Skip to content
Georgia Commons
Menu

Columbus · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Chapter 7 - PROJECT DESIGN STANDARDS / Article 12 - STORM DRAINAGE

Section 7.12.12. Driveway Culverts.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. Culvert Required. Driveway pipe shall be sized for the 25-year storm event.

B. Pipe Materials. Driveway culverts may be PVC, Reinforced Concrete Pipe or High Density Polyethylene (smooth lined type "S").

C. Inlets and Outlets. The inlet and outlet end of all driveway culverts shall have either flared-end sections or concrete headwalls that meet the standards of Georgia DOT.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:columbus-muscogee/zoning/7.12.12@2026-11-11-b0f227706d

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Columbus Zoning Ordinance, Section 7.12.12. Driveway Culverts | Georgia Commons