Canton · Zoning Ordinance
Part III - DEVELOPMENT CODE / Chapter 111 - DESIGN STANDARDS: SEWER SYSTEM TABLE OF CONTENTS
111.04.01. General.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
A. All sanitary sewer treatment facilities shall be designed and constructed in accordance with the latest edition of "Rule and Regulations for Water Quality Control" from the Georgia Department of Natural Resources, Environmental Protection Division and the requirements of "The Ten States Standards." Where requirements conflict, the more restrictive of the requirements shall govern.
B. Representatives from the City of Canton Engineering Department shall have the right to review and modify the design of the treatment facility if the modifications are in the best interest of the city. Any revisions to the design made during construction must be approved by the city.
C. All reports, studies, plans and specifications submitted to the city must carry the seal of a professional engineer competent in the design of wastewater treatment facilities in the State of Georgia.
History
(Ord. No. 2014-18, § 2, 8-21-2014)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.