Gordon County · Zoning Ordinance
Chapter 3 - PROTECTION OF NATURAL FEATURES AND RESOURCES
3.03.06. Groundwater Protection Standards
About this text
- As published by Municode, current through 2024-03-19
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
A. For all pollution susceptibility areas, new waste disposal facilities must have synthetic liners and leachate collection systems.
B. New agricultural impoundments shall meet the following requirements:
1. For areas of high susceptibility, a liner shall be provided that is approved by the Natural Resource and Conservation Service (NRCS).
2. For areas of medium susceptibility, an NRCS approved liner shall be provided if the site exceeds fifteen (15) acre-feet.
3. For areas of low susceptibility, an NRCS approved liner shall be provided if the site exceeds fifty (50) acre-feet.
C. No land disposal of hazardous waste shall be permitted within any significant groundwater recharge area.
D. For all significant groundwater recharge areas, the handling, storage and disposal of hazardous materials shall take place on an impermeable surface having spill and leak protection approved by the Georgia Department of Natural Resources, Environmental Protection Division (EPD).
E. For all significant groundwater recharge areas, new aboveground chemical or petroleum storage tanks larger than six hundred fifty (650) gallons must have secondary containment for one hundred ten (110) percent of tank volume or one hundred ten (110) percent of the largest tanks in a cluster of tanks.
F. For high pollution susceptibility areas, new wastewater treatment basins shall have an impermeable liner approved by EPD.
G. For high pollution susceptibility areas, no new stormwater infiltration basins may be constructed.
H. For high pollution susceptibility areas, wastewater spray irrigation systems or the land spreading of wastewater sludge shall be practiced in accordance with department of natural resources criteria for slow rate land treatment. An application for a development permit for activities involving wastewater spray irrigation or land spreading of wastewater sludge must be accompanied by proof that the applicant has received a land application system permit from EPD.
I. Minimum lot sizes and septic systems. To provide for the orderly and safe development of property utilizing on-site sewage management systems, minimum lot sizes have been established. Larger lot sizes may be required depending on the proposed development of the property. The Board of Health and/or other County authorities may require larger minimum lot sizes; the larger minimum lot sizes will take precedence.
Lot sizing requirements are as follows for single-family dwellings such as mobile homes, stick built homes, modular homes, etc. on individual lots in subdivisions and mobile home lots located in areas other than commercial mobile home parks. See Tables 3.03.06(A) and 3.03.06(B) below.
Table 3.03.06(A) Minimum Lot Size Requirements Pollution Susceptibility New Homes Served by Septic Systems High Pollution Susceptibility 150% of minimum lot sizes specified in Table 3.03.06(B) Note: Refer to Section 3.03.04, Determination of pollution susceptibility.
Table 3.03.06(B) Minimum Lot Sizes and Maximum Allowable Sewerage Flow, Based on Type of Water Supply System
Soil Percolation Rates Minimum Lot Sizes Based on Type of Water Supply System Non-Public Public1 5—15 min. percolation 43,560 (sq. ft.) 21,780 (sq. ft.)
16—30 min. percolation 48,000 (sq. ft.) 24,000 (sq. ft.)
31—45 min. percolation 52,000 (sq. ft.) 26,000 (sq .ft.)
46—60 min. percolation 56,000 (sq. ft.) 28,000 (sq. ft.)
61—90 min. percolation 60,000 (sq. ft.) 30,000 (sq. ft.)
91—120 min. percolation 3 acres 3 acres Max Sewage Flow 600 gpad 1,200 gpad 1Zoning district may require a larger minimum lot size; reference Chapters 2 and 4 for requirements.
1. The above minimum lot sizes are for the typical size home (three- or four-bedroom) with basic appurtenances such as driveway, minimum number of trees, and water supply line. If larger homes, swimming pools, tennis courts or outbuildings, etc.
are proposed to be constructed or if trees would interfere with installation of an on-site sewage management system, larger lots will be required by the Board of Health to assure usable soil area.
2. The Board of Health will also require larger lot sizes when physical factors indicate the need to do so. These factors include, but are not limited to, the availability of sufficient unobstructed land areas for an approved on-site sewage management system and approved replacement system, slope over five (5) percent, percolation rates higher than forty-five (45) minutes per inch, and need for subsurface drainage or adverse topographic features.
