Skip to content
Georgia Commons
Menu

Carrollton · Zoning Ordinance

Appendix B - ZONING (RESERVED) / Article 6 - INFRASTRUCTURE IMPROVEMENTS

6.05.03. Approval of Installation

About this text

  • As published by Municode, current through 2025-11-03
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

As to new installation, no public utility shall install any lines, wires, pipes or poles, or otherwise utilize a public right-of-way until after obtaining prior written approval from the City Engineer respecting the proposed location of said lines, wires, pipes, etc., in accordance with these regulations. The City Engineer shall determine if the installed location and placement of any utility along a public right-of-way meets the requirements of this Section and the Design and Construction Standards (see Section 6.05.02). The City Engineer shall then issue a written approval or disapproval to the public utility regarding the installation. Any installation made by any utility in a location other than that specified in this Section shall be removed and reinstalled in the proper location entirely at the expense of the utility. Failure to reinstall at the proper location will result in the withholding of any further installation permits. Failure to conform to this Section or the permit will result in the withholding of any further installation permits.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:carrollton/zoning/6.05.03@2025-11-03-e617722572

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Carrollton Zoning Ordinance, 6.05.03. Approval of Installation | Georgia Commons