Douglasville · Code of Ordinances
Part II - CODE / Chapter 90 - VEHICLES FOR HIRE / Article 10 - PLANS AND PERMITS
Sec. 10.07. Land disturbance permit.
About this text
- As published by Municode, current through 2024-12-16
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
A. Responsibility for development actions.
1. No person shall conduct any land-disturbing activity, including grading, clearing and grubbing, tree clearance, land development or project construction without first obtaining a land disturbance permit from the community development department or its designee to perform such activity. Such permit shall be on a form as provided by the city and shall include all information as identified in this subsection. The application shall be authorized by the property owner.
2. The community development department or its designee is responsible for administering the review and approval process for issuance of land disturbance permits. The department shall forward a copy of the land disturbance permit application, including the civil design and constructions drawings for the project, to other departments, the Soil and Water Conservation Commission District, the Georgia Department of Transportation or others as appropriate, for their review and comment. The comments shall be sent to the applicant for resolution, and the community development department or its designee shall issue the land disturbance permit when all requirements of this UDO are met.
3. Approval of plans by the community development department or its designee shall not imply or transfer acceptance of responsibility for the application of the principles of engineering, architecture, landscape architecture or any other profession, from the professional, corporation or individual under whose hand or supervision the plans were prepared.
4. [Reserved.]
5. The completion of inspections and authorization for work continuation shall not transfer responsibility for the quality of the work performed or materials used from the owner, nor imply or transfer acceptance of responsibility for project design or engineering from the professional, corporation or individual under whose hand or supervision the plans were prepared.
6. No land disturbance permit shall be interpreted to relieve any owner of the responsibility of maintaining full compliance with all applicable codes, ordinances and other regulations. Any land disturbance permit issued in error or in contradiction to the provisions of this UDO shall be considered to have been null and void upon its issuance.
7. Liability.
a. The approval of an erosion and sedimentation control plan or other plans under the provisions of this development code, the issuance of a land disturbance permit, or the compliance with any other provisions of this UDO shall not relieve any person from the responsibility for damage to any person or property otherwise imposed by law nor impose any liability upon the mayor and city council or the soil and water conservation district for damage to any person or property.
b. The fact that any activity for which a land disturbance permit has been issued results in injury to the property of another shall neither constitute proof of, nor create a presumption of, a violation of the standards provided for in this UDO or the terms of the land disturbance permit.
B. Development activities authorized. A land disturbance permit shall be issued to authorize all activities associated with development activity regulated by this Code, subsequent to the issuance of a soil disturbance permit, including, but not limited to, the construction of such improvements as streets, surface parking areas and drives, stormwater drainage facilities, sidewalks, or other structures permanently placed on or in the property except for buildings, signs, or other structures requiring the issuance of a building permit or other type of permit as required by this unified development ordinance.
C. Process for approval of land disturbance permit. An application for a land disturbance permit may proceed simultaneously with an application for a preliminary subdivision plat or site plan but may not be issued prior to project approval of such plat or plan by the community development department or its designee.
1. The application for a land disturbance permit shall be submitted to the community development department or its designee and must include the following:
a. Application on the form furnished by the department, requesting review for issuance of a land disturbance permit.
b. Three hard copies and one digital submittal copy of:
1) The preliminary plat or site plan requesting or reflecting project approval;
and
2) The civil design and construction drawings prepared in conformance with the specifications and standards in this development code.
c. Payment of any land disturbance permit fee, as established from time to time by the mayor and city council.
2. The application will be checked for completeness within 15 business days of its submission. Incomplete applications, as determined in the sole discretion of the community development director or his/her designee, will be returned to the applicant.
3. Upon acceptance of a land disturbance permit application, the community development department or its designee shall refer the soil erosion and sedimentation control plan to the soil and water conservation district for its review and approval or disapproval concerning the adequacy of the erosion and sedimentation control plan.
No land disturbance permit will be issued unless the plan has been approved by the district, and any variances and bonding, if required, have been obtained.
4. The applicant may be required by the community development department or its designee to secure land disturbance approval from other agencies if they are affected by the development. Land disturbance approval may be required from the following agencies including but not limited to:
a. County health department.
b. Soil and water conservation district.
c. Georgia Department of Transportation.
d. Georgia Department of Natural Resources.
e. US Army Corps of Engineers.
f. US Environmental Protection Agency.
5. Upon receipt of comments from these and other departments and agencies as required, the community development department or its designee will indicate on a copy of the civil design and construction drawings or in writing all comments related to compliance with this development code, conditions of zoning approval, and other regulations or ordinances, as appropriate.
6. The community development department or its designee will forward its comments to the applicant.
7. The applicant will be responsible for compliance with all codes, regulations and zoning requirements and for the satisfaction of all of the comments received. The owner will also be responsible for obtaining approval from all other agencies affected by the project.
8. Civil design and construction plans rejected three successive times without completing review due to failure to comply with city standards or good engineering practice as determined by the community development director or his/her designee shall be ineligible for resubmittal for a period of not less than 90 days.
9. No land disturbance permit will be issued unless the applicant provides a statement by the county tax commissioner's office certifying that all ad valorem taxes levied against the property and due and owing have been paid.