3. The following land area is not considered as a part of a lot when calculating the required minimum lot size: Rights-of-way of roads, easements (such as power line or pipe line) that exclude installation of an on-site sewage management system, bodies of water, land within a floodplain, land within fifty (50) feet of a lake, river, stream, wetland or other body of water and similar limiting factors.
4. There must be an unobstructed area on each lot for installation of an approved on-site sewage management system and an equal or larger area, as appropriate, for an approved replacement system. This will include sufficient area for necessary site modifications for installation of both the initial system and replacement system. All pertinent County zoning setbacks and other space requirements must also be met.
5. The maximum daily sewage flow for each lot or parcel of land shall not exceed six hundred (600) gallons per acre per day (gpad) or one thousand two hundred (1,200) gpad when served by a non-public or public water supply system respectively.
When sewage flows exceed these quantities (six hundred (600) or one thousand two hundred (1,200) gpad as indicated) for a given dwelling structure, the minimum lot size or parcel of land shall be increased proportionally according to the following example: Assume a public water supply exists (so one thousand two hundred (1,200) gpad maximum sewage flow allowed per minimum required land area twenty-one thousand seven hundred eighty (21,780) square feet), and there is a proposed sewage flow of five thousand (5,000) gpad. To determine X = the square footage of the lot needed, use the following formula (Note: 43,560 sq. ft. = One (1) acre):
X = 5,000 gal/day = 1,200 gal/acre/day = 4.17 acres = 4.17 × 43,560 sq. ft.
= 181.500 sq. ft. area of land needed
J. Minimum lot sizes are determined based on site specific high intensity soil study conducted by approved soil classifiers. Soil classifiers are as defined in the Rules of Department of Community Health Public Health, Chapter 290-5-26, On-Site Management Systems.
1. Minimum requirements for a High Intensity Soil Study
i. A High Intensity Soil Study shall be identified as a Level III Soil Survey and Map. A Level III Soil Survey and/or Soil Map are based on a comprehensive soils investigation of a given landscape. The purpose of the soil survey is to identify, delineate and interpret the suitability of the soil series found on the site as it pertains to use for an on-site sewage management systems. The soil survey must meet or exceed specified accuracy and quality standards for the data from which the Board of Health permits on-site sewage management systems.
ii. All Level III Soil Surveys and related interpretive data shall be based on the Georgia Department of Community Health Manual for On-Site Sewage Management Systems, National Cooperative Soil Survey standards and the current Soil Survey Manual (Soil Survey Staff, 1993). Soil series used to name map units must be classified according to the most recent edition of Soil Taxonomy (Soil Survey Staff, 1999), with map unit boundaries and map features plotted on a map at a scale that may range from one inch equals ten feet (1" = 10') to one inch equals one hundred feet (1" = 100'). Smaller map scales (1" = 200', 1" = 500', etc.) are not acceptable.
iii. Level III Soil Surveys must be based on a two-foot contour interval topographic map. The topographic map and boundary survey must be provided before the beginning of any fieldwork. The soil survey must include a title block or caption that includes the project and/or client name, location of the project, date of the survey, narrative and bar scale and north arrow. The soil survey shall include any features that may affect the location or performance of on-site sewage management systems. Examples are: The location of springs, wells, existing structures, rock outcrops, ephemeral drains, gullies and visible trash pits. The soil survey must include a legend that defines any symbols used to illustrate these features on the soil map. The soil survey and soil map must bear the name, stamp, address and telephone number of the Certified Soil Classifier, Registered Engineer or Registered Geologist performing the survey. The "Official" Level III Soil Survey used for on-site sewage management system permitting is that which bears the original seal and signature of the individual performing the work. The Certified Soil Classifier, Registered Engineer or Registered Geologist shall affix their signature and seal only on soil surveys that are their work or work performed under their direct supervision. Any revision to a Level III Soil survey must be clearly designated as such and dated.
