Skip to content
Georgia Commons
Menu

Cordele · Zoning Ordinance

Appendix A - ZONING / Article VII - REQUIRED IMPROVEMENTS

Section 700. General.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Except as provided in Section 430.4 (Final Plat Approval), every subdivider shall be required to have installed the street improvements and utilities required by this Article prior to the approval of the Final Plat.

700.1 Standards. All required street improvements, utilities and monuments shall be built to standards specified by the agency responsible for each. All utilities to be installed in the streets and/or alleys shall be placed, the pipe properly bedded and the soil compacted to City standards prior to paving completion.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:cordele/zoning/appendix-a-article-vii-700@2026-11-11-b3f86c5585

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Cordele Zoning Ordinance, Section 700 (Appendix A, Article VII). General | Georgia Commons