Sec. 109-370. Acceptance of residential systems.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Stormwater management facilities that have been constructed in accordance with the approved plans will be inspected at the time of final platting, and a punch list will be provided at that time. Prior to final plat approval, the following

items must be completed:

(1) All punch list items must be properly addressed.

(2) After construction and before approval of the final plat, the designer shall submit a certified field run topographic map of the detention area and a revised hydrology study using the as-built topographic map.

The topographic map of the stormwater management facility should include the state plane coordinates and mean sea level elevations of applicable outfalls, silt gauges, and survey markers. The as-built will be submitted in electronic form and hard-copy form to the city planning and zoning department.

(3) The designer shall certify that the facility is working as it was designed and that the required detention storage and outflow rates are being provided.

(4) The stormwater management facility will be bonded.

(5) All accumulations of silt need to be removed so that the grade of the bottom of the pond is at the design grade. The silt

gauge should read zero upon completion.

(b) Subsequently, the facilities will be inspected prior to release of bonds. At that time, any deficiencies in the facility will be noted in the

45-day letter. The following items must be completed:

(1) All deficiencies noted on the 45-day letter must be properly addressed.

(2) All accumulations of silt need to be removed so that the grade of the bottom of the pond is at the design grade. The silt

gauge should read zero upon completion.

(3) The entire stormwater management facility needs to be stabilized with permanent vegetation as shown on the approved plans.

History

The history line the source prints at the end of the section.

(Ord. of 3-16-2004(02), § III(10.15))

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:cumming/zoning/109-370@2026-11-11-95444d40fa

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Cumming Zoning Ordinance, Sec. 109-370. Acceptance of residential systems | Georgia Commons