Ir al contenido
Georgia Commons
Menú

Carrollton · Ordenanza de zonificación

Appendix B - ZONING (RESERVED) / Article 6 - INFRASTRUCTURE IMPROVEMENTS

6.05.03. Approval of Installation

Sobre este texto

  • As published by Municode, current through 2025-11-03
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

As to new installation, no public utility shall install any lines, wires, pipes or poles, or otherwise utilize a public right-of-way until after obtaining prior written approval from the City Engineer respecting the proposed location of said lines, wires, pipes, etc., in accordance with these regulations. The City Engineer shall determine if the installed location and placement of any utility along a public right-of-way meets the requirements of this Section and the Design and Construction Standards (see Section 6.05.02). The City Engineer shall then issue a written approval or disapproval to the public utility regarding the installation. Any installation made by any utility in a location other than that specified in this Section shall be removed and reinstalled in the proper location entirely at the expense of the utility. Failure to reinstall at the proper location will result in the withholding of any further installation permits. Failure to conform to this Section or the permit will result in the withholding of any further installation permits.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:carrollton/zoning/6.05.03@2025-11-03-e617722572

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Carrollton Zoning Ordinance, 6.05.03. Approval of Installation | Georgia Commons