iv. The Level III Soil Survey must include a table or narrative that describes site-specific properties of each map unit (named for soil series) mapped at the site. For each map unit, the table or narrative must include the following: soil series name (symbols are not allowed), the percent slope or slope range (symbols are not allowed), minimum depth (range is unnecessary) to seasonal saturation (seasonal high water table), minimum depth (range is unnecessary) to auger refusal or impervious layer (soft or hard bedrock or other horizons that restrict water movement), recommended installation depth (if applicable) and estimated percolation rate at the recommended installation depth (if applicable). The estimated percolation rate shall be based on the most limiting soil horizon that comes into contact with the absorption trench sidewall, bottom and for a distance one (1) foot below the recommended installation depth.
v. The upper and lower depth limits of the horizon in which installation is recommended shall be provided for each map unit. The depth range over which installation is recommended must be at least twenty-four (24) inches to encompass a twelve-inch sidewall thickness and twelve (12) inches of soil below the trench bottom. If the twenty-four-inch thickness installation zone includes a horizon with lower percolation rate than the optimum, the maximum percolation rate in the depth interval must be used for on-site system design. Minimum depths to bedrock or seasonal saturation shall be provided for each map unit and specific depths identified for each boring on the soil map.
Phases of soil series are an acceptable method to map depths more narrow than those used to define the series. Variants of series have different interpretations than the named series and these differences shall be reflected in the interpretive table.
vi. An interpretive statement describing the limitations for utilization of on-site sewage management systems shall be provided for each Soil Series map unit.
This interpretive statement may contain notes, observations or other pertinent information reflecting the soil properties of the map unit that affect its ability to function for wastewater disposal. These map unit interpretation statements must be based on the soil properties and landscape positions observed on-site by the approved professional. Map unit interpretive statements shall be expressed in a narrative format on the soil survey report or soil map.
vii. The number of soil observations required for the Level III Soil Survey will depend on the soil conditions encountered during the study and landscape complexity at the site. At least four (4) pedons shall be evaluated and classified for each one (1) acre mapped. For example, if an area is 1.5 acres, a minimum of six (6) test borings must be evaluated and classified. If the site is less than one (1) acre, a minimum of four (4) pedons shall be evaluated and classified.
However, the soil classifier, registered engineer or registered geologist shall perform as many soil boring observations as necessary to ensure the named soil series or a soil series with similar or more favorable properties are verifiable on-site. All soil observations must be numbered and flagged on site and their location illustrated with a symbol and corresponding boring number on the finished soil map. All permanent and reproducible ground control points utilized to locate soil observations will be shown on the finished soil map so these observation points can be reestablished at a later date. All soil maps must contain a statement describing the method and/or instruments used to locate each soil observation from control points.
viii.Boundaries between map units are commonly gradual instead of abrupt as implied by a line drawn on a map. In addition, the boundary between map units may be difficult to locate exactly unless definitive landscape features are present or closely spaced soil observations are made to locate the boundary. To ensure that on-site sewage systems are not installed in soils unsuitable for their use, soil delineation lines between suitable soils, limited suitable soils and unsuitable soils shall be accurate to within twenty (20) feet of the delineated soil boundary. If through additional closely spaced soil observations the site evaluator can document the area within twenty (20) feet of the boundary has soils suitable for an on-site sewage system (conventional or alternative), the system may be installed closer than twenty (20) feet from the suitable-limited suitable-unsuitable boundary. The location of all observations used to determine near boundary soil suitability must be shown on the final soil map and characteristics observed must be summarized in the site report.
ix. All soil observations shall be a minimum depth of seventy-two (72) inches unless a refusal layer, including seasonal saturation horizon, is identified. If the lower limit of the recommended installation depth is greater than fortyeight (48) inches, the soil observation must be extended to no less than twenty-four (24) inches beneath this lower limit. Backhoe pits may be substituted for observations from auger borings. Mechanical augers, which disturb soil structure, shall not be used.
x. The soil classifier, registered engineer or registered geologist must keep field notes for each soil observation that include: boring number, soil series name, percent slope, depth and type of restrictive horizons present and morphological properties of major subsoil horizons (upper and lower depth, texture, matrix and redoximorphic feature color (Munsell notation)). All surveys and related interpretive data shall meet National Conservation Soil Survey (NCSS) and United States Department of Agriculture (USDA) Soil survey manual standards for map purity. Map units will not have more than fifteen (15) percent inclusions of soils with different interpretation for on-site sewage management systems from the named series.
