Colquitt County · Ordenanza de zonificación
Appendix A - ZONING ORDINANCE / Article XXI - ENFORCEMENT OF THE ZONING ORDINANCE
Section 21.02a. Required permits.
Sobre este texto
- As published by Municode, current through 2025-02-04
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
1. It shall be unlawful for any person to commence excavation for, or to commence construction of, any building or structure without first obtaining a building permit from the building
official. A building permit is also required to physically move any existing building.
2. Plumbing, electrical, drainage and other permits shall not be issued until the building official has determined that the plans and designated use indicate that the structure and premises, if constructed as planned and proposed, will conform to the provisions of this ordinance.
3. A building permit is required for any change in the use of an existing building or structure to a different classification of type of use.
Historia
(Ord. No. 2006-5, § 1, 10-24-06)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.