Columbus · Ordenanza de zonificación
Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Chapter 7 - PROJECT DESIGN STANDARDS / Article 12 - STORM DRAINAGE
Section 7.12.11. Minimum Clearances.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A. Culverts. At least two feet between the bottom of the base or sub-base, if used, and the exterior crown of the culvert (top of pipe) is required under the roadway.
B. Pipes in Easements. Pipes included in easements shall have a minimum cover of one foot or at the manufacturers' recommendations.
C. Underground Utilities. A minimum of six inches of cover shall be provided between underground utilities and exterior crown of culverts.
D. Trench Construction. Trench construction for storm drainage pipe shall be in accordance with
DOT.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.