Cusseta-Chattahoochee County unified government · Zoning Ordinance
Appendix C - ROADWAY AND SUBDIVISION SPECIFICATIONS
6.03. Construction.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
A. Subgrade construction. The entire surface of the in-place subgrade shall be plowed, harrowed and mixed to a depth of at least six inches. After the material has been thoroughly mixed, the subgrade shall be brought to plan line and grade and compacted to 100 percent of the maximum laboratory dry density unless the subgrade
is to be stabilized, in which case the density requirement will not apply at this stage; or unless a subsequent Contract provides for base construction. In the latter case, mixing will be eliminated and the in-place subgrade compacted to 95
percent of the laboratory maximum dry density.
Prior to placing any subsequent layers of base and paving materials, the subgrade shall have sufficient stability to support construction equipment without excessive movement regardless of compaction. Areas of subgrade that are unstable shall be reworked to a moisture content that will
provide stability and compaction.
The surface of the completed Subgrade shall be bladed to a smooth and uniform texture. The centerline profile shall conform to the established elevations with an acceptable tolerance of +- 1/2 inch. The
acceptable tolerance under a template conforming to the designated cross-section shall be +- 1/4 inch.
The maximum dry density and the test methods shall be in accordance with section 6.03 A.
Sec. 7. Graded aggregate base.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.