Skip to content
Georgia Commons
Menu

Coffee County · Zoning Ordinance

Appendix D - LAND DEVELOPMENT CODE / Chapter 10 - ADMINISTRATIVE PROVISIONS

10-11. Submittal Requirements for Site Development Plans.

About this text

  • As published by Municode, current through 2024-10-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

a. An optional development plan may be submitted to save the applicant time and eliminate any unnecessary financial expenditures which result from changes in site development identified after the submission of fully engineered architectural plans to the Code Enforcement. Development plans, in the form of at least a one page Site plan, may be submitted for all non-residential development. An application for site development plan approval shall contain all of the applicable information set forth in section 10-1 and may be required to contain the following additional information:

(1) A site development plan that demonstrates compliance with all design standards required for development in the zoning district in which the use is proposed. Such standards are set forth in chapter 4.

b. Where a Planned Development is proposed, a site development plan shall be provided that demonstrates compliance with the standards set forth in chapter 4, section 4-8.

c. When a proposed development contains one or more uses that are subject to supplemental standards, a site development plan shall be provided that demonstrates compliance with all design standards for the specified use or uses, as set forth in chapter 4.

d. All site development plans shall contain details for proposed Accessory uses and shall demonstrate compliance with the standards for such uses.

e. The following specific information shall be provided:

(1) Proposed density (both gross and net).

(2) Location of all buildings and structures, showing setback lines, building orientation, and building height.

(3) For mixed use projects, drawing notes shall include a table summarizing the total amount of development in each use, the percentage of the total site, net density of proposed residential development.

(4) The location of all utility lines, utility easements, access easements and other easements.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:coffee-county/zoning/10-11@2024-10-07-f7ba018588

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Coffee County Zoning Ordinance, 10-11. Submittal Requirements for Site Development Plans | Georgia Commons