Cumming · Zoning Ordinance
Part II - CODE OF ORDINANCES / Part B - PLANNING, ZONING, DEVELOPMENT AND UTILITIES / Chapter 109 - SUBDIVISION AND LAND DEVELOPMENT REGULATIONS AND CONSTRUCTION SPECIFICATIONS / Article V - STORM DRAINAGE AND WATERSHED PROTECTION
Sec. 109-368. Stormwater management facility easements, nonresidential.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
The property owner shall execute a 20-foot drainage easement surrounding the entire perimeter of the facility in favor of the city to allow the city to inspect and observe the facility as necessary. The easement boundary will be measured
from the 100-year stormwater ponding limits or six inches above the elevation of the overflow. The property owner shall additionally grant permission to the city, its authorized agents and employees, to enter upon the property and to inspect the facilities whenever the city deems necessary. The
city maintains the right to make emergency repairs to the facility as deemed necessary. No obstruction shall be built, constructed or planted that would inhibit proper function of the facility and its associated drainage systems.
History
(Ord. of 3-16-2004(02), § III(10.13))
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.