Fort Oglethorpe · Zoning Ordinance
Appendix A - UNIFIED DEVELOPMENT CODE / Chapter 7 - INFRASTRUCTURE IMPROVEMENTS / Article 9 - RIGHT-OF-WAY PROTECTION
Sec. 9.3. Driveway permit required.
About this text
- As published by Municode, current through 2026-03-26
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) No driveway connecting to a public street or a public right-of-way or public property shall be repaired or installed without first having approval from the public works department. If the driveway connects to a state or U.S. numbered highway, approval of the Georgia Department of Transportation shall be required.
(b) Application shall be made to the public works department for processing (see Standard Detail 213). Approved permits will be issued by the public works director or his/her assign.
(c) A permit shall expire for work not started within 90 days or completed within six months after issuance of permit, and a new permit shall be required before beginning or completing the work.
History
(Ord. No. 2021-10, § 1, 6-28-2021)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.