D. Required performance surety.
1. Stormwater performance surety. Upon approval of the stormwater management plan, but before the issuance of a building permit or land disturbance permit approval, the applicant shall be required to post a performance bond, cash escrow, or other acceptable form of performance security.
a. The amount of the surety shall not be less than the total estimated construction cost of the facilities required by the stormwater management plan.
b. The performance bond or other securities shall not be released until the following requirements have been met. The director of the community development department or his/her designee shall:
1. Perform a final inspection of the facilities and determine that they have been constructed in compliance with the stormwater management plan.
2. Determine that all provisions of the stormwater management plan have been faithfully executed.
c. A provision may be made for partial release of the amount of the bond pro rata upon completion and acceptance of various stages of development as specifically delineated, described and scheduled in the stormwater management plan. The applicant shall notify the community development department or its designee upon completion of each stage that is ready for inspection. The applicant shall provide proof of compliance with these provisions, including but not limited to proof of the sedimentary and erosion surety, to the engineering department or its designee.
2. Erosion and sedimentation performance surety. Soil erosion and sedimentation control shall follow the regulations of article 9, natural resource protection.
E. Issuance of land disturbance permit.
1. Following satisfaction of all comments, receipt of approvals from all affected agencies and receipt of all required bonds, the engineering department or its designee shall issue a land disturbance permit authorizing development activities to begin based on the approved civil design and construction drawings.
2. No land disturbance permit shall be issued unless the erosion and sedimentation control plan has been approved by the soil and water conservation district and the engineering department or its designee has affirmatively determined that the plan is in compliance with all requirements of this UDO. If the land disturbance permit is denied, the reason for denial shall be furnished to the applicant.
3. If the tract is to be developed in phases, then a separate land disturbance permit shall be required for each phase.
4. Approved civil design and construction plans. Two hard copies and one digital set of reviewed plans shall be retained by the city for record purposes. All plans on the project site for the purpose of construction by contractors, subcontractors or the developer must be plans that are the plans most recently approved by the city as part of the current land disturbance permit. No construction other than clearing or rough grading may take place prior to review of the construction plans and then only if the developer has an approved erosion control plan.
5. A holder of a land disturbance permit shall notify any successor in title as to all or any portion of the property affected by the approved land disturbance permit regarding the conditions contained in the permit. Transfer of title to any permitted property, prior to termination of the permit, shall not act to release the original title and permit holder from liability for compliance with the terms of this chapter, unless and until such time as:
a. A new permit has been issued to the successor in title; or
b. The permit has been transferred to the successor in title as follows:
1) The successor in title has submitted a request to the issuing authority in writing that the permit be transferred to him or her; and
2) The successor in title has complied with the bonding requirements of this section; and
3) The city has approved transfer of the permit in writing. Any transfer of a permit under the authority of this subparagraph shall bind the successor permit holder to the same plan, requirements, variances, and permit conditions as the former permit holder. All successors in title to permitted properties shall request in writing a transfer of the permit or shall apply for a new permit contemporaneously with their receipt of title to the permitted property, or within 20 days thereafter; failure of a successor in title to comply with this requirement, whether or not the permit of the former title holder has been terminated, shall subject the successor in title to any and all penalties prescribed by this development code.
6. Maintenance of all soil erosion and sedimentation control measures and practices, whether temporary or permanent, shall be at all times the responsibility of the owner.
7. Subsequent to issuance of a permit, and after all land-disturbing activity has ceased and the property has been stabilized to a permanent and continuous state of compliance with this chapter, the city shall inspect the property and shall terminate the permit and release the requirements for bond and/or letter of credit required by this section. The city shall make such inspections routinely in conjunction with inspections for release of paving bonds and issuance of certificates of occupancy where there is or has been construction in progress on the permitted property. For other permitted properties, inspections shall be made pursuant to request of the permit holder after payment of any required inspection fees.
8. The land disturbance permit may be suspended, revoked or modified, as to all or any portion of the land affected by the plan, upon finding that the holder or his successor in title is not in compliance with the approved erosion and sedimentation control plan or that the holder or his successor in title is in violation of this development code.
F. Deviation from or changes in plans.
1. Upon completion of review of the civil design and construction plans, no deviations or changes from the reviewed plans shall be allowed without a complete resubmittal of the plans indicating the changes with a letter of explanation as to why the changes were necessary, along with any resubmittal fee as may be set by the mayor and city council from time to time.
G. Expiration of land disturbance permit.
1. A land disturbance permit shall expire if the development activity described in the permit is not begun within six months from the date of issuance.
2. Any land disturbance permit that has expired may be renewed by the community development department or its designee within six months of expiration. If a land disturbance permit has expired for more than six months, the applicant shall be required to apply for a new land disturbance permit under the land disturbance permit approval process of this unified development ordinance.
Meetings that refer to this section
- Douglasville City Council, August 19, 2024 (Minutes)Refers to this section in the minutes: “section 10.07”, “section 10.07”, “Sec. 10.07”
- Douglasville City Council, August 5, 2024 (Minutes)Refers to this section in the minutes: “section 10.07”, “section 10.07”, “Sec. 10.07”
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.