Douglasville · Code of Ordinances
Part II - CODE / Chapter 90 - VEHICLES FOR HIRE / Article 10 - PLANS AND PERMITS
Sec. 10.08. Driveway permit.
About this text
- As published by Municode, current through 2024-12-16
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
A. No driveway connecting to a public street or a public right-of-way or public property shall be repaired or installed without first having approval from the public services director or his/her designee. If the driveway connects to a state or U.S. numbered highway, approval of the Georgia Dept. of Transportation shall be required prior to city approval.
B. Applications shall be made to the public services department or its designee for local streets, to the Georgia Department of Transportation on state and U.S. numbered highways and other streets in instances where DOT maintains access control and/or to the county where county maintained roads exist.
C. A permit shall expire for work not started within six months or completed within 12 months after issuance of a permit, and a new permit shall be required before beginning or completing the work.
History
(Ord. No. O-2024-33, § 1, 8-19-24)
Meetings that refer to this section
- Douglasville City Council, August 19, 2024 (Minutes)Refers to this section in the minutes: “section 10.08”, “Sec. 10.08”
- Douglasville City Council, August 5, 2024 (Minutes)Refers to this section in the minutes: “section 10.08”, “Sec. 10.08”
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.