Ir al contenido
Georgia Commons
Menú

Carrollton · Ordenanza de zonificación

Appendix B - ZONING (RESERVED) / Article 6 - INFRASTRUCTURE IMPROVEMENTS

6.10.06. Commercial/Industrial Subdivision Entrances

Sobre este texto

  • As published by Municode, current through 2025-11-03
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A. A deceleration lane shall be installed at all entrance roads into a commercial or industrial subdivision. See Section 6.11.00 below.

B. The City Engineer may require a traffic study to determine if the project's size warrants a center turn lane, longer deceleration lane, an acceleration lane or other improvements. If the traffic study determines that the traffic generated by the project warrants it, the City Engineer will require the additional improvements or other mitigating measures.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:carrollton/zoning/6.10.06@2025-11-03-d3b03c0b01

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Carrollton Zoning Ordinance, 6.10.06. Commercial/Industrial Subdivision Entrances | Georgia Commons