Fort Oglethorpe · Ordenanza de zonificación
Appendix A - UNIFIED DEVELOPMENT CODE / Chapter 5 - SIGN REGULATIONS / Article 3 - PERMIT REQUIRED, PROCEDURES
Sec. 3.1. Sign permits; when required.
Sobre este texto
- As published by Municode, current through 2026-03-26
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Except for signs that are listed under [subsection] (d) Procedures for obtaining a sign permit are contained in chapter 8, Procedures and Permits of this development code.
(b) Exemptions from permit requirements., below, or are listed under section 4.2. Signs that are exempt from regulation, a sign permit must be issued by the city before a permanent sign may be:
(1) Erected or relocated;
(2) Attached to, suspended from, or supported on a building or structure; or
(3) Altered, enlarged, or materially improved (including the replacement of a sign face with an electronic changeable copy sign).
(c) Any sign using electrical wiring and connection shall require a sign permit and an electrical permit. Such a sign permit shall become null and void if an electrical permit is not secured, if required, or if the sign for which the permit was issued has not been completed within a period of six months after the date of issuance.
(d) Procedures for obtaining a sign permit are contained in chapter 8, Procedures and Permits of this development code.
Historia
(Ord. No. 2021-10, § 1, 6-28-2021)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.