2. Minimum requirements for special soil investigations
i. A special soil study shall be identified as a Level IV Soil Survey. The Board of Health may require special soil studies when alternative on-site sewage management systems are proposed and additional soil data are needed to adequately address site suitability and/or system design. The Board of Health should be consulted prior to the initiation of the special investigation.
ii. The special investigation will typically be made for a specific location within an individual lot or parcel in the area proposed for the installation of an on-site sewage management system. Special investigations may include measurement of percolation rate for specific horizons, excavations to determine bedrock hardness and continuity, monitoring seasonal groundwater tables or other similar data that may be needed to aid in the interpretation of soil suitability and the protection of ground and surface water. Finished soil reports will have clear and obvious designations as to information that is Level III and/or Level IV.
iii. A Level IV Soil Survey expands on the existing Level III Soil Survey in thoroughness and/or detail. Results of the Level IV soil investigation should be presented in a format similar to that of the Level III soil investigation, including a map with more detailed soil delineations and/or location of measurements, an interpretive table and, if needed, narrative statements describing methods and results that impact suitability for an on-site sewage management system. The Level IV Soil Survey shall meet all minimum requirements of the Level III Soil Survey, with the exception that test boring sites from the previous Level III investigation may be used for the Level IV investigation. There is no minimum number of pedon observations required for a Level IV. At a Level IV intensity, individual soil series are expected to be mapped and delineated with such a degree of accuracy that, at any location chosen to investigate within a given map unit, the named soil series or one with similar or more favorable properties for the installation of an on-site wastewater management system must be verifiable. The name, official seal and signature of the Certified Soil Classifier, Registered Engineer or Registered Geologist performing the investigation must be on the report.
3. Soil data acceptability for individual lots
i. Soil evaluations on individual lots shall be performed by the following individuals: A Certified Soil Classifier, Registered Engineer or Registered Geologist if a Level 3 Soil Survey is required.
ii. With the approval of the Board of Health, an Environmental Health Specialist I or higher, District Environmental Health Director, DCH Environmental Health Program Director, meeting the following requirements, may conduct soil investigations for individual lots for single family residences: A Level II Inspector Certification; and, successfully passes a field examination demonstrating the ability to identify soil texture and expected percolation rate, identify redoximorphic features and identify restricted or impervious soil horizons.
iii. Individuals who are approved by the Board of Health that perform soil evaluations on individual lots for single-family residences shall follow the following protocols: A minimum of three (3) soil borings shall be dug in the proposed location of the on-site sewage management system absorption field and duplicate absorption field area; and, all borings shall be dug to a minimum depth of seventy-two (72) inches unless a refusal layer is identified or to no less than twenty-four (24) inches beneath the planned absorption trench bottom installation depth.
iv. A soil report shall be made containing: a sketch identifying boring locations; a table identifying boring number, expected percolation rate and depth at which it occurs, the depth of seasonal high water table and depth of any refusal layer;
and, sites with poor percolation, redoximorphic features or impervious soil horizons within twenty-four (24) inches of the planned absorption trench bottom, a seasonal high water table within thirty (30) inches of the original ground surface or any other questionable soil features will be referred to a certified soil classifier, registered engineer or registered geologist for evaluation.
4. Evaluation of soil for use as fill material
i. Evaluation of soil for use as fill material on individual lots may be performed by the following individuals: a Certified Soil Classifier, Registered Engineer or Registered Geologist; with approval of the Board of Health, a Level II Certified Environmental Health Specialist I or higher, who has successfully completed training and demonstrated proficiency in soil fill evaluation may approve soil for fill material.
ii. Individuals approved by the Board of Health to perform soil evaluations of fill material shall follow the following protocols: a minimum of four (4) borings shall be dug within the in place fill material; all borings shall be dug to a minimum depth twelve (12) inches below the original soil surface; and, a fill site evaluation form shall be completed providing evidence that the vegetative topsoil has been removed and fill area properly tilled, the soil fill is examined for texture and fines, the percolation rate is estimated, and the size of the filled area is identified and the filled area properly sloped.
History
(Res. of 12-20-11)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.