Skip to content
Georgia Commons
Menu

Colquitt County · Zoning Ordinance

Appendix A - ZONING ORDINANCE / Article XXI - ENFORCEMENT OF THE ZONING ORDINANCE

Section 21.02a. Required permits.

About this text

  • As published by Municode, current through 2025-02-04
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

1. It shall be unlawful for any person to commence excavation for, or to commence construction of, any building or structure without first obtaining a building permit from the building

official. A building permit is also required to physically move any existing building.

2. Plumbing, electrical, drainage and other permits shall not be issued until the building official has determined that the plans and designated use indicate that the structure and premises, if constructed as planned and proposed, will conform to the provisions of this ordinance.

3. A building permit is required for any change in the use of an existing building or structure to a different classification of type of use.

History

The history line the source prints at the end of the section.

(Ord. No. 2006-5, § 1, 10-24-06)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:colquitt-county/zoning/21.02a@2025-02-04-75805a33cb

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Colquitt County Zoning Ordinance, Section 21.02a. Required permits | Georgia Commons