Skip to content
Georgia Commons
Menu

Cusseta-Chattahoochee County unified government · Zoning Ordinance

Appendix C - ROADWAY AND SUBDIVISION SPECIFICATIONS

3.04. Unsuitable material excavation. When the

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

engineer determines that the existing material is undesirable in its location or condition, the engineer may require the contractor to remove the undesirable material and backfill with approved

material, properly compacted. In cut areas where the material in place is not suitable for subgrades or shoulders, it shall be undercut to the depth established by the engineer and the undercut area backfilled with suitable material. In roadway cuts any stripping excavation of unsuitable material shall be done and the material disposed

of as directed by the engineer.

Sec. 4. Borrow excavation.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:cusseta-chattahoochee/zoning/3.04@2026-11-11-6ec495f1e3

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Cusseta-Chattahoochee County unified government Zoning Ordinance, 3.04. Unsuitable material excavation. When the | Georgia Commons