Cusseta-Chattahoochee County unified government · Zoning Ordinance
Appendix C. ROADWAY AND SUBDIVISION SPECIFICATIONS
70 sections
Search the Cusseta-Chattahoochee County unified government codes
Contents
- Appendix C. ROADWAY AND SUBDIVISION SPECIFICATIONS
- Sec. 7 (Appendix C). Graded aggregate base
- Appendix C. ROADWAY AND SUBDIVISION SPECIFICATIONS
- Sec. 20. Backfill materials
- Sec. 26. Steel pipe
- Appendix C (no. 3 so numbered). ROADWAY AND SUBDIVISION SPECIFICATIONS
- 1.01. Description
- 1.02 (Appendix C). Materials
- 1.03. Installation
- 1.04. Maintenance and removal. The contractor
- 2.01. Description
- 2.02 (Appendix C). Construction
- Sec. 3 (Appendix C). Roadway excavation
- 3.04. Unsuitable material excavation. When the
- 4.01. Description
- 4.03. Construction
- 5.01. Description
- 5.02. Materials
- Section 20.01
- Section 20.02
- 5.03. Locations and elevations. The locations
- 5.04. Excavation
- 5.05. Backfill
- 6.01. Description
- 6.02 (Appendix C). Materials
- 6.03 (Appendix C). Construction
- 7.01. Description
- 7.02. Materials
- 7.03 (Appendix C). Construction
- 11.01. Description
- 11.03. Equipment
- 11.04 (Appendix C). Construction
- 12.01. Description
- 12.02. Materials
- 12.03. Equipment
- 12.04 (Appendix C). Construction
- 13.01. Description
- 13.02 (Appendix C). Material
- 13.03. Construction
- 14.01. Description
- 14.02. Materials
- 14.03 (Appendix C). Classes and uses of concrete
- 14.04 (Appendix C). Quality of concrete
- 15.01. Description
- 15.02 (Appendix C). Materials
- 15.03 (Appendix C). Construction
- 16.01. Description
- 16.02. Materials
- Sec. 17 (Appendix C). Jacking or boring pit
- Sec. 18 (Appendix C). Coarse aggregate
- 20.01 (Appendix C). Foundation backfill, Type I. Type I backfill
- 20.02 (Appendix C). Foundation backfill, Type II. Type II
- 20.03. Imperfect trench backfill, Type III. Type
- Sec. 22. Hot mix asphaltic concrete mixtures
- 23.01. Portland cement
- 23.02. Portland blast - furnace slag cement
- 24.01. Air entraining admixtures. Materials for
- 24.03. Fly ash
- 25.01. Reinforced concrete pipe. Reinforced pipe
- 25.02. Nonreinforced concrete pipe
- 26.01. Corrugated steel culvert pipe and pipe
- 28.01. Flanges for cast iron pipe and fittings
- 28.02. Sewer joint sealing compound. This hot
- 28.03. Resilient clay pipe joints. These jointing
- 28.04 (Appendix C). Rubber type gasket joints
- Sec. 29
- 29.01. Description
- 29.02 (Appendix C). Materials
- 29.03 (Appendix C). Manufacture
- Sec. 30. Grassing