Columbus · Zoning Ordinance
Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Chapter 7 - PROJECT DESIGN STANDARDS / Article 12 - STORM DRAINAGE
Section 7.12.11. Minimum Clearances.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
A. Culverts. At least two feet between the bottom of the base or sub-base, if used, and the exterior crown of the culvert (top of pipe) is required under the roadway.
B. Pipes in Easements. Pipes included in easements shall have a minimum cover of one foot or at the manufacturers' recommendations.
C. Underground Utilities. A minimum of six inches of cover shall be provided between underground utilities and exterior crown of culverts.
D. Trench Construction. Trench construction for storm drainage pipe shall be in accordance with
DOT.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.