Fort Oglethorpe · Zoning Ordinance
Appendix B - SCHEDULE OF FEES AND CHARGES
Appendix B. SCHEDULE OF FEES AND CHARGES
About this text
- As published by Municode, current through 2026-03-26
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Range Min. Due Rate per 10,000 $0.00 $25.00 22.60 in excess of $0.00 $100,000.00 $251.00 17.60 in excess of 100,000.00 $400,000.00 $779.00 13.20 in excess of 400,000.00 $700,000.00 $1,175.00 12.70 in excess of 700,000.00 $1,000,000.00 $1,556.00 11.90 in excess of 1,000,000.00 $1,300,000.00 $1,913.00 11.70 in excess of 1,300,000.00 $2,000,000.00 $2,732.00 10.00 in excess of 2,000,000.00 $3,500,000.00 $4,232.00 9.50 in excess of 3,500,000.00 $6,000,000.00 $6,607.00 8.40 in excess of 6,000,000.00 $14,000,000.00 $13,327.00 7.10 in excess of 14,000,000.00 Hotel/motel tax.
Six percent.
Millage rate.
6.632 (2018).
Residential Water Fees and Rates " water meter installation $250.00 1" water meter installation $600.00 >1" water meter installation Cost + 10% Connection fee $700.00 per unit Deposit/homeowner $75.00 Deposit/rental unit $125.00 Deposit/master meter $400.00 Monthly Water Usage < 2,000 gallons inside city $17.49 Additional gallons inside city $4.62/1,000 gallons Administrative fee $45.00
Tampering fee $250.00 Residential Sewer Fees and Rates Connection fee $700.00/dwelling unit Monthly Sewer Usage <2,000 gallons inside city $22.91 Additional gallons inside city $6.04/1,000 gallons <2,000 gallons outside city $29.79
Additional gallons outside city $7.85/1,000 gallons Residential Sewer Fees and Rates
*Catoosa Utility and Tennessee American customers may incur additional processing fees.
Commercial Water Fees and Rates <1" water meter installation $850.00 >1" water meter installation Cost + 10% Connection fee <1" $1,500.00 Connection fee 1.5" $1,750.00 Connection fee >1.5" Cost + 10% Deposit <1" $150.00 Deposit 1.5" $175.00 Deposit 2" $200.00 Deposit 3" $225.00 Deposit 4" $250.00 Deposit 6" $300.00 Deposit 8" $350.00 Deposit 10" $400.00 Deposit 12" $450.00 Monthly Water Usage >2,000 gallons $22.96 Additional gallons $8.87/1,000 gallons Administrative fee $125.00 Tampering fee $300.00 Commercial Sewer Fees and Rates Single unit connection fees Connection fee <4" $2,000.00 Connection fee 6" $2,500.00 Connection fee 8" $3,000.00 Multi-Unit Connection Fees 2—6 units $1,500.00/unit 7—10 units $1,000.00/unit 11—15 units $750.00/unit 16—20 units $500.00/unit >20 units $350.00/unit Hotel/motel $150.00/unit Nursing home/hospital $200.00/licensed bed Monthly Sewer Usage
<2,000 gallons inside city $29.35 Additional gallons inside city $11.49/1,000 gallons
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.