Skip to content
Georgia Commons
Menu

Dunwoody · Zoning Ordinance

Appendix A - EXPIRED AND OBSOLETE ZONING DISTRICTS / Chapter 32 - UTILITIES / Article IV - SEWERS AND SEWAGE DISPOSAL / Division 4 - WASTEWATER DISCHARGE PERMITS

Sec. 32-291. Permit contents.

About this text

  • As published by Municode, current through 2020-02-10
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A wastewater discharge permit shall include such conditions as are deemed reasonably necessary by the director to prevent pass through or interference, protect the quality of the water

body receiving the treatment plant's effluent, protect worker health and safety, facilitate sludge management and disposal and protect against damage to the POTW.

(1) Wastewater discharge permits must contain:

a. A statement that indicates wastewater discharge permit duration, which in no event shall exceed three

years;

b. A statement that the wastewater discharge permit is nontransferable, except as defined in section 32-292;

c. Effluent limits based on applicable pretreatment standards;

d. Self monitoring, sampling, reporting, notification and recordkeeping requirements. These requirements

shall include an identification of pollutants to be monitored, sampling location, sampling frequency and

sample type based on federal, state or local law;

e. A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance

beyond that required by applicable federal, state or local law.

(2) Wastewater discharge permits may contain, but need not be limited to, the following:

a. Limits on the rate of discharge, time of discharge and/or requirements for flow regulation and equalization;

b. Requirements for the installation of pretreatment technology, pollution control or construction of appropriate containment devices designed to reduce, eliminate or prevent the

introduction of pollutants into the treatment works;

c. Requirements for the development and implementation of accidental discharge/slug control plans or other special conditions including management practices necessary to adequately prevent accidental, unanticipated or non-routine discharges;

d. Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the POTW;

e. Requirements for installation and maintenance of inspection and sampling facilities and equipment;

f. A statement that compliance with the wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those which become effective during the term of the wastewater discharge permit; and

g. Other conditions as deemed appropriate by the director to ensure compliance with this article and state and federal laws, rules and regulations.

History

The history line the source prints at the end of the section.

(Comp. Ords. 2008, ch. 25, art. III, div. 4, § 4)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:dunwoody/zoning/32-291@2020-02-10-7f7eb53457

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Dunwoody Zoning Ordinance, Sec. 32-291. Permit contents | Georgia Commons