Appendix C - ROADWAY AND SUBDIVISION SPECIFICATIONS

Sec. 17. Jacking or boring pit.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Corrugated metal pipe...Section 15 Concrete pipe...Section 15 Steel pipe...AWWA Cast iron pipe...AWWA Ductile iron pipe (plain ends)...AWWA

17.03 Construction.

A. Jacking.

1. When required, suitable pits or trenches shall be excavated for the jacking operation and for placing the end joints of pipe. Where necessary, they shall be securely sheeted and braced to prevent caving.

2. Where pipe is required to be installed under railroads, highways, streets or other facilities by jacking

or boring methods, construction shall be done in a manner that will not interfere with the operation of the facility, and shall not weaken the roadbed or structure.

3. Jacks for forcing the pipe through the roadbed shall have a jacking head constructed in such a manner as to apply uniform pressure around the ring of the pipe. The pipe to be jacked shall be set on guides, braced together, to properly support the section of the pipe and direct it to the proper line and grade. In general,

roadbed material shall be excavated just ahead of the pipe, the excavated material removed through the pipe, and the pipe then forced through the roadbed into the excavated space.

4. The contractor shall furnish for the engineer's approval, a plan showing his proposed method of handling, including the design for the jacking head, jacking support or back stop, arrangement and position of jacks, pipe guides, etc., complete as assembled. If the contractor elects to weld steel pipe or ductile pipe as a casing

and carrier, he shall furnish to the state materials and research engineer in writing an acceptable welding procedure. This will consist of joint details, preheat temperature

and electrodes to be used. The use of welded steel pipe as a sanitary sewer carrier will not be permitted.

5. The diameter of the excavation shall conform to the outside diameter an circumference of the pipe as closely as practicable. Any voids which develop during the installation operation and which are determined by the engineer to be detrimental to the

work, shall be pressure grouted with an approved mix.

6. The distance that the excavation extends beyond the end of the pipe will depend upon the character of the

excavated material, but shall not exceed two feet in any case. This distance shall be decreased on instructions from the engineer if the character of the material being excavated makes it desirable.

7. The pipe shall be jacked from the low or downstream end. Variation in the final position of the pipe from the line and grade established by the engineer will be permitted only to the extent of two percent in lateral alignment, and one percent in vertical grade, providing that the final grade of flow line shall be in the

direction indicated on the plans.

8. If the contractor desires, he may use a cutting edge around the head end and extending a short distance beyond the pipe end, with inside angles or lugs to keep the cutting edge from slipping back into the pipe.

9. When jacking of pipe is once begun, the operation shall be carried on without interruption, insofar as practicable, to prevent the pipe from becoming firmly set in the embankment.

10. Any pipe damaged in jacking operations shall be removed and replaced by the Contractor at his expense.

11. The pits or trenches excavated to facilitate jacking operations shall be backfilled immediately after the jacking has been completed.

B. Boring. The boring shall proceed from a pit provided for the boring equipment and workmen. Excavation for pits and installation of shoring shall be outlined as above.

The location of the pit shall meet the approval of the engineer. The holes are to be bored mechanically. The boring may be done using a pilot approximately two inches in diameter which shall be bored the entire length of the installation and shall be checked for line and grade on the opposite end of the bore from the work pit.

This pilot hole shall serve as the centerline of the larger diameter hole to be bored.

Excavated material will be placed near the top of the working pit and disposed of as required. The use of water or other fluids in connection with the boring operation will be permitted only to the extent necessary to lubricate cuttings. Jetting

will not be permitted.

1. Allowable variation from line and grade shall be as specified under jacking. The diameter of the excavation shall conform to the outside diameter of the pipe as closely as

practicable. Any voids which develop during installation operation and are determined by the engineer to be detrimental to the work, shall be pressure grouted with an approved mix.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:cusseta-chattahoochee/zoning/appendix-c-17@2026-11-11-9d851361e6

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Cusseta-Chattahoochee County unified government Zoning Ordinance, Sec. 17 (Appendix C). Jacking or boring pit | Georgia Commons