Glynn County · Zoning Ordinance

Article 5 - TELECOMMUNICATION USES

5.1.8. Application Procedures

About this text

  • As posted on the county's website, retrieved 2026-11-23

A. Application Requirements Application for a building permit or Special Use Permit for any telecommunications facility must be made to the Planning & Zoning Department by the person, company, or organization that will own and operate the telecommunications facility. The following information must be submitted for an application to be considered complete:

1. Basic Information.

a. Site plan drawn to scale specifying the location of the telecommunications facility, transmission building, and/or other accessory uses, as well as driveways, parking, fences, landscaped areas, and adjacent properties and their zoning. The site plan must also include information on camouflaging and concealment measures.

b. Landscape plan to scale indicating size, spacing, and type of plants required in Sec. 5.1.7.A.7.

c. A full description of the effects that the proposed telecommunications facility will have on the environment and surrounding area, including the impacts on adjacent residential structures and zoning districts, impacts on structures and sites listed on the Georgia or National Registry of Historic Places, and impacts on the view from surrounding sites and public rights-of-way.

d. A description of anticipated maintenance needs, including frequency of service, personnel needs, equipment needs, and traffic, noise, or safety impacts of maintenance.

e. Report from a professional structural or radio frequency engineer licensed in the State of Georgia, documenting the following:

i. Telecommunications facility height and design, including technical, engineering, economic, and other pertinent factors governing selection of the proposed design;

ii. Total anticipated capacity of the telecommunications facility, including number and types of antennae that it can accommodate;

iii. Evidence of structural integrity of the tower structure;

iv. Structural failure characteristics of the telecommunications facility and demonstration that site and setbacks are of adequate size to contain debris;

v. Certification that the proposed telecommunications facility will meet all applicable state and federal regulations; and

vi. The information required in Sec. 5.1.4.C.1 through Sec. 5.1.4.C.4.

f. A map showing all sites from which needed coverage could be provided, indicating the zoning for all such alternative sites.

g. Photo simulations of the proposed project to illustrate the potential visual impacts of the activity.

h. Written documentation demonstrating that the radio frequency emissions from the proposed project are within the limits set by the FCC.

i. The name, address, phone number, and email address of a community liaison officer appointed by the applicant to resolve issues of concern to neighbors and residents related to the construction and operation of the facility. This officer must document the complaints of neighbors and the applicant’s reactions to the complaints. This documentation must be provided to the County annually or when requested by the County.

j. Identification of the geographic service area for the subject installation, including a map showing the site and the nearest or associated telecommunications facility sites within the network. Describe the distance between the telecommunications facility sites and how this service area fits into and is necessary for the service network.

k. Designation of which type of preferred location site, identified in Sec. 5.1.5, the proposed facility is. If the proposed location is not a preferred location 1 through 4 or is a disfavored site, provide a list of all publicly-used buildings, co-location sites, and other preferred location sites within the service area with addresses as well as a map at 1:200 scale; and describe:

i. What good faith efforts and measures were taken to secure each preferred location site;

ii. Why each such site was not technologically, legally, or economically feasible and why such efforts were unsuccessful; and

iii. How and why the proposed site is essential to meet service demands for the service area and countywide network.

2. Five-Year Plan and Site Inventory. Each application must include a five-year facilities plan and site inventory that includes:

a. A description of the type of technology the company/carrier will provide to its customers over the next five (5) years, including the radio frequencies to be used for each technology and the types of consumer services to be offered.

b. A list of all existing, existing to be upgraded or replaced, and proposed telecommunications facility sites in Glynn County and within one mile of the County’s limits, and a map showing these sites. The list must include the following information for each site:

i. Street address;

ii. Parcel identification number;

iii. Zoning district;

iv. Type of building (commercial, residential, mixed use) and number of stories;

v. The number of antennae and base transceiver stations per site and the location and type of antenna installation (stand-alone rooftop, building facade, etc.) and location of the base receiver station installation(s);

vi. The height of the facility; and vii. The radio frequency range in megahertz and the wattage output of the equipment.

c. If the applicant does not know specific future tower and antenna site locations but does know of areas where facilities will be needed within the next five years to provide service, the applicant must list the tax map number for the anticipated service area and identify each service area with a number that corresponds to the future telecommunications facility site.

3. Additional Information Requirements for Towers.

a. The applicant must quantify the additional tower capacity anticipated, including the approximate number and types of antennae. The applicant must also describe any limitations on the ability of the tower to accommodate other uses, e.g., radio frequency interference, mast height, frequency, or other characteristics. The applicant must describe the technical options available to overcome those limitations and reasons why the technical options considered were not chosen to be incorporated. The Planning Commission must approve those limitations if they cannot be overcome by reasonable technical means.

b. The applicant must provide a utilities inventory showing the locations of all water, sewage, drainage, and power lines impacting the proposed tower site or which will be impacted by the proposed tower.

c. The applicant must provide any other information which may be requested by the Planning Commission to fully evaluate and review the application and the potential impact of the proposed facility.

B. Factors Considered in Granting Approval of Towers The Planning Commission must consider the following factors in determining whether to approve the height or design of a proposed tower, although the Planning Commission may waive or reduce the burden on the applicant of one or more of these criteria if the Planning Commission concludes that the goals of this ordinance are better served thereby.

1. Height of the proposed tower.

2. Proximity of the tower to residential structures and residential zoning districts.

3. Nature of uses on adjacent and nearby properties.

4. Surrounding topography.

5. Surrounding tree coverage and foliage.

6. Design of the tower, with reference to design characteristics that have the effect of reducing or eliminating visual obtrusiveness.

7. Proposed ingress and egress on the site.

8. Availability of suitable existing towers and other structures found in Sec. 5.1.4.

C. Expedited Building Permit Review Only When a telecommunications facility is a preferred location site or a monopole tower no more than 150 feet tall which requires only a building permit and design review and approval before it may be erected, the Planning & Zoning Department will expedite review of the application and render a decision on the application within 30 days after receipt of a complete application.

D. Special Use Permits Before recommending approval of a Special Use Permit to the Board of Commissioners, the Planning Commission must determine that the benefits of and need for the proposed tower to the public are greater than any possible negative effects and damage to neighboring properties.

E. FAA and Airport Commission Approval

1. Proposals for structures over 200 feet in height or within the Airport Overlay must be reviewed by the Airport Commission as part of the established development application review process and prior to review by the Planning Commission. Applicants must provide a digital copy of the application to the Airport Manager for review.

2. The Airport Executive Director must provide a recommendation in writing as to the effect the structure may have on the utility of the airport’s associated airspace.

3. Compliance with FAA and FCC regulations is required and is the responsibility of the applicant.

4. Sec. 6.6.3, the Airport Overlay, will take precedence over this section when there is a conflict with regard to the design, placement, or height of telecommunication facilities.

F. Change of Ownership Notification Upon the transfer of ownership of any telecommunications facility or lot on which a facility has been erected, the owner must notify the Planning & Zoning Department of the transaction in writing within 30 days.

Read this code where it is posted (county website (glynncounty.org)) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:glynn-county/zoning/5.1.8@2026-11-23-e8dd686c9e

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Glynn County Zoning Ordinance, 5.1.8. Application Procedures | Georgia Commons