Fort Oglethorpe · Zoning Ordinance
Appendix A - UNIFIED DEVELOPMENT CODE / Chapter 5 - SIGN REGULATIONS / Article 3 - PERMIT REQUIRED, PROCEDURES
Sec. 3.1. Sign permits; when required.
About this text
- As published by Municode, current through 2026-03-26
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Except for signs that are listed under [subsection] (d) Procedures for obtaining a sign permit are contained in chapter 8, Procedures and Permits of this development code.
(b) Exemptions from permit requirements., below, or are listed under section 4.2. Signs that are exempt from regulation, a sign permit must be issued by the city before a permanent sign may be:
(1) Erected or relocated;
(2) Attached to, suspended from, or supported on a building or structure; or
(3) Altered, enlarged, or materially improved (including the replacement of a sign face with an electronic changeable copy sign).
(c) Any sign using electrical wiring and connection shall require a sign permit and an electrical permit. Such a sign permit shall become null and void if an electrical permit is not secured, if required, or if the sign for which the permit was issued has not been completed within a period of six months after the date of issuance.
(d) Procedures for obtaining a sign permit are contained in chapter 8, Procedures and Permits of this development code.
History
(Ord. No. 2021-10, § 1, 6-28-2021)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.