Skip to content
Georgia Commons
Menu

Columbus · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Chapter 7 - PROJECT DESIGN STANDARDS / Article 9 - DRIVEWAY AND DEVELOPMENT ENTRANCES

Section 7.9.4. Commercial/Industrial Subdivision Entrances.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. Deceleration Lanes Required. A deceleration lanes shall be installed at all entrance roads into a commercial or industrial subdivision.

B. Traffic Impact Study.

1. Study May be Required. The Director of Engineering may require a traffic study to determine if the project's size warrants a center turn lane, longer deceleration lane, an acceleration lane or other improvements.

2. Required Improvements. If the traffic study determines that further steps or improvements should be taken to protect the traveling public, the Director of Engineering will impose the additional requirements.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:columbus-muscogee/zoning/7.9.4@2026-11-11-2286723a30

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Columbus Zoning Ordinance, Section 7.9.4. Commercial/Industrial Subdivision Entrances | Georgia Commons