Colquitt · Zoning Ordinance
Appendix A - ZONING / Article III - GENERAL PROVISIONS
Section 3.23. Storm water control.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
The Planning Commission shall review and approve an architectural storm water drainage plan for all classes of construction and property development prior to permits being issued by the building inspector. This plan must show retention of surface waters, controlled release into the Colquitt storm water drainage system, and diversion of any existing drainage pattern that may affect adjoining properties. Watershed into the drainage system cannot exceed predevelopment flow rates. The developer must bear the costs of controlling their storm water. Whenever possible, water will be channeled into underground storm sewers.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.