Skip to content
Georgia Commons
Menu

Columbus · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Chapter 7 - PROJECT DESIGN STANDARDS / Article 12 - STORM DRAINAGE

Section 7.12.11. Minimum Clearances.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. Culverts. At least two feet between the bottom of the base or sub-base, if used, and the exterior crown of the culvert (top of pipe) is required under the roadway.

B. Pipes in Easements. Pipes included in easements shall have a minimum cover of one foot or at the manufacturers' recommendations.

C. Underground Utilities. A minimum of six inches of cover shall be provided between underground utilities and exterior crown of culverts.

D. Trench Construction. Trench construction for storm drainage pipe shall be in accordance with

DOT.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:columbus-muscogee/zoning/7.12.11@2026-11-11-c4bf05b2cb

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Columbus Zoning Ordinance, Section 7.12.11. Minimum Clearances | Georgia Commons