Ir al contenido
Georgia Commons
Menú

Dunwoody · Ordenanza de zonificación

Appendix A - EXPIRED AND OBSOLETE ZONING DISTRICTS / Chapter 32 - UTILITIES / Article IV - SEWERS AND SEWAGE DISPOSAL / Division 4 - WASTEWATER DISCHARGE PERMITS

Sec. 32-291. Permit contents.

Sobre este texto

  • As published by Municode, current through 2020-02-10
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A wastewater discharge permit shall include such conditions as are deemed reasonably necessary by the director to prevent pass through or interference, protect the quality of the water

body receiving the treatment plant's effluent, protect worker health and safety, facilitate sludge management and disposal and protect against damage to the POTW.

(1) Wastewater discharge permits must contain:

a. A statement that indicates wastewater discharge permit duration, which in no event shall exceed three

years;

b. A statement that the wastewater discharge permit is nontransferable, except as defined in section 32-292;

c. Effluent limits based on applicable pretreatment standards;

d. Self monitoring, sampling, reporting, notification and recordkeeping requirements. These requirements

shall include an identification of pollutants to be monitored, sampling location, sampling frequency and

sample type based on federal, state or local law;

e. A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance

beyond that required by applicable federal, state or local law.

(2) Wastewater discharge permits may contain, but need not be limited to, the following:

a. Limits on the rate of discharge, time of discharge and/or requirements for flow regulation and equalization;

b. Requirements for the installation of pretreatment technology, pollution control or construction of appropriate containment devices designed to reduce, eliminate or prevent the

introduction of pollutants into the treatment works;

c. Requirements for the development and implementation of accidental discharge/slug control plans or other special conditions including management practices necessary to adequately prevent accidental, unanticipated or non-routine discharges;

d. Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the POTW;

e. Requirements for installation and maintenance of inspection and sampling facilities and equipment;

f. A statement that compliance with the wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those which become effective during the term of the wastewater discharge permit; and

g. Other conditions as deemed appropriate by the director to ensure compliance with this article and state and federal laws, rules and regulations.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Comp. Ords. 2008, ch. 25, art. III, div. 4, § 4)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:dunwoody/zoning/32-291@2020-02-10-7f7eb53457

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Dunwoody Zoning Ordinance, Sec. 32-291. Permit contents | Georgia Commons