Skip to content
Georgia Commons
Menu

Fort Oglethorpe · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT CODE / Chapter 7 - INFRASTRUCTURE IMPROVEMENTS / Article 4 - STREET CONSTRUCTION STANDARDS

Sec. 4.2. Utility construction.

About this text

  • As published by Municode, current through 2026-03-26
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Prior to any base material being placed, all underground work that is to be within the right-of-way or the right-of-way subgrade shall be completed and backfilled with stone, if necessary. This includes all drainage, sewerage, water, telephone, electrical, gas, cable television, and other utilities to the end that the completed roadway will not be disturbed for the installation of any utility main or service connection for any utility.

(b) Sanitary sewers and storm sewers shall be constructed in accordance with the requirements of this chapter.

(c) All underground utility conduits and piping shall be installed prior to proof rolling and placement of base material. Installation and backfill shall be observed by the developer's geotechnical engineer. In the event all utility construction is not complete due to circumstances beyond the control of the developer and/or contractor, proof rolling and placement of base material may begin subject to completion of all underground conduits and piping beneath the road and two feet beyond the edge the proposed base material. Sanitary sewer tests shall be coordinated with the respective city representative having jurisdiction prior to base installation.

(d) Utility trenches within the roadbed shall be backfilled with either crushed rock, soil, or flowable fill according to the following requirements:

(1) Bedding.

a. All utility trenches shall be bedded with a six-inch layer of either open-graded crushed rock or sand.

b. Bedding shall be placed and compacted using a vibratory compactor.

c. Where necessary, bell holes shall be cut into the bedding at pipe joints locations.

(2) Initial fill.

a. After the utility line has been placed, the utility trench shall be backfilled with open graded crushed rock or sand to at least 12 inches over the top of the utility.

b. The backfill shall be compacted using a vibratory compactor.

(3) Secondary fill.

a. From 12 inches over the top of the utility to 18 inches below the subgrade elevation, the utility trench may be backfilled with open-graded crushed rock (one-half-inch diameter or less), sand, or soil fill.

b. Sand or soil backfill shall be placed in maximum one-foot layers and compacted.

c. Sand or soil backfill shall be compacted to achieve at least 95 percent of the standard proctor maximum dry density.

d. Density tests shall be conducted for every one-foot layer of backfill at a frequency of one test per 100 feet for utilities running along the longitudinal axis of the road, or one test for utilities crossing the road.

e. Open-graded crushed rock backfill does not require compaction in lifts, but must be consolidated using vibratory compaction equipment.

f. The placement and consolidation must be observed by the geotechnical engineer.

(4) Final backfill.

a. The final 18 inches of the utility trench backfill shall be backfilled with dense-graded crushed rock.

b. The backfill shall be compacted to achieve at least 98 percent of the standard proctor maximum dry density.

c. Density tests shall be conducted at a frequency of one test per 50 feet for utilities running along the longitudinal axis of the road, or two tests for utilities crossing the road.

(5) Flowable fill.

a. Flowable fill may be used as backfill for utility trenches.

b. The material shall be designed to achieve a compressive strength of 150 to 500 psi.

c. The material shall meet the requirements of ACI 229R-99, Standard Specifications for Controlled Low Strength Cementitious Materials.

d. Flowable fill may be used instead of the secondary fill and the final backfill.

e. The material supplier shall submit a mix design verified by an independent testing laboratory within the past six months.

(e) Open cut pavement repair shall be made in accordance with Standard Detail 211 "Open Cut Pavement Repair."

History

The history line the source prints at the end of the section.

(Ord. No. 2021-10, § 1, 6-28-2021)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:fort-oglethorpe/zoning/appendix-a-chapter-7-article-4-4.2@2026-03-26-2ad83c813d

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Fort Oglethorpe Zoning Ordinance, Sec. 4.2 (Appendix A, Chapter 7, Article 4). Utility construction | Georgia Commons