastewater from certain processes. This need for pretreatment will be reviewed in the first stages of the preliminary plan review process.

2) Sanitary sewage from the facility's toilets shall not route through the pretreatment process.

The city has developed a set of "sewer use and industrial wastewater control regulations."

Developers are required to meet with the city's pretreatment coordinator to determine if the project will be required to meet the additional requirements specified in this document.

3) If the city determines that the sewage does need to be pretreated, the designer will be responsible for the design of the pretreatment process and related calculations. The design engineer will be responsible for designing the process and the piping and submitting the design and calculations with the plans. The city will review the design and calculations prior to approving the construction plans.

(Ord. No. 2014-18, § 2, 8-21-2014; Ord. No. 2018-0920-02, 9-20-2018; Ord. No. 2022-0317-01, 3-17-2022)

111.03.00 Wastewater lift station specifications.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:canton/zoning/111.02.09@2026-11-11-503e18c10c

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Canton Zoning Ordinance, 111.02.09. Construction methods | Georgia Commons