Skip to content
Georgia Commons
Menu

Euharlee · Zoning Ordinance

Appendix A - ZONING / Article XIII - ENFORCEMENT AND BUILDING PERMITS

Sec. 13.3. Application for building permit.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

All applications to the Zoning Administrator for building permits shall be accompanied by development plans and a survey, in duplicate, except accessory buildings located in agriculture and residential areas, showing:

13.3.1

The actual dimensions of the lot to be built upon;

13.3.2

The size of the building to be erected;

13.3.3

The location of the building on the lot;

13.3.4

The location of existing structures on the lot, if any;

13.3.5

The number of dwelling units the building is designed to accommodate;

13.3.6

The setback lines of buildings on adjoining lots;

13.3.7

The layout of off-street parking and loading spaces;

13.3.8

A septic permit from the Health Department (if on septic); a sewer tap permit from the Bartow County Water Department if on sewer;

13.3.9

A water tap permit from the Bartow County Water Department;

13.3.10

A driveway permit from the Department of Transportation if the property fronts on a State Highway or any access is desired to a State Highway, or from the Bartow County Road Department if the property fronts on a County road or any access is desired from a County road;

13.3.11

Such other information as may be requested for determining whether the provisions of this Ordinance are being observed and complied with, including especially compliance with the street design, warranty, and acceptance criteria;

13.3.12

Such other information as may be requested by the Zoning Administrator; and

13.3.13

Certification by the applicant that he or she has complied with all other applicable regulations and ordinances.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:euharlee/zoning/13.3@2026-11-11-df66540b91

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Euharlee Zoning Ordinance, Sec. 13.3. Application for building permit | Georgia Commons