Skip to content
Georgia Commons
Menu

Euharlee · Zoning Ordinance

Appendix A - ZONING / Article XIII - ENFORCEMENT AND BUILDING PERMITS

Sec. 13.2. Building permit and land disturbance permit required.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

It shall be unlawful to commence any land disturbance activity for the construction of any building; to commence construction of any building; to commence the moving or alteration of any building; or to commence the development of land for a use not requiring a building, until all necessary permits for such work have been issued. Building permits shall be required as listed in this Ordinance, and land disturbance permits as required by the Euharlee Soil Erosion and Sedimentation Control Ordinance. All land development or construction shall comply with the codes and ordinances in effect in Euharlee at the time the permit is issued.

13.2.1

Land disturbance permits for the development must be displayed prior to beginning any clearing or grading on any lot. All building permits must be displayed prior to beginning any construction. Such permits must be placed on a post or other structure at least three feet off the ground and no more than two feet back from the right-of-way, so as to be easily visible to the inspectors and passers-by. Such permits must be encased in a clear waterproof container to protect them from the elements, and must be legible. The permittee shall be responsible for insuring a clear and legible permit is on display at all times. In the event of damage or loss, a replacement permit shall be immediately obtained and displayed. Failure to comply with this provision shall result in an administrative fine, and the permit shall be revoked until such fine is paid.

13.2.2

All structures erected in Euharlee must comply with the provisions of the applicable Standard Building Codes.

13.2.3

No building permits shall be issued unless the applicant can show all necessary approvals from other departments, including, but not limited to, a water tap permit; a sewer tap or septic tank permit; and a driveway permit. The issuance of a land disturbance permit or recording of a final plat by the Zoning Department does not indicate approval by other necessary departments of the City. Developers proceeding with development under a land disturbance permit prior to securing necessary approvals from other departments are proceeding at their own risk.

13.2.4

No building permit shall be issued to any applicant currently in violation of this Ordinance, or any other Ordinance of Euharlee. No building permit shall issue to any applicant currently subject to a stop work order under this Ordinance, or any other Ordinance of Euharlee.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:euharlee/zoning/13.2@2026-11-11-f5d742b202

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Euharlee Zoning Ordinance, Sec. 13.2. Building permit and land disturbance permit required | Georgia Commons