Dacula · Zoning Ordinance
Article XIII - ADMINISTRATION, ENFORCEMENT, PENALTIES AND REMEDIES
Section 1301. Building Permit Required.
About this text
- As posted on the city's website, retrieved 2026-11-25
No building or other structure shall be erected, moved, added to or structurally altered without a Building Permit issued by the City Administrator or his/her designee. No Building Permit shall be issued except in conformance with the provisions of this Resolution and the current building code. Building permit placards issued by the City shall be kept onsite in a visible location. Building permits shall be valid for no longer than 12-months after the date of issuance. One or more extensions of time, for periods not more than 90 days each, may be allowed for the permit. The extension must be
requested in writing prior to the expiration of the existing permit and justifiable cause must be demonstrated. Extensions that are granted must be in writing by the City Administrator or his / her designee. The permit may be re-issued only upon completion of the application procedure outlined in Sections 1303 of this Resolution.
All applications for Land Disturbance Permits, and Building Permits for uses other than one-family and duplex dwellings shall be accompanied by plans, drawn to scale, showing the actual dimensions of the lot to be built upon, the sizes and the locations on the lot of any existing buildings or structures, the shape, size, height, use and the location on the lot of the building or structure to be erected, moved, added to or structurally altered and such other information as may be necessary to provide for the enforcement of this Resolution. These applications and plans shall conform to the requirements of the Development Regulations of the City of Dacula.
Read this code where it is posted (city website) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.