Skip to content
Georgia Commons
Menu

Cordele · Zoning Ordinance

Appendix A - ZONING / Article V - UTILITIES

Section 5.2. Easements.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Permanent easements for public water, sanitary sewer and natural gas facilities shall be dedicated to the City. The minimum width permanent easements for a single utility shall be 20 feet. Where more than one utility has a common easement, the minimum easement width shall be increased by 10 feet for each additional utility. Before dedication, the developer shall grass and stabilize all disturbed areas within and adjacent to easements which are not covered by paving or other improvements. An acceptable stand of grass free of eroded or bare areas as defined in paragraph 4.lO(e) of these Regulations must be achieved before the City will consider dedication.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:cordele/zoning/5.2@2026-11-11-e3c6988c2c

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Cordele Zoning Ordinance, Section 5.2. Easements | Georgia Commons