Ir al contenido
Georgia Commons
Menú

Cumming · Ordenanza de zonificación

Part II - CODE OF ORDINANCES / Part B - PLANNING, ZONING, DEVELOPMENT AND UTILITIES / Chapter 109 - SUBDIVISION AND LAND DEVELOPMENT REGULATIONS AND CONSTRUCTION SPECIFICATIONS / Article V - STORM DRAINAGE AND WATERSHED PROTECTION

Sec. 109-370. Acceptance of residential systems.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Stormwater management facilities that have been constructed in accordance with the approved plans will be inspected at the time of final platting, and a punch list will be provided at that time. Prior to final plat approval, the following

items must be completed:

(1) All punch list items must be properly addressed.

(2) After construction and before approval of the final plat, the designer shall submit a certified field run topographic map of the detention area and a revised hydrology study using the as-built topographic map.

The topographic map of the stormwater management facility should include the state plane coordinates and mean sea level elevations of applicable outfalls, silt gauges, and survey markers. The as-built will be submitted in electronic form and hard-copy form to the city planning and zoning department.

(3) The designer shall certify that the facility is working as it was designed and that the required detention storage and outflow rates are being provided.

(4) The stormwater management facility will be bonded.

(5) All accumulations of silt need to be removed so that the grade of the bottom of the pond is at the design grade. The silt

gauge should read zero upon completion.

(b) Subsequently, the facilities will be inspected prior to release of bonds. At that time, any deficiencies in the facility will be noted in the

45-day letter. The following items must be completed:

(1) All deficiencies noted on the 45-day letter must be properly addressed.

(2) All accumulations of silt need to be removed so that the grade of the bottom of the pond is at the design grade. The silt

gauge should read zero upon completion.

(3) The entire stormwater management facility needs to be stabilized with permanent vegetation as shown on the approved plans.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 3-16-2004(02), § III(10.15))

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:cumming/zoning/109-370@2026-11-11-95444d40fa

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.