Ir al contenido
Georgia Commons
Menú

Fort Oglethorpe · Ordenanza de zonificación

Appendix B - SCHEDULE OF FEES AND CHARGES

Appendix B. SCHEDULE OF FEES AND CHARGES

Sobre este texto

  • As published by Municode, current through 2026-03-26
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Range Min. Due Rate per 10,000 $0.00 $25.00 22.60 in excess of $0.00 $100,000.00 $251.00 17.60 in excess of 100,000.00 $400,000.00 $779.00 13.20 in excess of 400,000.00 $700,000.00 $1,175.00 12.70 in excess of 700,000.00 $1,000,000.00 $1,556.00 11.90 in excess of 1,000,000.00 $1,300,000.00 $1,913.00 11.70 in excess of 1,300,000.00 $2,000,000.00 $2,732.00 10.00 in excess of 2,000,000.00 $3,500,000.00 $4,232.00 9.50 in excess of 3,500,000.00 $6,000,000.00 $6,607.00 8.40 in excess of 6,000,000.00 $14,000,000.00 $13,327.00 7.10 in excess of 14,000,000.00 Hotel/motel tax.

Six percent.

Millage rate.

6.632 (2018).

Residential Water Fees and Rates " water meter installation $250.00 1" water meter installation $600.00 >1" water meter installation Cost + 10% Connection fee $700.00 per unit Deposit/homeowner $75.00 Deposit/rental unit $125.00 Deposit/master meter $400.00 Monthly Water Usage < 2,000 gallons inside city $17.49 Additional gallons inside city $4.62/1,000 gallons Administrative fee $45.00

Tampering fee $250.00 Residential Sewer Fees and Rates Connection fee $700.00/dwelling unit Monthly Sewer Usage <2,000 gallons inside city $22.91 Additional gallons inside city $6.04/1,000 gallons <2,000 gallons outside city $29.79

Additional gallons outside city $7.85/1,000 gallons Residential Sewer Fees and Rates

*Catoosa Utility and Tennessee American customers may incur additional processing fees.

Commercial Water Fees and Rates <1" water meter installation $850.00 >1" water meter installation Cost + 10% Connection fee <1" $1,500.00 Connection fee 1.5" $1,750.00 Connection fee >1.5" Cost + 10% Deposit <1" $150.00 Deposit 1.5" $175.00 Deposit 2" $200.00 Deposit 3" $225.00 Deposit 4" $250.00 Deposit 6" $300.00 Deposit 8" $350.00 Deposit 10" $400.00 Deposit 12" $450.00 Monthly Water Usage >2,000 gallons $22.96 Additional gallons $8.87/1,000 gallons Administrative fee $125.00 Tampering fee $300.00 Commercial Sewer Fees and Rates Single unit connection fees Connection fee <4" $2,000.00 Connection fee 6" $2,500.00 Connection fee 8" $3,000.00 Multi-Unit Connection Fees 2—6 units $1,500.00/unit 7—10 units $1,000.00/unit 11—15 units $750.00/unit 16—20 units $500.00/unit >20 units $350.00/unit Hotel/motel $150.00/unit Nursing home/hospital $200.00/licensed bed Monthly Sewer Usage

<2,000 gallons inside city $29.35 Additional gallons inside city $11.49/1,000 gallons

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:fort-oglethorpe/zoning/appendix-b-appendix-b-4@2026-03-26-cd5a910a5f

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Fort Oglethorpe Zoning Ordinance, Appendix B (no. 4 so numbered). SCHEDULE OF FEES AND CHARGES | Georgia Commons