Skip to content
Georgia Commons
Menu

Carrollton · Zoning Ordinance

Appendix B - ZONING (RESERVED) / Article 6 - INFRASTRUCTURE IMPROVEMENTS

6.10.06. Commercial/Industrial Subdivision Entrances

About this text

  • As published by Municode, current through 2025-11-03
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. A deceleration lane shall be installed at all entrance roads into a commercial or industrial subdivision. See Section 6.11.00 below.

B. The City Engineer may require a traffic study to determine if the project's size warrants a center turn lane, longer deceleration lane, an acceleration lane or other improvements. If the traffic study determines that the traffic generated by the project warrants it, the City Engineer will require the additional improvements or other mitigating measures.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:carrollton/zoning/6.10.06@2025-11-03-d3b03c0b01

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Carrollton Zoning Ordinance, 6.10.06. Commercial/Industrial Subdivision Entrances | Georgia Commons