Ir al contenido
Georgia Commons
Menú

Fort Oglethorpe · Ordenanza de zonificación

Appendix B - SCHEDULE OF FEES AND CHARGES

Appendix B. SCHEDULE OF FEES AND CHARGES

Sobre este texto

  • As published by Municode, current through 2026-03-26
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Commercial Sewer Fees and Rates <2,000 gallons outside city $38.15 Additional gallons outside city $14.92/1,000 gallons Fire Line Fees

2.5" $20.00 3" $25.00 4" $35.00 6" $45.00 8" $55.00 10" $95.00 12" $125.00 Fire Inspection Fees Annual fire inspection No fee 1st follow up No fee 2nd follow up $100.00 3rd follow up $250.00 4th follow up $350.00 All subsequent follow ups $400.00 Zoning Fees Annexation administration fee $100.00 Rezoning/special exception $400.00 Variance $150.00 Subdivision (1—5 lots) $200.00/lot *Each additional lot is $100.00/lot.

Residential Permit and Inspection Fees Building permit fee $62.00/feet2 (heated area) $31.00/feet2 (unheated area)

Electrical permit $85.00 Plumbing permit $85.00 Mechanical permit $85.00 Fuel gas permit $85.00 Stormwater fee $100.00 Zoning fee $100.00 Certificate of occupancy $15.00 Re-inspection fee $25.00 Residential Permit and Inspection Fees Property maintenance $85.00 Pool (above ground) $85.00 Pool (in ground) $285.00 Commercial Permit and Inspection Fees Building permit fee .6% of contract value Plan review fee building permit fee

Electrical permit .6% of projected bid Minimum fee is $85.00 Plumbing permit .6% of projected bid Minimum fee is $85.00 Mechanical permit .6% of projected bid Minimum fee is $85.00 Fuel gas permit .6% of projected bid Minimum fee is $85.00 Sprinkler system .6% of projected bid Minimum fee is $85.00 Fire alarm system .6% of projected bid Minimum fee is $85.00 Pool (in ground) .6% of projected bid Minimum fee is $85.00 Kitchen hood .6% of projected bid Minimum fee is $85.00 Stormwater fee $100.00 Zoning fee $100.00 Certificate of occupancy $15.00 Re-inspection fee $25.00 (Ord. No. 2019-24, 7-22-2019)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:fort-oglethorpe/zoning/appendix-b-appendix-b-5@2026-03-26-f58fe316d9

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Fort Oglethorpe Zoning Ordinance, Appendix B (no. 5 so numbered). SCHEDULE OF FEES AND CHARGES | Georgia Commons