A. Extent and thickness of pavement. Areas to paved together with their dimensions shall be as indicated on the plans.
Thicknesses shall not be subject to a minimum tolerance of one-half inch. Overlay pours will not be permitted.
B. Preparation of subgrade. The subgrade for miscellaneous concrete shall be finished to line and grade as indicated on the plans and compacted to the same degree
as the portion of the roadway on which it is placed. For contracts involving both roadway and bridge contractors, the grading for the slope paving shall be completed by the roadway contractor. Final grading, compacting, dressing, placing and
maintaining until structures are completed shall be the responsibility of the bridge contractor. Responsibility for each
portion of the work shall be as noted on the plans.
Where paving is to be placed on front slopes of ditches and shoulders, any special materials required shall be placed during the appropriate roadway construction.
Excavation for toe walls, edge walls, weep hole drain pockets, placing of coarse aggregate in weep hole drain pockets, and all grading, finishing and compacting of the subgrade surface shall be accomplished prior to placing concrete. Mechanical tamps may be required to secure satisfactory compaction.
Excavation for velocity dissipators, spillways, and slope drains shall not be carried below the foundation elevation nor wider than necessary to provide working
space or to remove soft unsuitable material and backfill with selected material.
Where spillways are to be fitted to concrete pavement, the specified dowel bars shall set into pavement when it is laid.
Metal parting strips may be used to hold the ends of dowels bent into the grooves.
C. Forms. Forms may be of nominal dimension wood or metal and shall be approved by the engineer. All forms shall be straight
and oiled prior to each use.
Divider plates and templates shall be of metal.
Items which lend themselves to the slip form method of placement may be so constructed. The engineer, however, reAPPENDIX C—ROADWAY AND SUBDIVISION SPECIFICATIONS Art.
serves the right to require the use of fixed forms in the event the slip form method fails to produce a product which conforms to the requirements for quality, shape, grade, or alignment.
D. Weep holes. Weep hole drain pockets filled with coarse aggregate together with weep hole drain pipe or formed openings shall be provided in accordance with plan details.
E. Concrete.
1. Mixing. The mixing of Class "B" concrete shall be as specified.
a. Small capacity job-site batchers and one bag mixers may be used.
b. Concrete ingredients may be proportioned volumetrically provided the equipment, calibration and operation of the equipment are approved by the engineer.
2. Placing and finishing. Concrete shall not be placed on a muddy or frozen surface. It shall be deposited within forms or against other pavements on a compacted and wetted subgrade to the depth required to produce the specified thickness. It shall be struck off to a plane surface and finished.
a. Concrete slope paving. Shall be given a final finish with a stiff broom. With the engineer's approval, concrete may be mechanically conveyed to the forms.
b. Concrete sidewalks. Shall be given a Type V finish, except for the final finish, when so indicated on the plans, shall be made by stiff-bristle brooming.
The surface shall be tested with a ten foot straightedge laid parallel to the centerline. Any irregularities in excess of 14 inch in ten feet shall be eliminated
while the concrete is still plastic.
c. Concrete paved ditches. The surface of the bottom and sides of paved ditches shall be uniform
in appearance and true to grade and cross-section. On straightgrade tangents there shall be no deviation of more than one
inch in ten feet, zero inches when tested with a ten-foot straightedge. The one inch in ten feet, zero inches tolerance will not be permissible if it reduces the thickness of the ditch paving, ponds water, or alters
the direction of flow.
Finish for ditch paving shall be accomplished by floating with wood floats sufficiently to bring mortar to the surface in the amount necessary to cover the coarse aggregate.
Reinforcing if required, shall conform to plan details.
d. Concrete curbs, gutters, and medians. Shall be finished in accordance with "c" above. Face forms shall be removed as soon
as possible and the exposed surfaces finished with a wood float.
Straightedging, done along the edge of the gutter and top of the curb and median shall conform to those requirements for the adjacent pavement, but with no irregularities to exceed onefourth inch in ten feet.
Machine methods of placing may be used providing the end result is satisfactory.
3. Joints.
a. Slope paving. Placing may be done in either horizontal or vertical courses, but not a mixture of both. Horizontal courses shall
be approximately level, and not less than three nor more than six feet in width measured along the slope. Trapezoidal courses at the top and bottom will be permitted to accommodate sloping berm and ditch line conditions. At construction joints between courses, the paving shall be edged with a tool having
one-fourth inch radius.
Vertical contraction or construction joints spaced along the horizontal course at right angles to the horizontal construction joints shall be provided at approximately 40 foot intervals, in line and not staggered.
No other vertical lines will be required in horizontal courses.
When vertical contraction joints are used, they shall be cut with a single tool one-third the depth of the paving during the finishing operation and shall be edged the same as construction joints.
Vertical courses shall be approximately equal, and course widths shall not be less than
three nor more than five feet measured across the plane of the slope. The width would preferably be four feet. No horizontal lines will be required in vertical courses.
Slope paving shall be separated from masonry of structures, sidewalks, curbs and rigid type roadway pavement by preformed joint filler having a thickness of one-half inch.
b. Concrete paved ditches.
1. Contraction joints shall be spaced at 30 foot intervals.
2. Expansion joints shall be placed only where the paved ditch joins the roadway pavement or some other structure.
3. Joint sealers will not be required for either expansion or contraction joints.
c. Concrete sidewalk. Transverse contraction joints shall be formed with a tool designed to form a groove one-third the depth of the sidewalk at intervals as indicated on standard plans. Where sidewalks abut
curb and gutter, alternate joins shall coincide. All edges shall be rounded with a one-fourth inch edger. Expansion joints shall be of the materials, dimensions, and at locations specified on the plans.
d. Concrete curbs, gutters and medians.
1. Contraction joints. Adjacent to concrete paving, the spacing of joints in curb and gutters and medians shall be arranged to coincide with the joint spacing in paving. Joints may be formed by metal divider plates or sawed. The depth of the joint shall be not less than one-fifth nor more than one-fourth the depth of the concrete. With the exception of sawed joints, all joints shall be finished with a one-fourth inch edging tool. For curbs, gutters and medians adjacent to pavement other than concrete, contraction joints shall be as follows:
a. For header curb and combination curb and gutter: Install a contraction joint at a maximum spacing of 20 feet.
b. For gutter and median: Install a contraction joint at a maximum spacing of
20 feet.
2. Expansion joints. Expansion joints shall be formed in accordance with plan details or as directed. They shall coincide with the expansion joints in the adjoining pavement or gutter. All joint filters shall be cut to the same crosssection as the construction. Any material protruding after the concrete is finished shall be trimmed
flush.
When these items are not adjacent to concrete construction, expansion joints shall be provided at a minimum interval of 500 feet.
3. Curing. Any method of curing specified. Membrane curing compound, if used, shall be Type 2. Honeycombed areas shall be packed as soon as forms are removed.
F. Backfilling. The areas shall be satisfactorily backfilled as soon as the work will not be damaged.
G. Clean-up. When all concrete work has been completed, the surfaces shall be cleaned and brought to a uniform appearance. The work shall be protected from staining or other damage until final acceptance.